Official Exhibit - NYS000084-00-BD01- the Feasibility of Re-Powering Keyspan'S Long Island Electric Generating Plants to Meet Future Energy Needs, Long Island University, Center for Management Analysis (Aug. 6, 2002) Excerpted: Pp. 7-8ML12334A545 |
Person / Time |
---|
Site: |
Indian Point ![Entergy icon.png](/w/images/7/79/Entergy_icon.png) |
---|
Issue date: |
12/14/2011 |
---|
From: |
Atomic Safety and Licensing Board Panel |
---|
To: |
|
---|
SECY RAS |
References |
---|
RAS 21536, 50-247-LR, 50-286-LR, ASLBP 07-858-03-LR-BD01 |
Download: ML12334A545 (3) |
|
|
---|
Category:Legal-Exhibit
MONTHYEARML15337A3522015-11-17017 November 2015 Official Exhibit - NYS000582-00-BD01 - Diagram of Strength Vs Amplitude by Dr. Richard T. Lahey ML15337A3372015-11-11011 November 2015 Official Exhibit - ENTR00726-00-BD01 - Track 2 Hearing Exhibit List ML15337A3322015-11-0505 November 2015 Official Exhibit - ENT000726-00-BD01 - Entergy Track 2 Hearing Exhibit List ML15337A3352015-11-0505 November 2015 Official Exhibit - RIVR14001-00-BD01 - Riverkeeper Tailored Track 2 Exhibit List ML15337A3362015-11-0505 November 2015 Official Exhibit - NRCR10001-00-BD01 - NRC Staff Track 2 Exhibit List ML15337A3332015-11-0404 November 2015 Official Exhibit - NYSR25001-00-BD01 - NYS Revised Tailored Exhibits List Relevant to Track 2 Contentions ML15337A3312015-11-0303 November 2015 Official Exhibit - NRC000230-00-BD01 - Corrections to Prefiled Testimony NRC000168 and NRC000197 ML15337A3262015-10-29029 October 2015 Official Exhibit - ENT000722-00-BD01 - Supplemental Testimony of Entergy Witnesses Nelson Azevedo, Timothy Griesbach & Randy Lott ML15337A3292015-10-29029 October 2015 Official Exhibit - ENTR16001-00-BD01 - Entergy Revised Exhibit List ML15337A3242015-09-23023 September 2015 Official Exhibit - NYS000576-00-BD01 - Pre-Filed Supplemental Testimony of Richard T. Lahey Re Contentions NYS-25, NYS-26B/RK-TC-1B & NYS-38/RK-TC-5 ML15337A3072015-09-0909 September 2015 Official Exhibit - NYS000573-PUB-00-BD01 - Supplemental Reply Statement of Position of the State of New York and Riverkeeper, Inc. in Support of Contention NYS-38/RK-TC-5 (Public, Redacted) (September 9, 2015) ML15337A2962015-09-0909 September 2015 Official Exhibit - NYS000570-PUB-00-BD01 - Supplemental Reply Statement of Position of the State of New York and Riverkeeper, Inc. in Support of Contention NYS-26B/RK-TC-1B (Public, Redacted) (September 9, 2015) ML15337A2832015-09-0909 September 2015 Official Exhibit - NYS000563-00-BD01 - Pressurized Water Reactor (PWR) Systems, USNRC Technical Training Center, Reactor Concepts Manual, Pages 4-1 to 4-28 ML15337A2952015-09-0909 September 2015 Official Exhibit - NYS000569-PUB-00-BD01 - Pre-filed Supplemental Reply Testimony of Richard T. Lahey, Jr. in Support of Contention NYS-26B/RK-TC-1B (Public, Redacted) (September 9, 2015) ML15337A2942015-09-0909 September 2015 Official Exhibit - NYS000568-PUB-00-BD01 - Supplemental Reply Statement of Position of the State of New York in Support of Contention NYS-25 (Public, Redacted) (September 9, 2015) ML15337A2932015-09-0909 September 2015 Official Exhibit - NYS000567-PUB-00-BD01 - Pre-filed Supplemental Reply Testimony of Richard T. Lahey, Jr. in Support of Contention NYS-25 (Public, Redacted) (September 9, 2015) ML15337A3042015-09-0909 September 2015 Official Exhibit - NYS000571-PUB-00-BD01 - Pre-filed Supplemental Reply Testimony of David J. Duquette in Support of Contention NYS-38/RK-TC-5 (Public, Redacted) (September 9, 2015) ML15337A2972015-09-0909 