D. Heacock Ltr Millstone Unit 1- Denial of Exemption from Certain Security Requirements of 10 CFR Part 73.55 (TAC No. J00392)
ML12305A476
Person / Time
Site: Millstone Dominion icon.png
Issue date: 01/16/2013
From: Camper L
NRC/FSME/DWMEP
To: Heacock D
Dominion Nuclear Connecticut
References
TAC J00392
Download: ML12305A476 (3)


Text

January 16, 2013 Mr. David A Heacock President and Chief Nuclear Officer Dominion Nuclear Connecticut, Inc.

Innsbrook Technical Center 5000 Dominio Boulevard Glen Allen, VA 23060-6711

SUBJECT:

MILLSTONE UNIT 1 - DENIAL OF EXEMPTION FROM CERTAIN SECURITY REQUIREMENTS OF 10 CFR PART 73.55 (TAC NO. J00392)

Dear Mr. Heacock:

Dominion Nuclear Connecticut, Inc. is the licensee for Millstone Power Station, Unit 1. By letter dated December 9, 2010, Dominion Nuclear requested an exemption from 10 CFR 73.55(e)(9)(v)(B). The U.S. Nuclear Regulatory Commission (NRC) staff reviewed the exemption request for the Millstone Power Station, Unit 1. Based upon their review, the Commission is denying the requested exemption. The basis for the denial is detailed in the enclosed Safety Evaluation, which has been designated as Safeguards Information and must be withheld from public disclosure in accordance with 10 CFR 73.21(a)(1) and 10 CFR 73.22(a)(1)(vii). You must be in full compliance with 10 CFR 73.55(e)(9)(v)(B) within 30 days of the date of this letter. Additionally, it is our understanding that you currently have implemented, consistent with the Millstone site procedures, compensatory measures for the protection of a vital area. The NRC expects that adequate compensatory measures for the protection of a vital area will remain in place during the 30 day period.

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC=s Agency-wide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely,

/RA/

Larry W. Camper, Director Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs Docket No.: 50-245

Enclosure:

Safety Evaluation (Safeguards Information) cc (without Safety Evaluation):

Millstone Power Station Unit 1 Service List

Mr. David A Heacock President and Chief Nuclear Officer Dominion Nuclear Connecticut, Inc.

Innsbrook Technical Center 5000 Dominio Boulevard Glen Allen, VA 23060-6711

SUBJECT:

MILLSTONE UNIT 1 - DENIAL OF EXEMPTION FROM CERTAIN SECURITY REQUIREMENTS OF 10 CFR PART 73.55 (TAC NO. J00392)

Dear Mr. Heacock:

Dominion Nuclear Connecticut, Inc. is the licensee for Millstone Power Station, Unit 1. By letter dated December 9, 2010, Dominion Nuclear requested an exemption from 10 CFR 73.55(e)(9)(v)(B). The U.S. Nuclear Regulatory Commission (NRC) staff reviewed the exemption request for the Millstone Power Station, Unit 1. Based upon their review, the Commission is denying the requested exemption. The basis for the denial is detailed in the enclosed Safety Evaluation, which has been designated as Safeguards Information and must be withheld from public disclosure in accordance with 10 CFR 73.21(a)(1) and 10 CFR 73.22(a)(1)(vii). You must be in full compliance with 10 CFR 73.55(e)(9)(v)(B) within 30 days of the date of this letter. Additionally, it is our understanding that you currently have implemented, consistent with the Millstone site procedures, compensatory measures for the protection of a vital area. The NRC expects that adequate compensatory measures for the protection of a vital area will remain in place during the 30 day period.

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC=s Agency-wide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely,

/RA/

Larry W. Camper, Director Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs Docket No.: 50-245

Enclosure:

Safety Evaluation (Safeguards Information) cc (without Safety Evaluation):

Millstone Power Station Unit 1 Service List Distribution (without Safety Evaluation):

DWMEP r/f M Ferdas, RI LKauffman, RI C Sanders, NRR J Riley, NSIR ML12305A476 OFFICE DWMEP/PM DWMEP/LA DWMEP/PM DWMEP/BC NAME JHickman CHolston SGiebel BWatson DATE 11 / 7 / 2012 11 / 7 / 2012 11 / 7 / 2012 11 / 7 / 2012 OFFICE NSIR OGC DWMEP DWMEP/D NAME SWastler EBowdenBerry APersinko LCamper DATE 11 / 19 / 2012 1 / 8 / 2013 1/15/2013 1/16/2013 OFFICIAL RECORD COPY

Millstone Power Station Unit 1 cc:

Mr. A. J. Jordan Site Vice President - Millstone Dominion Nuclear Connecticut, Inc.

Rope Ferry Road Waterford, CT 06385 Mr. P. J. Parulis Manager - Nuclear Oversight Dominion Nuclear Connecticut, Inc.

Rope Ferry Road Waterford, CT 06385 Mr. S. E. Scace Assistant to the Site Vice President Dominion Nuclear Connecticut, Inc.

Rope Ferry Road Waterford, CT 06385 Mr. Robert T. Griffin, Director Nuclear Safety and Licensing Dominion Nuclear Connecticut, Inc.

Rope Ferry Road Waterford, CT 06385 Mr. S. P. Sarver, Director Nuclear Station Operations & Maintenance Dominion Nuclear Connecticut, Inc.

Rope Ferry Road Waterford, CT 06385 Mr. Chris L. Funderburk Director, Nuclear Licensing and Operations Support Dominion Resources Services, Inc.

Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 Mr. William D. Bartron Licensing Supervisor Dominion Nuclear Connecticut, Inc.

Rope Ferry Road Waterford, Connecticut 06385 Lillian M. Cuoco, Esquire Senior Counsel Dominion Resources Services, Inc.

Rope Ferry Road Waterford, CT 06385 Edward L. Wilds, Jr., Ph.D.

Director, Division of Radiation Department of Environmental Protection 79 Elm Street Hartford, CT 06106-5127 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 First Selectmen Town of Waterford 15 Rope Ferry Road Waterford, CT 06385 Mr. Evan W. Woollacott, Co-Chair Nuclear Energy Advisory Council 128 Terry's Plain Road Simsbury, CT 06070 Nancy Burton, Esquire 147 Cross Highway Redding Ridge, CT 06876 Senior Resident Inspector Millstone Power Station c/o Nuclear Regulatory Commission P.O. Box 513 Niantic, CT 06357 Mr. David A. Christian President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 13060-6711