Development of Evacuation Time Estimates, Revision 2, Final Report, Appendix K, Evacuation Roadway Network Through Figure K-50, Grid 49
ML12307A091
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 04/30/2012
From:
KLD Engineering, PC
To:
Office of Nuclear Reactor Regulation, South Carolina Electric & Gas Co
References
Download: ML12307A091 (52)


Text

APPENDIX K Evacuation Roadway Network

K. EVACUATION ROADWAY NETWORK As discussed in Section 1.3, a link-node analysis network was constructed to model the roadway network within the study area. Figure K-1 provides an overview of the link-node analysis network. The figure has been divided up into 49 more detailed figures (Figure K-2 through Figure K-50) which show each of the links and nodes in the network.

The analysis network was calibrated using the observations made during the field survey conducted in May 2011. Table K-1 lists the characteristics of each roadway section modeled in the ETE analysis. Each link is identified by its road name and the upstream and downstream node numbers. The geographic location of each link can be observed by referencing the map (Figure K-2 through Figure K-50) corresponding to the grid number provided in Table K-1. The roadway identified in Table K-1 is based on the following criteria:

Freeway: limited access highway, 2 or more lanes in each direction, high free flow speeds Freeway ramp: ramp on to or off of a limited access highway Major arterial: 3 or more lanes in each direction Minor arterial: 2 or more lanes in each direction Collector: single lane in each direction Local roadways: single lane in each direction, local roads with low free flow speeds The term, "No. of Lanes" in Table K-1 identifies the number of lanes that extend throughout the length of the link.

Many links have additional lanes on the immediate approach to an intersection (turn pockets); these have been recorded and entered into the input stream for the DYNEV II System.

As discussed in Section 1.3, lane width and shoulder width were not physically measured during the road survey. Rather, estimates of these measures were based on visual observations and recorded images.

Table K-2 identifies each node in the network that is controlled and the type of control (stop sign, yield sign, pre-timed signal, actuated signal, traffic control point) at that node.

Uncontrolled nodes are not included in Table K-2. The geographic location of each node can be observed by referencing the map (Figure K-2 through Figure K-50) corresponding to the grip number provided in Table K-2.

Virgil C. Summer Nuclear Station K-1 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 2

Appendix K Overview ~

I A/

k',z2 z

0-3 6/

ý

/8/ i I'0 11 Af I2

,/~4 F-2_

18 l's /

~

7 ef2 7'4, J4 N

B

%111 AýA i./5 l

22 11 1 -Y 9

t 21 k/

'4,2 ljý- 2 A

ýL2 -4 31 3'/7 38 71/

17-m E-1 2%:9 1

'--3-0 3'2 3~5' i7/

4~///

/

Legend VCSNS jo-- Unk G2PAZ Index Grid 2,5, 10, 15 Mile Rings Shadow Region 39, 4'

f41~

4/3 456

'4 8-$479 OS 1W14I~11 Cqw~ ESes -

OS a-x"I-5 10iles I 1"Ar'l Figure K-1. Overview of Link Node Analysis Virgil C. Summer Nuclear Station Evacuation Time Estimate K-2 KLD Engineering, P.C.

Rev. 2

Figure K-2. Grid 1 Virgil C. Summer Nuclear Station Evacuation Time Estimate K-3 KLD Engineering, P.C.

Rev. 2

Figure K-3. Grid 2 Virgil C. Summer Nuclear Station Evacuation Time Estimate K-4 KLD Engineering, P.C.

Rev. 2

Figure K-4. Grid 3 Virgil C. Summer Nuclear Station Evacuation Time Estimate K-5 KLD Engineering, P.C.

Rev. 2

Figure K-5. Grid 4 Virgil C. Summer Nuclear Station Evacuation Time Estimate K-6 KLD Engineering, P.C.

Rev. 2

Figure K-6. Grid 5 Virgil C. Summer Nuclear Station Evacuation Time Estimate K-7 KLD Engineering, P.C.

Rev. 2

Figure K-7. Grid 6 Virgil C. Summer Nuclear Station Evacuation Time Estimate K-8 KLD Engineering, P.C.

Rev. 2

Figure K-8. Grid 7 Virgil C. Summer Nuclear Station Evacuation Time Estimate K-9 KLD Engineering, P.C.

Rev. 2

I Figure K-9. Grid 8 Virgil C. Summer Nuclear Station Evacuation Time Estimate K-10 KLD Engineering, P.C.

Rev. 2

Figure K-iO. Grid 9 Virgil C. Summer Nuclear Station Evacuation Time Estimate K-11 KLD Engineering, P.C.

Rev. 2

Figure K-11. Grid 10 Virgil C. Summer Nuclear Station Evacuation Time Estimate K-12 KLD Engineering, P.C.

