ML12335A605
| ML12335A605 | |
| Person / Time | |
|---|---|
| Site: | Indian Point |
| Issue date: | 12/22/2011 |
| From: | - No Known Affiliation |
| To: | Atomic Safety and Licensing Board Panel |
| SECY RAS | |
| References | |
| RAS 21642, 50-247-LR, 50-286-LR, ASLBP 07-858-03-LR-BD01, Indian Point | |
| Download: ML12335A605 (2) | |
Text
United States Nuclear Regulatory Commission Official Hearing Exhibit In the Matter of:
Entergy Nuclear Operations, Inc.
(Indian Point Nuclear Generating Units 2 and 3)
ASLBP #: 07-858-03-LR-BD01 Docket #: 05000247 l 05000286 Exhibit #:
Identified:
Admitted:
Withdrawn:
Rejected:
Stricken:
Other:
RIV000087-00-BD01 10/15/2012 10/15/2012 RIV000087 Submitted: December 22, 2011 c.\\.t.p.~RfG(J~",
l¥ ':
0
~
vI
...;..~
0-
~
Potential Sources of Tritium at IPEC Inspection method Tanks and Pools Unit IFuel Pool MW-42, MW-39, Pool level monitoring, HTO mass balance Unit 2 Fuel Pool Leak collection box, MW-30, Pool level monitoring, Boron Regression Analysis Unit 3 Fuel Pool Tell tale drain system, Pool level monitoring, MW-44, MW-45 Unit 2 RWST MW-42, physical inspection Unit 3 RWST MW-39, MW-41, physical inspection Unit 2 CVCS Tanks MW-42, physical inspection Unit 3 CVCS Tanks MW-42, MW-43, physical inspection Unit 2 Waste Hold-up Tanks MW-42, physical inspection Unit 3 Waste Hold-up Tanks MW-41, MW-43, physical inspection U2 SFP Transfer Canal MH-5 sample, physical inspection Above and below ground Piping Unit I Waste Transfer Line Unit 2 and 3 RWST Lines Unit 3 to Unit 2 Blowdown Transfer Line Unit 2 and 3 Vapor Containment (VC) foundation drain Unit I foundation drain Unit I CSB foundation drain Miscellaneous drains between buildings Building Sumps I PEC00065506
Unit 2 & 3 P AB Sumps Unit 2 MOB sump Unit 3-Room with the rock, had pipe trench from P AB spilling into area below cable tunnel Unit 2 Transformer Yard - Turbine hall condensate drainage Other Legacy Releases / Spills 50.75(g) records Unit 2 Resin Spill in alleyway next to FSB Unit 2 Blowdown atmospheric release Unit 2 SG Tube Leak Feb 2000 Unit 3 Area between VC, FSB, P AB, (aka Pigeon Pit)
Unit 3 Sewage septic field Unit 3 SG Tube Leak Oct 1989 Unit 3 RWST base of hill contaminated water stream IPEC00065507