U.S. Nucear Regulatory Commission Surry Power Station SR2O1 2301 Administrative Job Performance Measure G2.1.25 Applicant_________________________________ Start Time____________________

Examiner________________________________

Date Stop Time___________________

Title PERFORM AN AT-POWER SHUTDOWN MARGIN CALCULATION KIA: G2.1 .25 Ability to Interpret Reference Materials, Such as Graphs, Curves, Tables, etc. (3.914.2)

Applicability Estimated Time Actual Time ROISRO 30 Minutes Conditions

  • Task may be PERFORMED in the simulator (or any area with access to a Station Curve Book).
  • Unit 2 is at 72% power with Rod M12 dropped and stuck at 123 steps in the core.

Standards

  • 2-OP-RX-001, Shutdown Margin (Calculated at Power) complete within 30 minutes.

Initiating Cues

  • Nuclear Shift Manager direction.

Terminating Cues

Procedures

  • 0-AP-1 .00, Rod Control System Malfunction, Revision 25
  • 2-DRP-003R, Curve Book, Revision 09 Tools and Equipment Safety Considerations
  • None
  • None G2.1.25 SR2012301 1 of 9

Initial Conditions

  • During normal steady state operation on Unit 2, Control Bank C Rod M12 dropped and stuck at a height of 123 steps. 0-AP-1 .00, Rod Control System Malfunction, is in progress on Unit 2. Unit 2 has been ramped to 72%

power lAW 0-AP-23.00, Rapid Load Reduction.

  • The following unit conditions exist:

Core Burnup: 14,500 MWD/MTU CB: 352 ppm, measured 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> ago. No dilutions have taken place.

D-Bank rod height at 72% 192 Steps Initiating Cues

  • I am the Nuclear Shift Manager and you are the Unit 1 BOP. You are to perform 2-OP-RX-001, Shutdown Margin (Calculated At Power).

Notes

  • Ensure use of current (Cycle 24) 2-DRP-003R (Curve Book) values.

G2.1.25 SR2012301 2of9

PERFORMANCE CHECKLIST Notes to the Evaluator

  • Task critical elements are bolded.
  • START TIME:

STEP 1:

SAT Reviews Administrative Section of Procedure:

UNSAT STANDARD:

a) Reviews and initials Section 1.0, Purpose.

b) Reviews Section 2.0, References.

c) Reviews and initials Section 3.0, Initial Conditions.

d) Reviews and initials Section 4.0, Precautions and Limitations.

EVALUATORS NOTE:

Candidate may complete Signature Table, Step 3.4, at this time. Table should be completed prior to informing Shift Manager (Evaluator) that task is complete.

COMMENTS:

STEP 2:

SAT Completes Step 5.1.1. (Step 5.1.1)

UNSAT STANDARD:

a) Reviews NOTE prior to Step 5.1.1: NOTE: Meeting the conditions in Step 5.1.1 verifies that the SDM is at least -1770 pcm. A stuck I dropped rod (10 or more steps from the bottom) requires a full SDM.

b) Check ALL of the following to determine if an abbreviated SDM can be performed:

1) Places check (/) in blank: The Unit is operating between HZP and HFP.
2) No check (V) in blank: A single fully dropped (less than 10 steps) control rod exists.
3) Places a check (V) in blank: All other rods are greater than the minimum rod insertion limit.

COMMENTS:

G2.1.25 SR2012301 3of9

STEP 3:

Completes Steps 5.1.2 and 5.1.3. (Step 5.1.2/5.1.3)

UNSAT STANDARD:

a) Initials Step 5.1.2: IF any of the above conditions are NOT met, THEN enter N/A for Step 5.1.3, AND GO TO Step 5.1.4. Otherwise, enter N/A.

b) Places N/A and initials blank for Step 5.1 .3.a. Draws a single line below blank for Step 5.1 .3.c. Draws arrow down from Step 5.1 .3.a blank to line below Step 5.1 .3.c.

EVALUATORS NOTE:

Completed Step 5.1.3 appears as follows:

5.1.3 IF all of the above conditions are met, THEN perform the following:

O N/A a. Enter N/A for Steps 5.1.4 through 5.1.9.

b. Record -1770 pcm in Step 5.1.10.

I c. GO TO Step 5.1.11.

COMMENTS:

STEP 4:

SAT Completes Step 5.1.4 using the information provided on the Candidate Directions Page. (Step 5.1.4) UNSAT STANDARD:

a) Initials Step 5.1.4.a., and enters Time/date in blanks of Step 5.1 .4.a.

b) Initials Step 5.1.4.b, and enters 14,500 on Step 5.1.4.b blank.

c) Initials Step 5.1.4.c, and enters 192 in Step 5.1.4.c blank.

d) Initials Step 5.1 .4.d, and enters 352 in Step 5.1 .4.d blank.

e) Initials Step 5.1 .4.e, and enters 72 in Step 5.1 .4.e blank.

EVALUATORS NOTE:

If asked: Use current date and time for item a) above.

If asked: Use 72% for power level.

COMMENTS:

STEP 5:

SAT Completes Step 5.1.5. (Step 5.1.5)

UNSAT STANDARD:

a) Places N/A and initials blank for Step 5.1.5.

b) Enter0 pcm in Step 5.1.8.a (Page 8, 2-OP-RX-OO1)

COMMENTS:

G2.1.25 SR2012301 4of9

STEP 6:

SAT Completes Step 5.1.6. (Step 5.1.6)

UNSAT STANDARD:

a) Uses Step 2.3.1 .e to determine curve reference Stuck Rod Worth vs Burnup.

b) Refers to 2-DRP-003R, Attachment 40, Page 81 (Surry Unit 2 Cycle 24 Stuck Rod Worth VS Burnup).

c) Refers to NOTE: For Use In Shutdown Margin Calculations Only.

d) Finds 14,500 MWD/MTU line along X axis of graph and traces upward to intersect with line.

e) Traces horizontally to Y axis of graph to determine intersection point.

f) Noting Y axis label (25 pcm/div), determines that stuck rod worth 2220 pcm (range 2207.5 to 2225 based on +/- 12.5 band or 1/2 of a division for low, 2225 line for high).

g) Enters this value in blank above Ref 2.3.1 .e.

h) Using Step 5.1.6 guidance, enters 2 in Actual No. of Stuck Rods Plus One blank.

i) Performs multiplication, and enters 4440 in blank next to pcm (range 4415 to 4450 based on +/- 12.5 band or 1/2 of a division for low, 2225 line for high.)

j) Enters value above in blank for Step 5.1 .8.b.

k) Initials Blank for Step 5.1.6.

EVALUATORS NOTE:

If asked: Candidate should use provided reference copy of 2-DRP-003R.

COMMENTS:

STEP 7:

Completes Step 5.1.7. (Step 5.1.7)

UNSAT STANDARD:

a) Enters 0 in blank next to pcm.

b) Enters 0 in blank, Step 5.1.8.c.

c) Initials blank for Step 5.1.7.

EVALUATORS NOTE:

If asked: Control Rod M12 is the only Affected Rod, all others at the specified height or are fully withdrawn.

COMMENTS:

G2.1.25 SR2012301 5of9

STEP 8:

SAT Initials Steps 5.1.8.a. through 5.1.8.c.(Step 5.1.8)

UNSAT STANDARD:

a) Checks blank filled in on Step 5.1 .8.a (performed JPM Step 5), and Initials blank for Step 5.1.8.a.

b) Checks blank filled in on Step 5.1 .8.b (performed JPM Step 6), and Initials blank for Step 5.1 .8.b.

c) Checks blank filled in on Step 5.1 .8.c (performed JPM Step 7), and Initials blank for Step 5.1.8.c.

