RBG-47303, Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)

From kanterella
(Redirected from ML12312A125)
Jump to navigation Jump to search
Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
ML12312A125
Person / Time
Site: River Bend Entergy icon.png
Issue date: 10/24/2012
From: Olson E
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
EA-12-051, RBG-47303
Download: ML12312A125 (4)


Text

Entergy Operations, Inc.

River Bend Station 5485U. S. Highway 61N St. Francisville, LA 70775 Tel 225 381 4374 v

wmm'En tf gyFax 225 381 4872 eolson@entergy.com Eric W. Olson Site Vice President RBG-47303 October 24, 2012 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

Entergy Operations', Inc. Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)

River Bend Station - Unit 1 Docket No. 050-458 License No. NPF-47

References:

1. NRC Order Number EA-12-051, Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation
2. NRC Interim Staff Guidance JLD-ISG-2012-03, Compliance with Order EA-12-051, Reliable Spent Fuel Pool Instrumentation, Revision 0, dated August 29, 2012 (ML12221A339)

RBFI-12-0158

Dear Sir or Madam:

On March 12, 2012, the Nuclear Regulatory Commission ("NRC" or "Commission") issued an order (Reference 1) to Entergy Operations, Inc. Reference 1 was immediately effective and directs Entergy to have a reliable indication of the water level in associated spent fuel storage pools. Specific requirements are outlined in Attachment 2 of Reference 1.

Reference I requires submission of an initial status report 60 days following issuance of the final interim staff guidance. The final interim staff guidance (Reference 2) was issued August 29, 2012. The purpose of this letter is to provide the initial status report pursuant to Section IV, Condition C.2, of Reference 1 within 60 days following issuance of Reference 2.

This report confirms Entergy has received Reference 2 and is in the process of evaluating the guidance for the purpose of providing a reliable indication of the water level in associated spent fuel storage pools as described in Attachment 2 of Reference 1.

4LUAUC

RBG-47303 October 24, 2012 Page 2 of 4 Major activities completed during this reporting period:

Resources are being identified and project plans initiated, including development of milestones, to assure compliance with Reference 1.

Planned activities for the next six months:

0 Development and submittal of the overall inteqrated plan.

Technical difficulties encountered that could affect the ability to provide the licensee's February 28, 2013, submittal:

None at this time.

Project milestones schedule through completion of installation and testing:

" A project milestones schedule will be provided with the overall integrated plan.

Implementation of the order will be completed for River Bend Station - Unit 1 prior to startup from refueling outage no. 18 (Spring 2015).

This letter contains no new regulatory commitments. If you have any questions regarding this report, please contact Mr. Joey Clark at 225-381-4177.

I declare under penalty of perjury that the foregoing is true and correct. Executed on October 24, 2012.

Respectfully submitted, EWO/dhw cc:

Regional Administrator U. S. Nuclear Regulatory Commission 1600 East Lamar Boulevard Arlington, TX 76011-4511 U. S. Nuclear Regulatory Commission Attn: Director, Office of Nuclear Reactor Regulation One White Flint North 11555 Rockville Pike Rockville, MD 20852

RBG-47303 October 24, 2012 Page 3 of 4 NRC Resident Inspector R-SB-14 U. S. Nuclear Regulatory Commission Attn: Mr. Alan Wang MS 8-G14 One White Flint North 11555 Rockville Pike Rockville, MD 20852 Department of Environmental Quality Office of Environmental Compliance Radiological Emergency Planning and Response Section JiYoung Wiley P.O. Box 4312 Baton Rouge, LA 70821-4312 Ms. Tracie Lowery Public Utility Commission of Texas 1701 N. Congress Ave.

Austin, TX 78711-3326 U. S. Nuclear Regulatory Commission Attn: Robert J. Fretz Jr.

OWFN, Mailstop # 4A1 5A 11555 Rockville Pike Rockville, MD 20852-2378 U. S. Nuclear Regulatory Commission Attn: Robert L. Dennig OWFN, Mailstop # 1OE1.

11555 Rockville Pike Rockville, MD 20852-2378 U. S. Nuclear Regulatory Commission Attn: Ms. Lisa M. Regner OWFN, Mailstop # 11F1 11555 Rockville Pike Rockville, MD 20852-2378 U. S. Nuclear Regulatory Commission Attn: Mr. Mr. Blake A. Purnell OWFN, Mailstop # 12D20 11555 Rockville Pike Rockville, MD 20852-2378

RBG-47303 October 24, 2012 Page 4 of 4 U. S. Nuclear Regulatory Commission Attn: Mr. Steven R. Jones OWFN, Mailstop # 10A1 11555 Rockville Pike Rockville, MD 20852-2378