MONTHYEARML24011A1982024-01-12012 January 2024 ISFSI, Notice of Organization Change for Site Vice President ML23342A1082024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan ML23353A1742023-12-19019 December 2023 ISFSI, Emergency Plan, Revision 23-04 L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 ML23339A0442023-12-0505 December 2023 Issuance of Amendment No. 68, 301 and 277 Regarding Changes to Implement the Independent Spent Fuel Storage Installation Physical Security Plan ML23326A1322023-12-0505 December 2023 Issuance of Amendment No. 67, 300 & 276 to Implement the Independent Spent Fuel Storage Installation Only Emergency Plan ML23338A2262023-12-0404 December 2023 Signed Amendment No. 27 to Indemnity Agreement No. B-19 ML23356A0212023-12-0101 December 2023 American Nuclear Insurers, Secondary Financial Protection (SFP) Program ML23242A2772023-11-30030 November 2023 NRC Letter Issuance - IP LAR for Units 2 and 3 Renewed Facility Licenses and PDTS to Reflect Permanent Removal of Spent Fuel from SFPs ML23338A0482023-11-30030 November 2023 ISFSI, Report of Changes to Physical Security, Training and Qualification, Safeguards Contingency Plan, and ISFSI Security Program, Revision 28 ML22339A1572023-11-27027 November 2023 Letter - Indian Point - Ea/Fonsi Request for Exemptions from Certain Emergency Planning Requirements for 10 CFR 50.47 and 10 CFR Part 50, Appendix E IR 05000003/20230032023-11-21021 November 2023 NRC Inspection Report Nos. 05000003/2023003, 05000247/2023003, 05000286/2023003, and 07200051/2023003 ML23100A1172023-11-17017 November 2023 NRC Response - Indian Point Energy Center Generating Units 1, 2, and 3 Letter with Enclosures Regarding Changes to Remove the Cyber Security Plan License Condition ML23050A0032023-11-17017 November 2023 Letter - Issuance Indian Point Unit 2 License Amendment Request to Modify Tech Specs for Staffing Requirements Following Spent Fuel Transfer to Dry Storage ML23100A1252023-11-17017 November 2023 Letter and Enclosure 1 - Issuance Indian Point Energy Center Units 1, 2, and 3 Exemption for Offsite Primary and Secondary Liability Insurance Indemnity Agreement ML23100A1432023-11-16016 November 2023 Letter - Issuance Indian Point Energy Center Generating Units 1, 2, and 3 Exemption Concerning Onsite Property Damage Insurance (Docket Nos. 50-003, 50-247, 50-286) ML23064A0002023-11-13013 November 2023 NRC Issuance for Approval-Indian Point EC Units 1, 2 and 3 Emergency Plan and Emergency Action Level Scheme Amendments L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23306A0992023-11-0202 November 2023 and Indian Point Energy Center, Notification of Changes in Schedule in Accordance with 10 CFR 50.82(a)(7) ML23063A1432023-11-0101 November 2023 Letter - Issuance Holtec Request for Indian Point Energy Center Generating Units 1, 2, and 3 Exemptions from Certain Emergency Planning Requirements of 10 CFR 50.47 and Part 50 ML23292A0262023-10-19019 October 2023 LTR-23-0211-RI Thomas Congdon, Executive Deputy, Department of Public Service, Chair, Indian Point Decommissioning Oversight Board, Letter Independent Spent Fuel Storage Installation Inspection and Office of the Inspector General Report-RI ML23289A1582023-10-16016 October 2023 Decommissioning International - Registration of Spent Fuel Casks and Notification of Permanent Removal of All Indian Point Unit 3 Spent Fuel Assemblies from the Spent Fuel Pit ML23270A0082023-09-27027 September 2023 Registration of Spent Fuel Casks ML23237A5712023-09-22022 September 2023 09-22-2023 Letter to Dwaine Perry, Chief, Ramapo Munsee Nation, from Chair Hanson, Responds to Letter Regarding Opposition of the Release and Dumping of Radioactive Waste from Indian Point Nuclear Power Plant Into the Hudson River ML23242A2182023-09-12012 September 2023 IPEC NRC Response to the Town of New Windsor, Ny Board Certified Motion Letter Regarding Treated Water Release from IP Site (Dockets 50-003, 50-247, 50-286) ML23250A0812023-09-0707 September 2023 Registration of Spent Fuel Casks ML23255A0142023-08-31031 August 2023 LTR-23-0211 Thomas Congdon, Executive Deputy, Department of Public Service, Chair, Indian Point Decommissioning Oversight Board, Letter Independent Spent Fuel Storage Installation Inspection and Office of the Inspector General Report IR 05000003/20230022023-08-22022 August 2023 NRC Inspection Report 05000003/2023002, 05000247/2023002, 05000286/2023002, and 07200051/2023002 ML23227A1852023-08-15015 August 2023 Request for a Revised Approval Date Regarding the Indian Point Energy Center Permanently Defueled