COMMENTS:

STEP 9:

SAT Completes Step 5.1.8.d. (Step 5.1.8.d)

UNSAT STANDARD:

a) Uses Step 2.3.1 a to determine curve reference Power Defect.

b) Refers to 2-DRP-003R, Attachment 31, Page 71 (Surry Unit 2 Cycle 24 Power Defect).

c) Refers to NOTE: For Use Through Nominal Full Power End Of Reactivity.

d) Finds 14,500 MWD/MTU line along X axis of graph and traces upward to intersect with line with the 50% and 75% lines.

e) Traces horizontally to the Y axis and notes the intersection points.

f) Notes the Y axis label (-50 pcm/div) determine Power defect at 75% = 1600 pcm; Power Defect at 50% = 1040 pcm.

g) Interpolates Power defect values to determine Power Defect at 72% = 1533 pcm (range 1508 to 1558 pcm based on +/- 25 band or 1/2 of a division.)

h) Enters this value in blank for Step 5.1 .8.d. and Initials Step 5.1 .8.d.

EVALUATORS NOTE:

If asked: Candidate should use provided reference copy of 2-DRP-003R.

COMMENTS:

G2.1.25 SR2012301 6of9

STEP 10:

SAT Completes Step 5.1 .8.e. (Step 5. 1.8.e)

UNSAT STANDARD:

a) Uses Step 2.3.1 b to determine curve reference Reactivity Redistribution Factor.

b) Refers to 2-DRP-003R, Attachment 42, Page 83 (Surry Unit 2 Cycle 24 Reactivity Redistribution Factor VS Burnup).

c) Refers to NOTE: For Use In Shutdown Margin Calculations Only.

d) Finds 14,500 MWD/MTU line along X axis of graph and traces upward to intersect curve.

e) Traces horizontally to the Y axis and notes the intersection point.

f) Notes the Y axis label (10 pcmldiv) determine RRF at 188 pcm (range 183 to 190 based on +/- 5 band or 1/2 of a division for low, 190 line for high.)

g) Enters this value in blank for Step 5.1 .8.e. and Initials Step 5.1 .8.e.

EVALUATORS NOTE:

If asked: Candidate should use provided reference copy of 2-DRP-003R.

COMMENTS:

STEP 11:

Completes Step 5.1.8.f. (Step 5.1.8.f)

U N SAT STANDARD:

a) Uses Step 2.3.lc to determine curve reference At Power Integral Worth Table Control Banks C & D in Overlap.

b) Refers to 2-DRP-003R, Attachment 29, Page 62 (Surry Unit 2 Cycle 24 At-Power Integral Rod Worth Table for Control Banks C and D in overlap).

c) Refers to NOTE: Worth At Nominal HFP Conditions.

d) Finds 14000.1 TO 16000.0 MWD/MTU column and traces down to intersect with 193/1 91 Rows D-Bank Pos Steps.

e) Interpolates to determine Worth at 192 Steps = 223.2 pcm. (223 pcm acceptable).

Bank D worth at 193 steps = 214.9 pcm, worth at 191 steps = 231.5 pcm. (231.5 214.9) ÷ 2 = 8.3 pcm. 8.3 pcm + 214.9 pcm 223.2 pcm.

f) Enters this value in blank for Step 5.1 .8.f. and Initials Step 5.1 .8.f.

EVALUATORS NOTE:

If asked: Candidate should use provided reference copy of 2-DRP-003R.

COMMENTS:

G2.1.25 SR2012301 7of9

STEP 12:

Completes Step 5.1.8.g and 5.1.8.h. (Step 5.1.8.g/5.1.8.h)

UNSAT STANDARD:

a) Uses Step 2.3.ld to determine curve referenceTotal Rod Worth.

b) Refers to 2-DRP-003R, Attachment 38, Page 79 (Surry Unit 2 Cycle 24 Total Rod Worth vs Burn up).

c) Refers to NOTE: For Use In Shutdown Margin Calculations Only.

d) Finds 14, 500 MWD/MTU along the X axis and traces upward to intersect with the curve.

e) Traces horizontally to the Y axis and notes the intersection point.

e) Notes the Y axis label (25 pcm/div) to determine Total Rod Worth = 7788 pcm (range 7775.5 to 7800 based on +/- 12.5 band or 1/2 of a division for low, 7800 line for high.)

f) Enters this value in blank for Step 5.1 .8.g. and Initials Step 5.1 .8.g.

g) Reads and initials blank for Step 5.1 .8.h.

EVALUATORS NOTE:

If asked: Candidate should use provided reference copy of 2-DRP-003R.

COMMENTS:

STEP 12:

Completes Step 5.1.9 and 5.1.10. (Step 5.1.9/5.1.10)

U N SAT STANDARD:

a) Calculates the Shutdown Margin by adding the values in Substeps 5.1.8.a through Substep 5.1.8.h.

b) Enters Value of -1254 pcm in blank in Step 5.1.10 (range -1195 to -1554 pcm based on sum of high and low range values through Step 5.1.8.

COMMENTS:

STEP 13:

SAT Completes Step 5.1.11 and 5.1.12. (Step 5.1.11 /5.1.12)

UNSAT STANDARD:

a) Informs Nuclear Shift Manager (Evaluator) that the Shutdown Margin independent review required.

b) Informs Nuclear Shift Manager (Evaluator) that the calculated Shutdown Margin is less than Section 4.0 requirements (-1770 pcm), power must be reduced lAW TS 3.12, and the minimum Shutdown Margin must be met.

COMMENTS:

G2.1.25 SR2012301 8of9

STEP 14:

SAT Report to Shift Manager (Evaluator) completion of Task.

UNSAT COMMENTS:

JPM COMPLETE STOP TIME:

Comments:

G2.1.25 SR2012301 9 of 9

INSTRUCTIONS TO APPLICANT (EXAMINER COPY)

Initial Conditions

  • During normal steady state operation on Unit 2, Control Bank C Rod M12 dropped and stuck at a height of 123 steps. 0-AP-1 .00, Rod Control System Malfunction, is in progress on Unit 2.
  • Unit 2 has been ramped to 72% power lAW 0-AP-23.00.
  • The following unit conditions exist:

Core Burnup: 14,500 MWD/MTU CB: 352 ppm, measured 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> ago. No dilutions have taken place.

D-Bank rod height at 72% 192 Steps Initiating Cues

  • I am the Nuclear Shift Manager and you are the Unit I BOP. You are to perform 2-OP-RX-001, Shutdown Margin (Calculated At Power).

INSTRUCTIONS TO APPLICANT (CANDIDATE COPY)

Initial Conditions

  • During normal steady state operation on Unit 2, Control Bank C Rod M12 dropped and stuck at a height of 123 steps. 0-AP-1 .00, Rod Control System Malfunction, is in progress on Unit 2.
  • Unit 2 has been ramped to 72% power lAW O-AP-23.00, Rapid Load Reduction.
  • The following unit conditions exist:

Core Burnup: 14,500 MWD/MTU CB : 352 ppm, measured 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> ago. No dilutions have taken place.

D-Bank rod height at 72% 192 Steps Initiating Cues

  • I am the Nuclear Shift Manager and you are the Unit 1 BOP. You are to perform 2-OP-RX-001, Shutdown Margin (Calculated At Power).

Surry 2012-301 Dilute a WGDT U.S. Nuclear Regulatory Commission Power Station Administrative Job Performance Measure GEN2.1.7 (4.4/4.7)

F I NAL Applicant_________________________________ Start Time____________________

Examiner_______________________________

Date Stop Time___________________

Title DETERMINE REQUIRED NITROGEN DILUTION FOR OUT OF SPEC WASTE GAS DECAY TANK KIA: G2.1 .7 Ability to evaluate plant performance and make operational judgments based on operating characteristics, reactor behavior, and instrument interpretation. (4.414.7)

Applicability Estimated Time Actual Time ALL 20 Minutes Conditions

  • Task is to be PERFORMED in the classroom.
  • Annunciator 0-WD-D9, Waste Gas Decay Tanks HI 02 has alarmed with an indicated oxygen concentration of 4.2%.