Rev. 2

Figure K-12. Grid 11 Virgil C. Summer Nuclear Station Evacuation Time Estimate K-13 KLD Engineering, P.C.

Rev. 2

Figure K-13. Grid 12 Virgil C. Summer Nuclear Station Evacuation Time Estimate K-14 KLD Engineering, P.C.

Rev. 2

Figure K-14. Grid 13 Virgil C. Summer Nuclear Station Evacuation Time Estimate K-15 KLD Engineering, P.C.

Rev. 2

Figure K-15. Grid 14 Virgil C. Summer Nuclear Station Evacuation Time Estimate K-16 KLD Engineering, P.C.

Rev. 2

Figure K-16. Grid 15 Virgil C. Summer Nuclear Station Evacuation Time Estimate K-17 KLD Engineering, P.C.

Rev. 2

(irE d 1*3 5 465,11 V

I "5'5'5.-

8141 StHgAsy 136\\

4137 464

\\

I 1

140.

138 ~

9 "4'62 Hgh St j-~

5 r

"0

&Ig Rd 547 46 451 -)V

~~

54,5 Al82 745 549 553

~

455 554 897nbor 553

~

(in 5522

454, 53

~89 q;45/

Legend I

.p 7

Virgil C. Summer Nuclear Station 7VCSNS7 Link-Node Analysis Network Figures Node Shadow Region

1. -_)Llnk 2,5, 10, 15 Mile Rings Grid 16 Index Grid gp Water k 4 Figure K-17. Grid 16 Virgil C. Summer Nuclear Station K-18 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 2

Figure K-18. Grid 17 Virgil C. Summer Nuclear Station Evacuation Time Estimate K-19 KLD Engineering, P.C.

Rev. 2

Figure K-19. Grid 18 Virgil C. Summer Nuclear Station Evacuation Time Estimate K-20 KLD Engineering, P.C.

Rev. 2

Figure K-20. Grid 19 Virgil C. Summer Nuclear Station Evacuation Time Estimate K-21 KLD Engineering, P.C.

Rev. 2

Figure K-21. Grid 20 Virgil C. Summer Nuclear Station Evacuation Time Estimate K-22 KLD Engineering, P.C.

Rev. 2

Figure K-22. Grid 21 Virgil C. Summer Nuclear Station Evacuation Time Estimate K-23 KLD Engineering, P.C.

Rev. 2

Figure K-23. Grid 22 Virgil C. Summer Nuclear Station Evacuation Time Estimate K-24 KLD Engineering, P.C.

Rev. 2

Figure K-24. Grid 23 Virgil C. Summer Nuclear Station Evacuation Time Estimate K-25 KLD Engineering, P.C.

Rev. 2

Figure K-25. Grid 24 K-26 KLD Engineering, P.C.

Virgil C. Summer Nuclear Station Evacuation Time Estimate K-26 KLD Engineering, P.C.

Rev. 2

Figure K-26. Grid 25 Virgil C. Summer Nuclear Station Evacuation Time Estimate K-27 KLD Engineering, P.C.

Rev. 2

Figure K-27. Grid 26 Virgil C. Summer Nuclear Station Evacuation Time Estimate K-28 KLD Engineering, P.C.

Rev. 2

Figure K-28. Grid 27 Virgil C. Summer Nuclear Station Evacuation Time Estimate K-29 KLD Engineering, P.C.

Rev. 2

Figure K-29. Grid 28 Virgil C. Summer Nuclear Station Evacuation Time Estimate K-30 KLD Engineering, P.C.

Rev. 2

Figure K-30. Grid 29 Virgil C. Summer Nuclear Station Evacuation Time Estimate K-31 KLD Engineering, P.C.

Rev. 2

Figure K-31. Grid 30 Virgil C. Summer Nuclear Station Evacuation Time Estimate K-32 KLD Engineering, P.C.

Rev. 2

Figure K-32. Grid 31 Virgil C. Summer Nuclear Station Evacuation Time Estimate K-33 KLD Engineering, P.C.

Rev. 2

Figure K-33. Grid 32 Virgil C. Summer Nuclear Station Evacuation Time Estimate K-34 KLD Engineering, P.C.

Rev. 2

1.i 28'2 7

26 301 9

877-S55~298

  • %~

(Irid 2 7 372 E 283 24 28-3723 7ý 76 2o

't

\\arRd28 3

2410 2

02 7766 a

773 ~

~771 765 O

7866 766k 755~

a 7rd VA

ý I

82-3 6ý'

7 634 t>

0 4n 31 763 I

  • 33 A 7608 758'q Aý "9

7J 7

/1 7575W

~o/

755,

%kAdrray 4~

75 Legend Virgil C. Summer Nuclear Station Link-Node Analysis Network Figures

.VCSNS <9PAZ

  • Node Shadow Region
  • ->Unk 2,5, 10, 15 Mile Rings Grid 33 f7] Index Grid Water I

Figure K-34. Grid 33 Virgil C. Summer Nuclear Station KLD Engineering, P.C.