Emergency Plan and Emergency Action Level Scheme ML23222A1442023-08-10010 August 2023 Registration of Spent Fuel Casks ML23208A1642023-07-26026 July 2023 Village of Croton-on-Hudson New York Letter Dated 7-26-23 Re Holtec Wastewater ML23200A0422023-07-19019 July 2023 Registration of Spent Fuel Casks ML23235A0602023-07-17017 July 2023 LTR-23-0194 Dwaine Perry, Chief, Ramapo Munsee Nation, Ltr Opposition of the Release and Dumping of Radioactive Waste from Indian Point Nuclear Power Plant Into the Hudson River ML23194A0442023-07-11011 July 2023 Clarification for Indian Point Energy Center License Amendment Request, Independent Spent Fuel Storage Installation Physical Security Plan ML23192A1002023-07-11011 July 2023 Response to Request for Additional Information Regarding License Amendment Request to Revise the Emergency Plan and Emergency Action Level Scheme ML23171B0432023-06-23023 June 2023 Letter - Indian Point Energy Center - Request for Additional Information for Independent Spent Fuel Storage Installation Facility-Only Emergency Plan License Amendment ML23118A0972023-06-0606 June 2023 06-06-23 Letter to the Honorable Michael V. Lawler, Et Al., from Chair Hanson Regarding Holtec'S Announcement to Expedite Plans to Release Over 500,000 Gallons of Radioactive Wastewater from Indian Point Energy Center Into the Hudson River ML23144A3512023-05-25025 May 2023 Clementina Bartolotta of Pearl River, New York Email Against Treated Water Release from Indian Point Site ML23144A3522023-05-25025 May 2023 Loredana Bidmead of New York E-Mail Against Treated Water Release from Indian Point Site ML23144A3412023-05-25025 May 2023 Dianne Schirripa of Rockland County, New York Email Against Treated Water Release from Indian Point Site ML23144A3472023-05-25025 May 2023 David Mart of Blauvelt, New York Email Against Treated Water Release from Indian Point Site ML23144A3402023-05-25025 May 2023 Melvin Israel of New York Email Against Treated Water Release from Indian Point Site ML23144A3542023-05-25025 May 2023 Terri Thal of New City, New York Email Against Treated Water Release from Indian Point Site ML23144A3532023-05-25025 May 2023 John Shaw of New York Email Against Treated Water Release from Indian Point Site 2024-01-09
[Table view] |
Text
Enterqy Nuclear Northeast Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249 Tel (914) 254-2055 Fred Dacimo Vice President Operations License Renewal NL-12-149 October 18, 2012 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
SUBJECT:
Clarification of Underground Piping Information Provided in Letter NL-1 1-032 Regarding the License Renewal Application Indian Point Nuclear Generating Unit Nos. 2 & 3 Docket Nos. 50-247 and 50-286 License Nos. DPR-26 and DPR-64
REFERENCE:
(1) Entergy letter (NL-1 1-032), "Response to Request for Additional Information (RAI) Aging Management Programs," dated March 28, 2011
Dear Sir or Madam:
Reference (1) stated in the response to RAI 3.0.3.1.2-1 Part 5a that "Underground piping and tanks are below grade, but are contained within a tunnel or vault such that they are in contact with air and are located where access for inspection is restricted.
In-scope SSCs that are subject to aging management review at IPEC include no underground piping or tanks." Indian Point made this statement because piping located in underground vaults is periodically accessed for visual inspections during pressure tests. However, during a recent review of the NRC Interim Staff Guidance (ISG) for Buried Piping, LR-ISG-2011-03, a question was raised relative to the definition of "restricted" and whether the Indian Point definition was consistent with the intent of the ISG. As a result of this question, Entergy Nuclear Operations, Inc held a conference call with the NRC staff to clarify the definition of "restricted" as used in the ISG.Although definition of the term "restricted" as related to underground piping was not found in NRC guidance documents related to license renewal, during the conference call on October 11, 2012, the NRC Staff indicated that it was intended that piping located in vaults for which access requires more than simply opening a locked access cover should be classified as underground piping.As a result of this change in understanding of the definition of underground piping, Indian Point has identified portions of the service water, city water and fuel oil systems that are located in vaults that require more than unlocking a hatch or cover for access. This piping will now be considered underground piping as defined in LR-ISG-2011-03.