Standards

  • Applicant lists closure of 1-BR-79 to suspend all additions to I B WGDT as required
  • Applicant recognizes that lB WGDT must be reduced to less than or equal to 2% per OP-23.2.4 and associated required valve manipulations to achieve dilution.
  • Applicant correctly calculates 1 B WGDT pressure for 02 dilution, per OP-23.2.4, within +1, -0 psig.
  • SRO Applicant correctly lists TS 3.11 A requirements.

Initiating Cues

  • I am the Shift Manager and you are a licensed operator assigned to the control room. Alarm WD-D9 (WASTE GAS DECAY TANKS HI 02) has just been received.
  • Both units are stable at 100%.
  • No maintenance or testing activities are in progress.
  • The indication on the oxygen analyzer has been trending up slowly with NO spiking or other abnormalities noted (both Local and MCR indications are NORMAL with NO indications of analyzer failure present)
  • You are to perform the actions of WD-D9 and list the following:

o All required actions to correct the given condition o SRO All required actions to correct the given condition and applicable Tech Spec LCOs and applicable time requirements (if any)

  • Due to activity level in the B WGDT, release is not desired at this time.

071A4.29 SR06301 1 of 16

Surry 2012-301 Dilute a WGDT Terminating Cues

  • Final WGDT pressure after dilution determined using Attachment 2 of OP-23.2.4, Release of Waste Gas Decay Tank lB.

Procedures

  • 0-WD-D9, Waste Gas Decay Tank HI 02.
  • OP-23.2.4, Release of Waste Gas Decay Tank 1 B.
  • Surry Technical Specifications.

Tools and Equipment Safety Considerations

  • None
  • None Simulator Setup for Screen Captures
  • Call up IC-I and initialize.
  • Meter override lB Waste Gas Decay Tank pressure to 30 psig (0.136), and override GW-AIT-150A, pen #

(green) to an indicated concentration of 4.2% (0.42).

  • Verify in service I isolated tanks swapped (Isolated magnet on WGDT A).

Notes 071A4.29 SR06301 2of 16

Surry 2012-301 Dilute a WGDT PERFORMANCE CHECKLIST Notes to the Evaluator

  • Task critical elements are bolded and noted at the end of the step as CRITICAL STEP.
  • START TIME:

STEP 1: (WD-D9)

SAT STEP 1- Step 1. CHECK I&C TESTING - IN PROGRESS

  • I -GW-AIT-1 50A UNSAT OR
  • 1-GW-AIT-150B STANDARD:

Recognizes from initial cue that no maintenance or testing activities are in progress and GOES TO STEP 6.

EVALUATORS NOTE: NIA COMMENTS:

STEP 2: (WD-D9)

SAT STEP 2 - Notes prior to step 6:

  • Recorder Trace spiking is indicative of a clogged or worn sensing device. UNSAT
  • Red pen indicates for Analyzer A. Green pen indicates for Analyzer B.

Step 6- CHECK RECORDER FOR IN-SERVICE TANK ANALYZER FAILED -

  • Recorder Trace SPIKING OR
  • Local Power Light OFF-OR
  • Local oxygen concentration NOT INDICATED STANDARD:
  • Recognizes from initial cue that no indications exist that analyzer has failed and goes to RNO column.

EVALUATORS NOTE:

If asked: No spiking has been noted.

If asked: Local power is Lit.

If asked: Local Oxygen concentration is indicated.

COMMENTS:

071A4.29 SR06301 3of16

Surry 2012-301 DiluteaWGDT STEP 3: (WD-D9)

STEP 3 - Step 6 RNO Actions: IF oxygen concentration is greater than 4%, THEN do the following: UNSAT a) Immediately suspend all additions of waste gases to the affected tank by closing 1-BR-79 and reduce oxygen concentration to less than or equal to 4%.

b) GO TO Step 13.

STANDARD:

  • Identifies oxygen concentration is greater than 4% and lists the closure of 1-BR-79 as a required action and goes to step 13. IDENTIFIES AND DIRECTS CLOSURE OF 1-BR-79.

EVALUATORS NOTE: NIA COMMENTS:

STEP 4: (WD-D9)

SAT STEP4- Note priorto step 13:

  • The maximum pressure allowed in the WGDT is 115 psig. (Actual Pressure UNSAT 30 psig See Handout)

Step 13- REDUCE OXYGEN TO LESS THAN OR EQUAL TO 2.0% WITHIN 48 HOURS ON OUT-OF-SPEC TANK lAW APPROPRIATE OPERATING PROCEDURE:

  • OP-23.2.3, RELEASE OF WASTE GAS DECAY TANK 1A OR
  • OP-23.2.4, RELEASE OF WASTE GAS DECAY TANK 1 B STANDARD:
  • Trainee requests copy of OP-23.2.4 to reduce Oxygen concentration.

EVALUATORS NOTE: OP-23.2.4 actions begin on next Step (Step 5) of the JPM.

Remaining ARP actions for WD-D9 are on Page 8 of 16.

COMMENTS:

071A4.29 SR06301 4of16

Surry 20 12-301 Dilute a WGDT STEP 5: (OP-23.2.4)

SAT STANDARD:

UNSAT Candidate Reviews Initial Conditions and Precautions and Limitations of OP-23.2.4.

3.0 INITIAL CONDITIONS 3.1 Check that the Waste Gas Decay Tank has been on Holdup for as long as possible. (Holdup is not required for purging the tank after maintenance.) (Ref. 2.4.1) 3.2 Neither unit PRT is aligned to the Process Vent System.

4.0 PRECAUTIONS AND LIMITATIONS 4.1 To ensure the maximum Holdup time for the Waste Gas Decay Tank, an evaluation of existing plant conditions must be made before release.

(Ref. 2.4.1) 4.2 When the Waste Gas Decay Tank H2 concentration is greater than 4 percent by volume, the 02 concentration must not be greater than 2 percent by volume. (Ref. 2.4.2) 4.3 The minimum operable channels for the Surry Radioactive Gaseous Effluent Monitoring Instrumentation for the Process Vent System are listed in VPAP-2103S.

4.4 If the MGPI Process Vent skid is inoperable, Health Physics must adjust Process Vent Accountability Sampler Flow to between 1.0 to 3.0 cfm.

4.5 With both WGDT Gas Analyzer A and Analyzer B out of service, a WGDT in service, and 1-BR-79, 1-BR-TK-6 to 1-GW-TK-2 Isol, open, grab samples shall be collected at least once each 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> during degassing operations to the WGDT and at least once each 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> during other operations. Samples shall be analyzed within four hours after collection. (Ref. 2.4.2) 4.6 The WGDT maximum pressure is 115 psig. (Ref. 2.4.2) 4.7 If the Operations Computer Calculation Program is used, the procedure revision number and the calculation revision number must be the same.

COMMENTS:

071A4.29 SR06301 5of16

Surry 2012-301 Dilute aWGDT STEP 6: (OP-23.2.4)

SAT STEP 6- Section 5.1 Waste Gas Decay Tank 1 B Sampling and/or Dilution UNSAT Note: A Chemistry sample is required to determine H2 concentration for release rate adjustments.

Step 5.1.1 - Sample 1-GW-TK-1B lAW OP-23.2.12. IF WGDT is NOT being Prepared for release, THEN enter N/A.

STANDARD: Candidate N/As step EVALUATORS NOTE:

If Candidate lists actions of Section 5.5 of OP-23.2.4 Incorrectly, this constitutes Failure Criteria: This section is designed for maintenance; it releases the tank to atmosphere to a final pressure of 0 psig for tank entry.

COMMENTS:

STEP 7: (OP-23.2.4)

STEP 7- 5.1.2 IF the 02 concentration is greater than 1.65 percent and N2 addition is desired OR the tank is being purged after maintenance, THEN open UNSAT 1-GW-755, 1-GW-FCV-104B Outlet Isolation. Otherwise, enter N/A.