September 2015 Official Exhibit - RIV000164-00-BD01 - NUREG-1740, ACRS, Voltage-Based Alternative Repair Criteria: a Report to the Advisory Committee on Reactor Safeguards by the Ad Hoc Subcommittee on a Differing Professional Opinion (2001) ML15337A3062015-09-0909 September 2015 Official Exhibit - NYS000572-PUB-00-BD01 - Pre-filed Supplemental Reply Testimony of Richard T. Lahey, Jr. in Support of Contention NYS-38/RK-TC-5 (Public, Redacted) (September 9, 2015) ML15337A2822015-09-0909 September 2015 Official Exhibit - NYS000566-00-BD01 - Figure 1 for Supplemental Reply Testimony of Dr. Richard T. Lahey ML15337A3142015-09-0404 September 2015 Official Exhibit - ENTR00615-PUB-00-BD01 - Entergy'S Statement of Position Re Contention NYS-25 (Embrittlement) - Redacted ML15334A2842015-08-10010 August 2015 Official Exhibit - ENT000687-00-BD01 - NRC, Safety Evaluation Report, Topical Report on ASME Section III Piping and Component Fatigue Analysis Utilizing the Westems Computer Code (WCAP-17577, Revision 2) (Undated) ML15335A2932015-08-10010 August 2015 Official Exhibit - NRCR00104-00-BD01 - on Yee Statement of Professional Qualifications (Revised) ML15337A2642015-08-10010 August 2015 Official Exhibit - NRC000196-PUB-00-BD01 - NRC Staff'S Initial Statement of Position on Contention NYS-25 (Reactor Vessel Internals) ML15337A3192015-08-10010 August 2015 Official Exhibit - ENT000698-PUB-00-BD01 - Entergy'S Revised Statement of Position Regarding Contention NYS-38/RK-TC-5(Safety Commitments) (Aug. 10, 2015)Redacted ML15337A3202015-08-10010 August 2015 Official Exhibit - ENT000699-PUB-00-BD01 - Redacted Revised Testimony of Entergy Witnesses Nelson Azevedo, Robert Dolansky, Alan Cox, Jack Strosnider, Timothy Griesbach, Barry Gordon, Randy Lott, and Mark Gray Regarding Contention NYS-38/RK ML15337A3172015-08-10010 August 2015 Official Exhibit - ENT000678-PUB-00-BD01 - NL-07-140, Letter from F. Dacimo, Entergy, to NRC Document Control Desk, ?Reply to Request for Additional Information Regarding License Renewal Application? (Nov. 28, 2007)Redacted ML15337A2652015-08-10010 August 2015 Official Exhibit - NRC000197-PUB-00-BD01 - NRC Staff Testimony of Dr. Allen Hiser, Jeffrey Poehler, and Gary Stevens on NYS-25 and NYS-38/RK-TC-5 ML15337A2412015-08-10010 August 2015 Official Exhibit - NRCR00147-00-BD01 - NRC Staff'S Revised Statement of Position on State of New York and Riverkeeper'S Joint Contention NYS-38/RK-TC5 (Revised) ML15335A2902015-08-10010 August 2015 Official Exhibit - NRC000222-00-BD01 - IP3 FSAR Rev. 04 Chapter 3 (2011) (Excerpt) ML15334A2632015-08-10010 August 2015 Official Exhibit - ENT000648-00-BD01 - M. Mitchell, Chief, Vessels and Internals Integrity Branch, Response to Non-Concurrence Regarding Safety Evaluation for Topical Report MRP-227 Pressurized Water Reactor Internals Inspection and Evaluat ML15337A2622015-08-10010 August 2015 Official Exhibit - NRC000228-00-BD01 - Indian Point Unit 2 Technical Specifications 3.1.4 ML15337A2452015-08-10010 August 2015 Official Exhibit - NRC000227-00-BD01 - Gary Stevens Statement of Professional Qualifications ML15337A2632015-08-10010 August 2015 Official Exhibit - NRC000229-00-BD01 - Indian Point, Unit 3 Technical Specifications 3.1.4 ML15335A2192015-08-10010 August 2015 Official Exhibit - ENTR00031-00-BD01 - Curriculum Vitae of Alan B. Cox ML15335A2112015-08-10010 August 2015 Official Exhibit - ENTR20186-00-BD01 - Curriculum Vitae of Mark A. Gray ML15337A3162015-08-10010 August 2015 Official Exhibit - ENT000616-PUB-00-BD01 - Testimony of Entergy Witnesses Nelson F. Azevedo, Robert J. Dolansky, Alan B. Cox, Jack R. Strosnider, Timothy J. Griesbach, Randy G. Lott, and Mark A. Gray Regarding Contention NYS-25 (Embrittleme ML15337A2782015-08-10010 August 2015 Official Exhibit - NRC000168-PUB-00-BD01 - NRC Staff Testimony of Dr. Allen Hiser, Dr. Ching Ng, Mr. Gary Stevens, P.E., and Mr. on Yee, Concerning Contentions NYS-26B/RK-TC-1B and NYS-38/RK-TC-5 ML15337A2712015-08-10010 August 2015 Official Exhibit - NRC000223-00-BD01 - IP3 FSAR Rev. 04 Chapter 14 (2011) ML15337A2592015-08-10010 August 2015 Official Exhibit - NRC000224-00-BD01 - IP3 FSAR Rev. 04 Chapter 16 ML15337A2442015-08-10010 August 2015 Official Exhibit - NRCR00161-00-BD01 - NRC Staff Testimony of Dr. Allen L. Hiser and Mr. Kenneth J. Karwoski Concerning Portions of State of New York and Riverkeeper, Inc. Joint Contention NYS-38/RK-TC5 (Revised) ML15334A2822015-08-10010 August 2015 Official Exhibit - ENT000680-00-BD01 - Curriculum Vitae of Barry M. Gordon ML15335A2912015-08-10010 August 2015 Official Exhibit - NRCR00118-00-BD01 - Indian Point Unit 3 Technical Specifications (Excerpt) (Revised) ML15334A2282015-08-10010 August 2015 Official Exhibit - ENT000634-00-BD01 - Entergy, IP2, FSAR Update, Revision 25 (2014) (Excerpts) ML15335A2822015-08-10010 August 2015 Official Exhibit - NRC000220-00-BD01 - Pressurized Water Reactor Owners Group (PWROG) Presentation Slides, Industry and NRC Coordination Meeting Materials Programs Technical Exchange: Clevis Insert Bolt Update, (June 2014) ML15337A2692015-08-10010 August 2015 Official Exhibit - NRC000169-00-BD01 - NRC000169 - Indian Point, Unit 2 Technical Specifications (Excerpt) ML15337A2602015-08-10010 August 2015 Official Exhibit - NRC000226-00-BD01 - Jeffrey C. Poehler Statement of Professional Qualifications ML15335A2732015-08-10010 August 2015 Official Exhibit - NRC000183-00-BD01 - NRC Inspection Manual, Inspection Procedure 71013, Site Inspection for Plants with a Timely Renewal Application (Sept. 25, 2013) ML15335A2202015-08-10010 August 2015 Official Exhibit - ENTR00184-00-BD01 - Curriculum Vitae of Jack R. Strosnider ML15335A3012015-08-10010 August 2015 Official Exhibit - NRC000206-00-BD01 - Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Rev. 25, Chapter 14 - Safety Analysis (2014) 2015-09-09
[Table view] |
Text
NYS000084 United States Nuclear Regulatory Commission Official Hearing Exhibit Submitted: December 14, 2011 Entergy Nuclear Operations, Inc. EXCERPT In the Matter of:
(Indian Point Nuclear Generating Units 2 and 3) c.\.~P.R REGlJ~" ASLBP #: 07-858-03-LR-BD01 P~~"
Docket #: 05000247 l 05000286 Exhibit #: NYS000084-00-BD01 Identified: 10/15/2012 I-
~ -'
~
0'!:
r;;
Admitted: 10/15/2012 Withdrawn:
~4: O~ Rejected: Stricken:
" ** ** ... ... Other:
The Feasibility of Re-Powering KeySpan 's Long Island Electric Generating Plants To Meet Future Energy Needs August 6, 2002 LONG ISLAND UNIVERSITY Center for Management Analysis College of Management School of Public Service Long Island University/C.W. Post Campus Brookville, N. Y. 11548 (516) 299-2716 OAGI0000144_000001