Virgil C. Summer Nuclear Station Evacuation Time Estimate K-35 KILD Engineering, P.C.

Rev. 2

21719 a

C Grid 2o G i4

'CoE-1 201 A.A 20450 g

2627 C

-t 2frl 2051~

2 3-

'~~Ro2k i

26 61 rid 3

(?or 4'

26 27 8 1 A

,~'>-

lO~les2

/ ~ ~

~

~

7 VB~dYR 1

1

\\

265~,

27ý 930d 27 Legen L~~7inkNd An2 yi Newr Figre

  • ~~

2CN "9'PA

  • ~~~~~

Noe SaowRgo

~-*Lnk 2,,

1,15 ile inp 01j inexGid Wae Figure K-35. Grid 34 Virgil C. Summer Nuclear Station K-36 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 2

{*r k 28 600 602 601 C-12 G...........

X 0

~30

(,r it 3,

c 0, -,-

&we Ch D-

-. 44

oil, l

0 0

7 209 T611 D-a 0

6-Or 620 4<

6 909 YjOMls 210 T,

62 82,,'W

!-g aaý

~~!k%~

'~

11

~

  • 382C

\\1 P I 36 24 1I

( I r 7C S,

L 6

226 22 2 4'ý

~

~

'7 Legend V.-pVirgil C. Summer Nuclear Station

  • VCSNS PAZ T

Link-Node Analysis Network Figures

  • .0 Node Shadow RegionGrd3 S-bu-Lnk 2,5,10,1 MiMle RingsGrd3 Inndex Grid Water 0

O.S

__j I

Md.

I Figure K-36. Grid 35 Virgil C. Summer Nuclear Station Evacuation Time Estimate K-37 KLD Engineering, P.C.

Rev. 2

Figure K-37. Grid 36 Virgil C. Summer Nuclear Station Evacuation Time Estimate K-38 KLD Engineering, P.C.

Rev. 2

Figure K-38. Grid 37 Virgil C. Summer Nuclear Station Evacuation Time Estimate K-39 KLD Engineering, P.C.

Rev. 2

Figure K-39. Grid 38 Virgil C. Summer Nuclear Station Evacuation Time Estimate K-40 KLD Engineering, P.C.

Rev. 2

Figure K-40. Grid 39 Virgil C. Summer Nuclear Station Evacuation Time Estimate K-41 KLD Engineering, P.C.

Rev. 2

Figure K-41. Grid 40 Virgil C. Summer Nuclear Station Evacuation Time Estimate K-42 KLD Engineering, P.C.

Rev. 2

Figure K-42. Grid 41 Virgil C. Summer Nuclear Station Evacuation Time Estimate K-43 KLD Engineering, P.C.

Rev. 2

Figure K-43. Grid 42 Virgil C. Summer Nuclear Station Evacuation Time Estimate K-44 KLD Engineering, P.C.

Rev. 2

Figure K-44. Grid 43 Virgil C. Summer Nuclear Station Evacuation Time Estimate K-45 KLD Engineering, P.C.

Rev. 2

Figure K-45. Grid 44 Virgil C. Summer Nuclear Station Evacuation Time Estimate K-46 KLD Engineering, P.C.

Rev. 2

Virgil L. !summer Nuclear btation Link-Node Analysis Network Figures

-,,Grid 45 0

02S O

-a I-I..

I Figure K-46. Grid 45 Virgil C. Summer Nuclear Station Evacuation Time Estimate K-47 KLD Engineering, P.C.

Rev. 2

Figure K-47. Grid 46 K-48 KID Engineering, P.C.

Virgil C. Summer Nuclear Station Evacuation Time Estimate K-48 KLD Engineering, P.C.

Rev. 2

Figure K-48. Grid 47 Virgil C. Summer Nuclear Station Evacuation Time Estimate K-49 KLD Engineering, P.C.

Rev. 2

Figure K-49. Grid 48 Virgil C. Summer Nuclear Station Evacuation Time Estimate K-S0 KLD Engineering, P.C.

Rev. 2

461 Grid 4 7 06"(0 Rd 4

V911~

t~~s iý'

Be 8,,

1 826 6

92 6

2o4?'

gig C01-15b4

(

/

9 i

!grosstba'Cl Q4 U-b,,1N Legend Virgil C. Summer Nuclear Station VCSNS PAZ Link-Node Analysis Network Figures Node Shadow Region S.--Link 2, 5, 10, 15 Mile Rings Grid 49

[-J Index Grid Water...

a Figure K-50. Grid 49 Virgil C. Summer Nuclear Station Evacuation Time Estimate

.. K-51 KLD Engineering, P.C.