(Ref. 2.4.4)

STANDARD: Candidate lists OPENING 1-GW-755 as a required action.

EVALUATORS NOTE: N/A COMMENTS:

071A4.29 SR06301 6 of 16

Surry 2012-301 DiluteaWGDT STEP 8: (OP-23.2.4)

SAT STEP 8- 5.1.3 IF 02 concentration is greater than 1.65 percent and N2 addition is Desired OR the tank is being purged for maintenance, THEN dilute the UNSAT 02 concentration using Attachment 2 and/or Attachment 3 as applicable By performing the following Substeps. Otherwise, enter N/A. (Ref. 2.4.2) a) Place 1-GW-43-GW-104B, 1-GW-FCV-104B Control Switch, in open.

b) Locally check that 1-GW-FCV-104B is open.

c) Adjust nitrogen flow as necessary using 1-GW-PCV-140, N2 Regulator.

STANDARD:

  • Candidate may determine final WGDT pressure for 02 <4% at 34 psig.

Evaluators Cue: If asked, 02 indication at 34 psig is 3.9%.

  • Candidate lists determination that final WGDT pressure as (84+1, -O psig)

Evaluators Cue: If asked, 02 indication at 84 psig is 1.95%.

  • Candidate lists locally opening 1-GW-43-GW-104B as a required action
  • Candidate may list locally adjusting N2 flow as a required action.

EVALUATORS NOTE: NIA COMMENTS:

STEP 9: (OP-23.2.4)

STEP 9- 5.1.4 WHEN tank pressure is at desired pressure, THEN perform the following.

IF tank was NOT diluted in Step 5.1.3, THEN enter N/A. UNSAT

a. Place 1 -GW-43-GW-1 04B, 1 -GW-FCV-i 04B Control Switch, in close.
b. Locally check that i-GW-FCV-104B is closed.

STANDARD:

  • Candidate lists locally closing i-GW-43-GW-104B as a required action EVALUATORS NOTE: NIA COMMENTS:

071A4.29 SRO63O1 7of16

Surry 2012-301 Dilute a WGDT STEP 10: (OP-23.2.4)

SAT STEP 10- 5.1.5 Close l-GW-755. IF 1-GW-755 was NOT opened in Step 5.1.2, THEN enter N/A. (Ref. 2.4.4) UNSAT STANDARD:

  • Candidate lists locally closing 1-GW-755 as a required action EVALUATORS NOTE: NIA COMMENTS:

STEP 11: (OP-23.2.4)

SAT STEP 11- NOTE: After the WGDT Discharge Record has been assigned a number, the form must be accounted for and not destroyed. UNSAT 5.1.6 GettheWGDT Discharge Record from Health Physics. Record the number and the release rate. IF WGDT is NOT being prepared for release, THEN enter N/A.

Number:

Release Rate: cfm STANDARD:

  • Candidate enters N/A for step EVALUATORS NOTE:

Since the WGDT was pressurized to 84 psig, the Applicant may ask if the tank is being prepared for release.

If asked: The WGDT is !iQ being prepared for release.

COMMENTS:

STEP 12: (WD-D9)

STEP 12- Step 14- VERIFY OXYGEN CONCENTRATION LESS THAN OR EQUAL TO 2.0% WITHIN 48 HOURS ON THE OUT-OF-SPEC TANK UNSAT Step 14 RNO actions: Review Tech Spec 3.11 .A. 1 .c.

STANDARD:

  • SRO candidates review applicable specification listed in Step 14 of JPM.

EVALUATORS NOTE: NIA COMMENTS:

071A4.29 SR06301 8of16

Surry 2012-301 Dilute a WGDT STEP 13: (TECH SPECS)

SAT STEP 13- SRO TECH SPEC REVIEW:

UNSAT 3.11 - RADIOACTIVE GAS STORAGE A. Explosive Gas Mixture

1. The concentration of oxygen in the waste gas holdup system shall be limited to less than or equal to 2% by volume whenever the hydrogen concentration could exceed 4% by volume.
a. With the concentration of oxygen in the waste gas holdup system greater than 2% by volume but less than or equal to 4% by volume, reduce the oxygen concentration to the above limits within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />.
b. With the concentration of oxygen in the waste gas holdup system greater than 4% by volume, immediately suspend all additions of waste gases to the affected tank and reduce the concentration of oxygen to less than or equal to 4% by volume, then take the action in l.a above.
c. With the requirements of action l.a above not satisfied, immediately suspend all additions of waste gases to the affected tank until the oxygen concentration is restored to less than or equal to 2% by volume, and submit a special report to the Commission within the next 30 days outlining the following:

(1) The cause of the waste gas decay tank exceeding the 2%

oxygen limit.

(2) The reason why the oxygen concentration could not be returned to within the limits.

(3) The actions taken and the time required to return the oxygen concentration to within limits.

2. The requirements of Specification 3.0.1 are not applicable.

STANDARD:

  • SRO CANDIDATE LISTS REQUIRED TECH SPEC ACTIONS AS:

o Immediately suspend ALL additions of waste gases to the B WGDT and that concentration must be <4%, then the concentration must be <2% within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />.

EVALUATORS NOTE:

Technical Specification requirements do not apply for EQ Candidates.

COMMENTS:

071A4.29 SR06301 9of 16

Surry 2012-301 Dilute aWGDT STEP 14: (WD-D9)

STEP 14- Step 15- PROVIDE NOTIFICATIONS AS NECESSARY:

o OMOC UNSAT o Shift Supervision o STA STANDARD:

EVALUATORS NOTE: NIA COMMENTS:

JPM COMPLETE **

071A4.29 SR06301 10 of 16

Surry 2012-301 Dilute a WGDT KEY Required actions (SROIRO) - Bolded items are Critical Steps.

1. Step 3 of JPM: IDENTIFIES AND DIRECTS CLOSURE OF 1-BR-79.
2. Step 6 of JPM: Candidate N/As step.

If Candidate lists actions of Section 5.5 of OP-23.2.4 Incorrectly, this constitutes Failure Criteria: This section is designed for maintenance; it releases the tank to atmosphere to a final pressure of 0 psig for tank entry.

3. Step 7 of JPM: Candidate lists OPENING 1-GW-755 as a required action.
4. Step 8 of JPM: Candidate may determine final WGDT pressure for 02 <4% at 34 psig.

Evaluators Cue: If asked, 02 indication at 34 psig is 3.9%.

Candidate lists determination that final WGDT pressure as (84 +1, -O psig)

Evaluators Cue: If asked, 02 indication at 84 psig is 1.95%.

Candidate lists locally opening 1-GW-43-GW-104B as a required action Candidate may list locally adjusting N2 flow as a required action.

5. Step 9 of JPM: Candidate lists locally closing 1-GW-43-GW-104B as a required action.
6. Step 10 of JPM: Candidate lists locally closing 1-GW-755 as a required action.

Required actions (SRO) Bolded items are Critical Steps

1. SRO CANDIDATE LISTS REQUIRED TECH SPEC ACTIONS AS:

Immediately suspend ALL additions of waste gases to the B WGDT and that concentration must be <4%, then the concentration must be <2% within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />.

071A4.29 SR06301 11 of 16

INSTRUCTIONS TO APPLICANT (Evaluator Copy)

Conditions

  • Unit land 2 are operating at 100% power.
  • WGDT A is isolated.
  • WGDT B is in service on the A Oxygen analyzer.
  • Annunciator WD-D9, Waste Gas Decay Tanks HI 02, has just been received.