INTRODUCTION The existing Keyspan steam electric plants can be grouped into three categories by size; lOOMW, 175MW and 375 MW. The facilities within these categories are essentially identical, each using turbine-generators manufactured by General Electric. In light of the continued growth in demand for electricity on Long Island and the difficulties in licensing new greenfield facilities and providing transmission interconnections, these older, less efficient plants will continue to remain in service for the foreseeable future. This is the case whether they are re-powered or simply operated in their present configurations. To ensure that these existing plants operate reliably and are available during the periods of highest demand for electricity, KeySpan should continue to provide each of these facilities with the appropriate maintenance and repair for "life extension" .
The re-powering of each of these older units entails the abandonment or removal of the boiler and the integration of modern combustion turbines and heat recovery steam generators with the existing turbine generator. This fairly straight forward and well proven "combined cycle" technology uses the exhaust gases from combustion turbines in heat recovery steam generators to operate the turbine generator carried over from the existing plant. The output from the existing generator is combined with the generation from the new combustion turbines. As such the total output of the converted unit is about two and a half to three times the original nameplate capacity, depending on the specifics of the facility converted. The nearly doubling in efficiency of the re-powered unit as compared to the existing unit comes from the fact that the exhaust from the combustion turbines, which normally would be a waste product, is utilized to make the steam used by the existing turbine-generator. In addition to the turbine generator many other components from the existing unit are retained, including the cooling system.
7 OAGI0000144_000011
In addition to re-powering the existing steam electric plants, it would also be possible, as natural gas becomes available, to convert the existing 240 MW simple cycle combustion turbines at the Wading River (Shoreham) Site to combined cycle.
The environmental benefits of re-powering are compelling. Improvement in efficiency from about 35% to close to 60% in the conversion of fuel to electricity can be achieved. The resulting reduction in fuel burned for a given amount of generation will be significantly less nitrogen oxides and carbon monoxide emitted. Modern combined cycle units have state of the art emission control systems in contrast to the older steam electric units with no such controls. The re-powered units achieve emission reductions immediately since they replace higher emitting, older units that would likely continue to operate in an expansion program of new greenfield projects.
To support the contention that the re-powering of the existing KeySpan steam electric facilities and the Wading River Combustion Turbines is a very favorable option to building new generation at greenfield sites, the following site specific conceptual designs were developed to examine the feasibility of re-powering at each existing power station:
CONCEPTUAL DESIGN FOR E. F. BARRETT The Island Park site for the E. F. Barrett Steam Electric Plant is large enough in size and is configured in a way to make it one of the best candidates for combined cycle re-powering. A conceptual design has been developed in which, initially, one of the two 175 MW units is converted to combined cycle operation. Two new 175 MW combustion turbines would be integrated with the existing steam turbine generator to produce 525MW or 350 MW more than the existing unit. Figure 1 is a heat balance diagram showing the significant operating parameters including heat rate (amount of energy required to produce a KWH of electricity), fuel 8