Specifically, this includes NL-1 2-149 Page 2 of 2 portions of two 24" diameter Indian Point 3 service water inlet headers (approximate total length of 70 feet) that run over the discharge canal, portions of the Indian Point 2 and 3 fuel oil piping (1 1/", 3" and 4" in diameter) that supply and run between the fuel oil storage tanks and from the storage tanks to each of the emergency diesel generator (EDG) rooms (approximate total length of 160 feet) and a portion of the %" diameter Indian Point 3 city water piping (approximate total length of 40 feet) that runs in the EDG pipe trench.The above piping will be periodically inspected under the Buried Piping and Tanks Inspection Program at a frequency that meets or exceeds NUREG-1801 Section XI.M41 guidance for underground piping which will ensure the effects of aging are adequately managed. Attachment 1 identifies changes to the service water, city water and fuel oil systems aging management review tables that result from the clarification identified in this letter.If you have any questions, or require additional information, please contact Mr. Robert Walpole at 914-254-6710.
I declare under penalty of perjury that the foregoing is true and correct. Executed on lot 1;- rz-~Sincer FRD/rw
Attachment:
- 1. Changes to the Indian Point LRA Service Water, City Water, and Fuel Oil Systems Aging Management Review Tables cc: Mr. William Dean, Regional Administrator, NRC Region I Mr. Sherwin E. Turk, NRC Office of General Counsel, Special Counsel Mr. Dave Wrona, NRC Branch Chief, Engineering Review Branch I Mr. John Daily, NRC Sr. Project Manager, Division of License Renewal Mr. Douglas Pickett, NRR Senior Project Manager Ms. Bridget Frymire, New York State Department of Public Service NRC Resident Inspector's Office Mr. Francis J. Murray, Jr., President and CEO NYSERDA ATTACHMENT I TO NL-12-149 CHANGES TO THE INDIAN POINT LRA SERVICE WATER.CITY WATER. AND FUEL OIL SYSTEMS AGING MANAGEMENT REVIEW TABLES ENTERGY NUCLEAR OPERATIONS, INC.INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 & 3 DOCKET NOS. 50-247 AND 50-286 Attachment 1 NL-12-149 Page 1 of 2 The following identifies changes to the service water system and fuel oil system aging management review tables as a result of the clarification identified in this letter.Changes are shown with underlines for additions.
Table 3.3.2-2-1P3:
Service Water System AgngEfetNUREG-Tal Component Intended Aging Management 1801 Table I Type Function Material Environment Requiring Programs 1801 Vol.2 Item Notes Management Item Pipinq Pressure Carbon steel Condensation Loss of material Buried Pipinq and VI1.1-11 3.3.1-58 E boundary (ext) Tanks Inspection Table 3.3.2-13-1P2:
Fuel Oil Systems Aging ffectNUREG-Component Intended Aging Management 1801 Table I Type Inten Material Environment Requiring 1801 Vol. 2 Notes Type Function Management Programs Item Item Ppi Pressure Carbon steel Air- outdoor Loss of material Buried Piping and VII.H1-8 3.3.1-60 E boundary (ext) Tanks Inspection (A-24)Table 3.3.2-13-1P3:
Fuel Oil Systems Component Intended Aging Effect ANUREG- Table I TypAMaterial Environment Requiring Aging Management 1801 Vol. 2 Notes Type Function Management Programs Item Item a!piM Pressure Carbon steel Air- outdoor Loss of material Buried Piping and VII.H1-8 3.3.1-60 E boundary (ext) Tanks Inspection (A-24)
Attachment 1 NL-12-149 Page 2 of 2 Table 3.3.2-17-1P3:
City Water Component Intended Aging Effect Aging Management NUREG- Table I Type Inten Material Environment Requiring Programs Vol 2 Item Notes Type Function Management Item"in Pressure Cogper Alloy Air- outdoor (ext) Loss of material Buried Piping and -- -- G boundary Tanks Inspection