Initiating Cues

  • I am the Shift Manager and you are a licensed operator assigned to the control room.
  • No maintenance or testing activities are in progress.
  • The indication on the oxygen analyzer has been trending up slowly with NO spiking or other abnormalities noted (both Local and MCR indications are NORMAL with NO indications of analyzer failure present)
  • You are to perform the actions of WD-D9 and list the following:

o R0/SRO All required actions to correct the given condition.

o SRO All required actions to correct the given condition and applicable Tech Spec LCOs and applicable time requirements (if any)

  • Due to activity level in the B WGDT, release is not desired at this time.

INSTRUCTIONS TO APPLICANT (Candidate Copy)

Conditions o Unit land 2 are operating at 100% power.

  • WGDT A is isolated.
  • WGDT B is in service on the A Oxygen analyzer.
  • Annunciator WD-D9, Waste Gas Decay Tanks HI 02, has just been received.

Initiating Cues

  • I am the Shift Manager and you are a licensed operator assigned to the control room.
  • No maintenance or testing activities are in progress.
  • The indication on the oxygen analyzer has been trending up slowly with NO spiking or other abnormalities noted (both Local and MCR indications are NORMAL with NO indications of analyzer failure present)
  • You are to perform the actions of WD-D9 and list the following:

o RO/SRO All required actions to correct the given condition.

o SRO All required actions to correct the given condition and applicable Tech Spec LCOs and applicable time requirements (if any)

  • Due to activity level in the B WGDT, release is not desired at this time.

Required actions (SRO!RO):

Applicable Tech Spec LCOs and Required Actions (SRO ONLY):

ISOLATED I I IN SERVICE 225 C 225 C 225 150 150 w w N T T A A 200 200 w w 200 S S w

A A A A T T S S S S E 120 E 120 T 175 T 175 T 175 T 175 G G E E A A

_150 150 150 150 S S A A A A S S S D 90 P D 90 P 125 125 125 125 S S D D D A A E

C C P P 100 100 100 100 G G A A A A C C Y Y Y Y 0 0 F4 T 75 T 75 T 75 T 75 P P K K K A B A

50 A 50 50 543 30 -30 P P p p p R R 25 25 25 25 E E E E E S S S S S

S S

0 0 0 0 0 0 INNER WGDT A OUTER WGDT A INNER WGDT B OUTERWGDT B WAS1:E GS EL4P[RAGM 0DtPR PRESS PRESS PRESS PRESS PRESS CO1 PR A COMPRB 1-GW-PI-1 O2i I -OW-P I-i 029 1-OW-Pt-I 02C 1-OW-P I-I 02D 1-GW-PI-1 OIA 1-C W-P I-I 019

0 0 CN

Surry 2012-301 Dilute a WGDT U.S. Nuclear Regulatory Commission Surry Power Station I V IN Administrative Job Performance Measure GEN2.1.7 (4.4/4.7)

Applicant___________________________________ Start Time_____________________

Examiner__________________________________

Date Stop Time____________________

Title DETERMINE REQUIRED NITROGEN DILUTION FOR OUT OF SPEC WASTE GAS DECAY TANK KIA: G2.1 .7 Ability to evaluate plant performance and make operational judgments based on operating characteristics, reactor behavior, and instrument interpretation. (4.414.7)

Applicability Estimated Time Actual Time ALL 20 Minutes Conditions

  • Task is to be PERFORMED in the classroom.
  • Annunciator 0-WD-D9, Waste Gas Decay Tanks HI 02 has alarmed with an indicated oxygen concentration of 4.2%.

Standards

  • Applicant lists closure of 1-BR-79 to suspend all additions to lB WGDT as required
  • Applicant recognizes that lB WGDT must be reduced to less than or equal to 2% per OP-23.2.4 and associated required valve manipulations to achieve dilution.
  • Applicant correctly calculates 1 B WGDT pressure for 02 dilution, per OP-23.2.4, within +1, -0 psig.
  • SRO Applicant correctly lists TS 3.11 A requirements.

Initiating Cues

  • I am the Shift Manager and you are a licensed operator assigned to the control room. Alarm WD-D9 (WASTE GAS DECAY TANKS HI 02) has just been received.
  • Both units are stable at 100%.
  • No maintenance or testing activities are in progress.
  • The indication on the oxygen analyzer has been trending up slowly with NO spiking or other abnormalities noted (both Local and MCR indications are NORMAL with NO indications of analyzer failure present)
  • You are to perform the actions of WD-D9 and list the following:

o All required actions to correct the given condition o SRO All required actions to correct the given condition and applicable Tech Spec LCOs and applicable time requirements (if any) 071A4.29 SR06301 1 of 16

Surry 2012-301 Dilute a WGDT Terminating Cues

  • Final WGDT pressure after dilution determined using Attachment 2 of OP-23.2.4, Release of Waste Gas Decay Tank lB.

Procedures

  • 0-WD-D9, Waste Gas Decay Tank HI 02.
  • OP-23.2.4, Release of Waste Gas Decay Tank 1 B.
  • Surry Technical Specifications.

Tools and Equipment Safety Considerations

  • None
  • None Simulator Setup for Screen Captures
  • Call up IC-i and initialize.
  • Meter override lB Waste Gas Decay Tank pressure to 30 psig (0.136), and override GW-AIT-150A, pen #

(green) to an indicated concentration of 4.2% (0.42).

  • Verify in service! isolated tanks swapped (Isolated magnet on WGDT A).

Notes 071A4.29 SRO63O1 2of16

Surry 2012-301 Dilute a WGDT PERFORMANCE CHECKLIST Notes to the Evaluator

  • Task critical elements are bolded and noted at the end of the step as CRITICAL STEP.
  • START TIME:

STEP 1: (WD-D9)

STEP I - Step 1. CHECK l&C TESTING - IN PROGRESS

  • 1-GW-AIT-150A UNSAT OR
  • 1-GW-AIT-150B STANDARD:

Recognizes from initial cue that no maintenance or testing activities are in progress and GOES TO STEP 6.

EVALUATORS NOTE: N!A COMMENTS:

STEP 2: (WD-D9)

STEP 2 - Notes prior to step 6:

  • Recorder Trace spiking is indicative of a clogged or worn sensing device. UNSAT
  • Red pen indicates for Analyzer A. Green pen indicates for Analyzer B.

Step 6- CHECK RECORDER FOR IN-SERVICE TANK ANALYZER FAILED -

  • Recorder Trace SPIKING OR
  • Local Power Light OFF-OR
  • Local oxygen concentration NOT INDICATED STANDARD:

Recognizes from initial cue that no indications exist that analyzer has failed and goes to RNO column.

EVALUATORS NOTE:

If asked: No spiking has been noted.

If asked: Local power is Lit.

If asked: Local Oxygen concentration is indicated.

COMMENTS:

071A4.29 5R06301 3of16

Surry 2012-301 Dilute a WGDT STEP 3: (WD-D9)

SAT STEP 3 - Step 6 RNO Actions: IF oxygen concentration is greater than 4%, THEN do the following: UNSAT a) Immediately suspend all additions of waste gases to the affected tank by closing 1-BR-79 and reduce oxygen concentration to less than or equal to 4%.

b) GOTOStepl3.

STANDARD:

  • Identifies oxygen concentration is greater than 4% and lists the closure of 1-BR-79 as a required action and goes to step 13. IDENTIFIES AND DIRECTS CLOSURE OF 1-BR-79.

EVALUATORS NOTE: NIA COMMENTS:

STEP 4: (WD-D9)

SAT STEP 4 - Note prior to step 13:

  • The maximum pressure allowed in the WGDT is 115 psig. (Actual Pressure UNSAT 30 psig See Handout)

Step 13- REDUCE OXYGEN TO LESS THAN OR EQUAL TO 2.0% WITHIN 48 HOURS ON OUT-OF-SPEC TANK lAW APPROPRIATE OPERATING PROCEDURE:

  • OP-23.2.3, RELEASE OF WASTE GAS DECAY TANK 1A OR
  • OP-23.2.4, RELEASE OF WASTE GAS DECAY TANK 1 B STANDARD:
  • Trainee requests copy of OP-23.2.4 to reduce Oxygen concentration.

