Confirmation of Requested Initial Operator License Examinations for Turkey Point Nuclear Plant
ML12307A287
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 11/01/2012
From: Reis T
Division of Reactor Safety II
To: Nazar M
Florida Power & Light Co
References
Download: ML12307A287 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 November 1, 2012 Mr. Mano Nazar Executive Vice President and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, FL 33408-0420

SUBJECT:

CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS FOR TURKEY POINT NUCLEAR PLANT

Dear Mr. Nazar:

In a letter dated August 10, 2012, your staff responded to Regulatory Issue Summary 2012-07 and requested we schedule initial license operator examinations for the Turkey Point Nuclear Plant. Based on your letter and following discussions with your staff, we have scheduled the requested examinations as follows:

2013 2014 Plant / Station Date Applicants Date Applicants Turkey Point 3/4 15 * *

  • Could not support requested date. Scheduled for Jan 2015.

On-site validation of the examinations is typically scheduled to occur approximately three weeks before each examination. If you have a need to change the dates of your scheduled exam(s) from that (those) listed above, please inform us in writing of your request and the reason for the change. Due to the large number of examinations scheduled to be administered at Region II sites, requests to change examination dates will be considered on a case-by-case basis. We will confirm any change in examination schedule with a follow-up letter.

We understand that your staff will develop the proposed examinations. For examinations that have greater than nine applicants, each examination is scheduled for a minimum of two weeks.

If the number of applicants is reduced to less than ten (10) for any examination, please inform us as this will impact the examination schedule.

A supplementary letter will be sent to each stations training department director approximately 120 days prior to the initial examination. The letter will provide the director with the chief examiner=s name, an outline of examination security expectations, a list of the materials required by the NRC to conduct the examination, and it will reconfirm the examination dates. If you have any questions concerning this information, please contact Mr. Malcolm Widmann, Chief, Operations Branch I, at 404-997-4550 or Mr. Mark Franke, Chief, Operations Branch II at 404-997-4436.

M. Nazar 2 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC=s public Web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely,

/RA/

Terrence Reis, Director Division of Reactor Safety Docket Nos.: 50-250, 50-251 License Nos.: DPR-31, DPR-41 cc: (See page 3)

_________________________ G SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRS RII:DRS SIGNATURE RA RA RA RA NAME SCHAAF WIDMANN FRANKE CHRISTENSEN DATE 10/25/2012 11/1/2012 `11/1/2012 11/1/2012 11/ /2012 11/ /2012 11/ /2012 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO M. Nazar 3 cc: Mitch S. Ross Alison Brown Vice President and General Counsel Nuclear Licensing Nuclear Florida Power & Light Company Florida Power & Light Company Electronic Mail Distribution Electronic Mail Distribution Larry Nicholson Cynthia Becker Director (Acting) Chief Licensing Florida Bureau of Radiation Control Florida Power & Light Company Department of Health Electronic Mail Distribution Electronic Mail Distribution Michael Kiley Senior Resident Inspector Site Vice President Turkey Point Nuclear Generating Station Turkey Point Nuclear Plant U.S. Nuclear Regulatory Commission Florida Power and Light Company 9762 SW 344th St.

Electronic Mail Distribution Florida City, FL 33035 Niel Batista Attorney General Emergency Management Coordinator Department of Legal Affairs Department of Emergency Management The Capitol PL-01 and Homeland Security Tallahassee, FL 32399-1050 Electronic Mail Distribution County Manager of Miami-Dade County Paul Freeman 111 NW 1st Street, 29th Floor Vice President Miami, FL 33128 Organizational Effectiveness Florida Power & Light Company George Gretsas Electronic Mail Distribution City Manager City of Homestead Peter Wells Electronic Mail Distribution Vice President Outage Support CFAM Florida Power and Light Company Florida Power & Light Company ATTN: Mr. Brian Stamp Electronic Mail Distribution Training Manager Turkey Point Nuclear Plant Robert J. Tomonto 9760 SW 344th Street Licensing Manager Homestead, FL 33035 Turkey Point Nuclear Plant Florida Power & Light Company Electronic Mail Distribution Eric McCartney Plant General Manager Turkey Point Nuclear Plant Florida Power and Light Company Electronic Mail Distribution

Letter to Mano Nazar from Terrence Reis dated November 1, 2012

SUBJECT:

CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS FOR TURKEY POINT NUCLEAR PLANT Distribution:

ORA, RII T. Reis H. Christensen M. Widmann M. Franke K. Schaaf J. Vincent J. Kirby D. Rich J. McHale RIDSNRRDIRSIRIB Resource Document Control Desk - Licensing RIDSNRRDIRS PUBLIC RidsNrrPMTurkeyPoint Resource