EVALUATORS NOTE: OP-23.2.4 actions begin on next Step (Step 5) of the JPM.

Remaining ARP actions for WD-D9 are on Page 8 of 16.

COMMENTS:

071A4.29 SR06301 4of16

Surry 2012-301 Dilute a WGDT STEP 5: (OP-23.2.4)

STANDARD:

UN SAT Candidate Reviews Initial Conditions and Precautions and Limitations of OP-23.2.4.

3.0 INITIAL CONDITIONS 3.1 Check that the Waste Gas Decay Tank has been on Holdup for as long as possible. (Holdup is not required for purging the tank after maintenance.) (Ref. 2.4.1) 3.2 Neither unit PRT is aligned to the Process Vent System.

4.0 PRECAUTIONS AND LIMITATIONS 4.1 To ensure the maximum Holdup time for the Waste Gas Decay Tank, an evaluation of existing plant conditions must be made before release.

(Ref. 2.4.1) 4.2 When the Waste Gas Decay Tank H2 concentration is greater than 4 percent by volume, the 02 concentration must not be greater than 2 percent by volume. (Ref. 2.4.2) 4.3 The minimum operable channels for the Surry Radioactive Gaseous Effluent Monitoring Instrumentation for the Process Vent System are listed in VPAP-2103S.

4.4 If the MGPI Process Vent skid is inoperable, Health Physics must adjust Process Vent Accountability Sampler Flow to between 1.0 to 3.0 cfm.

4.5 With both WGDT Gas Analyzer A and Analyzer B out of service, a WGDT in service, and 1-BR-79, 1-BR-TK-6 to 1-GW-TK-2 Isol, open, grab samples shall be collected at least once each 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> during degassing operations to the WGDT and at least once each 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> during other operations. Samples shall be analyzed within four hours after collection. (Ref. 2.4.2) 4.6 The WGDT maximum pressure is 115 psig. (Ref. 2.4.2) 4.7 If the Operations Computer Calculation Program is used, the procedure revision number and the calculation revision number must be the same.

COMMENTS:

071A4.29 SR06301 5of16

Surry 2012-301 Dilute a WGDT STEP 6: (OP-23.2.4)

SAT STEP 6- Section 5.1 Waste Gas Decay Tank 1 B Sampling and/or Dilution UNSAT Note: A Chemistry sample is required to determine H2 concentration for release rate adjustments.

Step 5.1.1 - Sample 1-GW-TK-1B lAW OP-23.2.12. IF WGDT is NOT being Prepared for release, THEN enter N/A.

STANDARD: Candidate N/As step EVALUATORS NOTE:

If Candidate lists actions of Section 5.5 of OP-23.2.4 Incorrectly, this constitutes Failure Criteria: This section is designed for maintenance; it releases the tank to atmosphere to a final pressure of 0 psig for tank entry.

COMMENTS:

STEP 7: (OP-23.2.4)

SAT STEP 7- 5.1.2 IF the 02 concentration is greater than 1.65 percent and N2 addition is desired OR the tank is being purged after maintenance, THEN open UNSAT 1-GW-755, 1-GW-FCV-104B Outlet Isolation. Otherwise, enter N/A.

(Ref. 2.4.4)

STANDARD: Candidate lists OPENING 1-GW-755 as a required action.

EVALUATORS NOTE: NIA COMMENTS:

071A4.29 5R06301 6of16

Surry 2012-301 Dilute a WGDT STEP 8: (OP-23.2.4)

STEP 8- 5.1.3 IF 02 concentration is greater than 1.65 percent and N2 addition is Desired OR the tank is being purged for maintenance, THEN dilute the UNSAT 02 concentration using Attachment 2 and/or Attachment 3 as applicable By performing the following Substeps. Otherwise, enter N/A. (Ref. 2.4.2) a) Place 1-GW-43-GW-104B, 1-GW-FCV-104B Control Switch, in open.

b) Locally check that 1-GW-FCV-104B is open.

c) Adjust nitrogen flow as necessary using 1-GW-PCV-140, N2 Regulator.

STANDARD:

  • Candidate may determine final WGDT pressure for 02 <4% at 34 psig.

Evaluators Cue: If asked, 02 indication at 34 psig is 3.9%.

  • Candidate lists determination that final WGDT pressure as (84 +1, -O psig)

Evaluators Cue: If asked, 02 indication at 84 psig is 1.95%.

  • Candidate lists locally opening 1-GW-43-GW-104B as a required action
  • Candidate may list locally adjusting N2 flow as a required action.

EVALUATORS NOTE: NIA COMMENTS:

STEP 9: (OP-232.4)

STEP 9- 5.1.4 WHEN tank pressure is at desired pressure, THEN perform the following.

IF tank was NOT diluted in Step 5.1.3, THEN enter N/A. UNSAT

a. Place 1 -GW-43-GW-1 04B, 1 -GW-FCV-1 04B Control Switch, in close.
b. Locally check that 1-GW-FCV-104B is closed.

STANDARD:

  • Candidate lists locally closing 1-GW-43-GW-104B as a required action EVALUATORS NOTE: NIA COMMENTS:

071A4.29 SR06301 7of16

Surry 2012-301 Dilute a WGDT STEP 10: (OP-23.24)

SAT STEP 10- 5.1.5 Close l-GW-755. IF 1-GW-755 was NOT opened in Step 5.1.2, THEN enter N/A. (Ref. 2.4.4) UNSAT STANDARD:

  • Candidate lists locally closing 1-GW-755 as a required action EVALUATORS NOTE: NIA COMMENTS:

STEP 11: (OP-23.2.4)

STEP 11- NOTE: After the WGDT Discharge Record has been assigned a number, the form must be accounted for and not destroyed. UNSAT 5.1.6 Get the WGDT Discharge Record from Health Physics. Record the number and the release rate. IF WGDT is NOT being prepared for release, THEN enter N/A.

Number:

Release Rate: cfm STANDARD:

  • Candidate enters N/A for step EVALUATORS NOTE:

Since the WGDT was pressurized to 84 psig, the Applicant may ask if the tank is being prepared for release.

If asked: The WGDT is not being prepared for release.

COMMENTS:

STEP 12: (WD-D9)

SAT STEP 12- Step 14- VERIFY OXYGEN CONCENTRATION LESS THAN OR EQUAL TO 2.0% WITHIN 48 HOURS ON THE OUT-OF-SPEC TANK UNSAT Step 14 RNO actions: Review Tech Spec 3.11 .A.1 .c.

STANDARD:

  • SRO candidates review applicable specification listed in Step 14 of JPM.

EVALUATORS NOTE: NIA COMMENTS:

071A4.29 SR06301 8of16

Surry 2012-301 Dilute a WGDT STEP 13: (TECH SPECS)

STEP 13- SRO TECH SPEC REVIEW:

UNSAT 3.11 - RADIOACTIVE GAS STORAGE A. Explosive Gas Mixture

1. The concentration of oxygen in the waste gas holdup system shall be limited to less than or equal to 2% by volume whenever the hydrogen concentration could exceed 4% by volume.
a. With the concentration of oxygen in the waste gas holdup system greater than 2% by volume but less than or equal to 4% by volume, reduce the oxygen concentration to the above limits within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />.
b. With the concentration of oxygen in the waste gas holdup system greater than 4% by volume, immediately suspend all additions of waste gases to the affected tank and reduce the concentration of oxygen to less than or equal to 4% by volume, then take the action in l.a above.
c. With the requirements of action l.a above not satisfied, immediately suspend all additions of waste gases to the affected tank until the oxygen concentration is restored to less than or equal to 2% by volume, and submit a special report to the Commission within the next 30 days outlining the following:

(1) The cause of the waste gas decay tank exceeding the 2%

oxygen limit.

(2) The reason why the oxygen concentration could not be returned to within the limits.

(3) The actions taken and the time required to return the oxygen concentration to within limits.

2. The requirements of Specification 3.0.1 are not applicable.

STANDARD:

  • SRO CANDIDATE LISTS REQUIRED TECH SPEC ACTIONS AS:

o Immediately suspend ALL additions of waste gases to the B WGDT and that concentration must be <4%, then the concentration must be <2% within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />.

EVALUATORS NOTE:

Technical Specification requirements do not apply for Q Candidates.

COMMENTS:

071A4.29 5R06301 9of16

Surry 2012-301 Dilute a WGDT STEP 14: (WD-D9)

STEP 14- Step 15- PROVIDE NOTIFICATIONS AS NECESSARY:

o OMOC UNSAT o Shift Supervision o STA STANDARD:

EVALUATORS NOTE: NIA COMMENTS:

JPM COMPLETE 071A4.29 SR06301 lOofl6

Surry 2012-301 DiIuteaWGDT KEY Required actions (SROIRO) - Bolded items are Critical Steps.

1. Step 3 of JPM: IDENTIFIES AND DIRECTS CLOSURE OF 1-BR-79.
2. Step 6 of JPM: Candidate N/As step.

If Candidate lists actions of Section 5.5 of OP-23.2.4 Incorrectly, this constitutes Failure Criteria: This section is designed for maintenance; it releases the tank to atmosphere to a final pressure of 0 psig for tank entry.

3. Step 7 of JPM: Candidate lists OPENING 1-GW-755 as a required action.
4. Step 8 of JPM: Candidate may determine final WGDT pressure for 02 <4% at 34 psig.

Evaluators Cue: If asked, 02 indication at 34 psig is 3.9%.

Candidate lists determination that final WGDT pressure as (84 +1, -o psig)

Evaluators Cue: If asked, 02 indication at 84 psig is 1.95%.

Candidate lists locally opening 1-GW-43-GW-104B as a required action Candidate may list locally adjusting N2 flow as a required action.

5. Step 9 of JPM: Candidate lists locally closing 1-GW-43-GW-104B as a required action.
6. Step 10 of JPM: Candidate lists locally closing 1-GW-755 as a required action.

Required actions (SRO) Bolded items are Critical Steps

1. SRO CANDIDATE LISTS REQUIRED TECH SPEC ACTIONS AS:

Immediately suspend ALL additions of waste gases to the B WGDT and that concentration must be <4%, then the concentration must be <2% within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />.

071A4.29 SR06301 11 of 16

INSTRUCTIONS TO APPLICANT (Evaluator Copy)

Conditions

  • Unit land 2 are operating at 100% power.
  • WGDT A is isolated.
  • WGDT B is in service on the A Oxygen analyzer.
  • Annunciator WD-D9, Waste Gas Decay Tanks HI 02, has just been received.

Initiating Cues

  • I am the Shift Manager and you are a licensed operator assigned to the control room.
  • No maintenance or testing activities are in progress.
  • The indication on the oxygen analyzer has been trending up slowly with NO spiking or other abnormalities noted (both Local and MCR indications are NORMAL with NO indications of analyzer failure present)
  • You are to perform the actions of WD-D9 and list the following:

o R0/SRO All required actions to correct the given condition.

o SRO All required actions to correct the given condition and applicable Tech Spec LCOs and applicable time requirements (if any)

INSTRUCTIONS TO APPLICANT (Candidate Copy)

Conditions

  • Unit land 2 are operating at 100% power.
  • WGDT A is isolated.
  • WGDT B is in service on the A Oxygen analyzer.
  • Annunciator WD-D9, Waste Gas Decay Tanks HI 02, has just been received.

Initiating Cues

  • I am the Shift Manager and you are a licensed operator assigned to the control room.
  • No maintenance or testing activities are in progress.
  • The indication on the oxygen analyzer has been trending up slowly with NO spiking or other abnormalities noted (both Local and MCR indications are NORMAL with NO indications of analyzer failure present)
  • You are to perform the actions of WD-D9 and list the following:

o RO/SRO All required actions to correct the given condition.

o SRO All required actions to correct the given condition and applicable Tech Spec LCOs and applicable time requirements (if any)

Required actions (SROIRO):

Applicable Tech Spec LCOs and Required Actions (SRO ONLY):

L ISOLATED IN SERVICE 225 0 225 225 225 150 150 U wA wA T

200 200 200 200 S S w A w

A A A A A T T 3 E 120 E 123 T 175 175 175 175 G

A n

150 150 G 153 153 S S A A A A 3 3 D 93 P D 93 P 125 125 125 125 2 S D D A n

P P H

100 100 100 S A A A Y Y l 0 53 75 75 75 ri M P P A

8 A 50 A 50 50 90 90 2 2 P P R R 2 25 E E 3 S S S S 3

0 a 0 0 0 INNER WGDT A OUTER WGDT A INNER WGDT 8 OUTERAGDT B WASE GkS )L&PR DO.PR PRESS PRESS PRESS PRESS PRESS CO M PR A COMPR B 1-GW-PI-1 02A 1-GW-PI-1 028 1-GW-PI-l 02C 1-CW-PI-1 02D 1 -GW-P -1 01 A 1 -OW-P 1-1018

a 0 0

a

Surry 2012-301 SRO Procedure Review (1-OPT-RS-007)

U.S. Nuclear Regulatory Commission Surry Power Station Administrative Job Performance Measure GEN2.2.12 (3.7/4.1)

Applicant___________________________________ Start Time_____________________

Examiner__________________________________

Date Stop Time____________________

Title Periodic Test Review 1-OPT-RS-007 (REV 12), CONTAINMENT OUTSIDE RECIRCULATION SPRAY PUMPS MOV STROKE TEST KIA: GEN2.2.12 Knowledge of surveillance procedures.

Applicability Estimated Time Actual Time SRO(I)/SRO(U) 45 Minutes Conditions

  • Task is to be PERFORMED in the classroom.

Standards

  • Reviews completed 1-OPT-RS-007 (REV 12), CONTAINMENT OUTSIDE RECIRCULATION SPRAY PUMPS MOV STROKE TEST, for accuracy and determines operability.

Initiating Cues

  • I am the Shift Manager and you are the Unit Supervisor. Here is a copy of 1-OPT-RS-007 (REV 12),

CONTAINMENT OUTSIDE RECIRCULATION SPRAY PUMPS MOV STROKE TEST, which has just been completed.

  • This was a quarterly test.
  • Review 1-OPT-RS-007 (REV 12), CONTAINMENT OUTSIDE RECIRCULATION SPRAY PUMPS MOV STROKE TEST, for completeness and accuracy.
  • Document any issues identified during review and operability requirements, if any, on the answer sheet provided.

G2.2.12 SR1O3O1 1 of 12

Surry 2012-301 SRO Procedure Review (1-OPT-RS-007)

Terminating Cues

  • Applicant has completed the procedure review and discussed problems with examiner.

Tools and Equipment

  • Calculator
  • Copy of completed 1-OPT-RS-007 (REV 12), CONTAINMENT OUTSIDE RECIRCULATION SPRAY PUMPS MOV STROKE TEST.
  • Copy of Surry Technical Specifications Safety Considerations
  • None Notes:

G2.2.12 SR1O3O1 2of12

Surry 2012-301 SRO Procedure Review (1-OPT-RS-007)

PERFORMANCE CHECKLIST Notes to the Evaluator

  • Task critical elements are bolded and noted at the end of the step as CRITICAL STEP.
  • START TIME:

STEP 1:

STEP I - Review the purpose of the procedure (Section 1.0)

UNSAT STANDARD:

  • Reviews purpose of procedure step 1.1.

EVALUATORS NOTE: N1A COMMENTS:

STEP 2:

STEP 2 - Review the References section (Section 2.0)

UNSAT STANDARD:

EVALUATORS NOTE: NIA COMMENTS:

G2.2.12 SRI 0301 3 of 12

Surry 2012-301 SRO Procedure Review (1-OPT-RS-007)

STEP 3:

STEP 3 - Reviews the Initial Conditions section (Section 3.0)

UNSAT STANDARD:

  • Reviews Initial Conditions steps 3.1.

EVALUATORS NOTE: NIA COMMENTS:

STEP 4:

SAT STEP 4 - Reviews the Precautions and Limitations section (Section 4.0)

UNSAT STANDARD:

  • Reviews precautions and limitations steps 4.1 - 4.4.

EVALUATORS NOTE: NIA COMMENTS:

G2.2.12 5R10301 4of12

Surry 2012-301 SRO Procedure Review (1-OPT-RS-007)

STEP 5:

SAT STEP 5 - Reviews the Special Tools and Equipment section (Section 5.0)

UNSAT STANDARD:

  • Reviews Special Tools and Equipment section steps 5.1 - 5.2.

EVALUATORS NOTE: NIA COMMENTS:

STEP 6:

STEP 6.1 - Reviews Work Preparation section (Section 6.1).

UNSAT STANDARD:

  • Verifies proper placekeeping on all steps.
  • Verifies step 6.1.1 is initialed and SQC numbers and Cal Due Dates are recorded.

CANDIDATE IDENTIFIES THAT ONE STOPWATCH USED IS NOT IN CAL THIS IS A CRITICAL STEP EVALUATORS NOTE: NIA COMMENTS:

G2.2.12 SR1O3O1 5of12

Surry 2012-301 SRO Procedure Review (1-OPT-RS-007)

STEP 7:

SAT STEPS 6.2-6.5 - Reviews Steps 6.2 6.5 of 1-OPT-RS-007 UNSAT STANDARD:

  • Verifies proper placekeeping on all steps, notes, and cautions.
  • Verifies step 6.2. 6.5 are properly initialed (including substeps).
  • Verifies step 6.4.3, 6.4.5, 6.5.3, and 6.5.5 are checked SAT EVALUATORS NOTE: NIA COMMENTS:

STEP 8:

SAT STEP 7.0- Reviews Follow-On section of procedure (Section 7.1 7.4).

UNSAT STANDARD:

  • Verifies proper placekeeping on all steps, notes, and cautions.
  • Evaluates the acceptance criteria in step 7.1.1 by reviewing attachment data referenced for each bulleted item. CANDIDATE IDENTIFIES THAT TWO ITEMS ARE CHECKED AS ACCEPTABLE THAT WERE NOT THIS IS A CRITICAL STEP a Test values recorded on Attachment 1 are satisfactory.
  • Test values recorded on Attachment 2 are satisfactory.
  • Candidate identifies that 7.1.2 has Satisfactory checked vs. Unsatisfactory THIS IS A CRITICAL STEP
  • Candidate identifies that 7.2.3 should not be N/A and substeps a, b, & c need to be performed.
  • Candidate identifies that step 7.2.4 was N/A by mistake.

EVALUATORS NOTE: N/A COMMENTS:

G2.2.12 SR1O3O1 6of 12

Surry 2012-301 SRO Procedure Review (1-OPT-RS-007)

STEP 9:

ATTACHMENT 1- Reviews Attachment 1 Data.

UNSAT STANDARD:

  • Reviews Attachment 1 data (reference step 6.2.1) and IDENTIFIES THAT 1-RS-MOV-156A CLOSE TIME IS UNACCEPTABLE THIS IS A CRITICAL STEP EVALUATORS NOTE: NIA COMMENTS:

STEP 10:

SAT ATTACHMENT 2- Reviews Attachment 2 Data.

UNSAT STANDARD:

  • Reviews Attachment 2 data (reference step 6.3.1) and IDENTIFIES THAT 1-RS-MOV-156B CLOSE TIME IS UNACCEPTABLE THIS IS A CRITICAL STEP EVALUATORS NOTE: NIA COMMENTS:

STEP 11:

SAT Determines administrative actions required:

UNSAT STANDARD:

  • Identifies non-compliance with 3.4.A.2
  • Identifies non-compliance with 3.4.A.5
  • Determines that current plant conditions are not in compliance with 3.4.B.2 (only one pump allowed to be inoperable, but currently two pumps are inoperable)
  • SRO determines that a 3.0.1 clock exists (6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> to HSD and 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br /> to CSD) due to NO operable outside recirc spray pumps. THIS IS A CRITICAL STEP JPM Complete G2.2.12 SRi 0301 7 of 12

Surry 2012-301 SRO Procedure Review (1-OPT-RS-007)

STOP TIME:

G2.2.12 SRi 0301 8 of 12

Surry 2012-301 SRO Procedure Review (1-OPT-RS-007)

ANSWER KEY NOT FOR TRAINEE 1 -OPT-RS-007 REVIEW

1. Step 6.1.1 Listed stopwatch is out of CAL. (CRITICAL TASK)
2. Step 7.1.1 Attachment I and 2 are checked as acceptable when they contain UNACCEPTABLE data. (CRITICAL TASK)
3. Step 7.1.2 Test marked as Satisfactory when actually Unsatisfactory. (Critical Task)
4. Step 7.2.3 step is N/A and should have been performed. (NOT CRITICAL TASK)
5. Step 7.2.4 Candidate identifies that step 7.2.4 was N/A by mistake (NOT CRITICAL TASK)
6. Attachment 1, identifies that 1-RS-MOV-156A close time is unacceptable (CRITICAL TASK)
7. Attachment 2, identifies that 1-RS-MOV-156B close time is unacceptable (CRITICAL TASK)
8. They are in violation of Tech Spec 3.4 (A.2 and A.5) because there are NO OPERABLE OUTSIDE RECIRC SPRAY PUMPS. They are in a 6130 clock iaw Tech Spec 3.0.1. (CRITICAL TASK)

G2.2.12 SRi 0301 9 of 12

Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)

Task

  • Task is to be performed in the classroom.
  • Review 1-OPT-RS-007 (REV 12), CONTAINMENT OUTSIDE RECIRCULATION SPRAY PUMPS MOV STROKE TEST, for completeness and accuracy.

Directions The evaluator will explain the initial conditions of the task to be performed and will provide the initiating cue. Ensure you indicate to the evaluator when you understand your assigned task.

Initial Conditions:

  • Unit 1 is at 100% power.
  • 1-OPT-RS-007 (REV 12), CONTAINMENT OUTSIDE RECIRCULATION SPRAY PUMPS MOV STROKE TEST, which has just been completed.

Initiating Cues

  • I am the Shift Manager and you are the Unit Supervisor. Here is a copy of 1-OPT-RS-007 (REV 12),

CONTAINMENT OUTSIDE RECIRCULATION SPRAY PUMPS MOV STROKE TEST, which has just been completed.

  • This was a quarterly test.
  • Review 1-OPT-RS-007 (REV 12), CONTAINMENT OUTSIDE RECIRCULATION SPRAY PUMPS MOV STROKE TEST, for completeness and accuracy.
  • Document any issues identified during review and operability requirements, if any, on the answer sheet provided.

Operator Directions Handout (TO BE GIVEN TO APPLICANT)

Initial Conditions:

  • Unit 1 is at 100% power.
  • 1-OPT-CH-002 (REV 47), CHARGING PUMP OPERABILITY AND PERFORMANCE TEST FOR 1-CH-P-1 B, has just been completed..

Initiating Cues

  • I am the Shift Manager and you are the Unit Supervisor. Here is a copy of 1-OPT-RS-007 (REV 12),

CONTAINMENT OUTSIDE RECIRCULATION SPRAY PUMPS MOV STROKE TEST, which has just been completed.

  • This was a quarterly test.
  • Review 1-OPT-RS-007 (REV 12), CONTAINMENT OUTSIDE RECIRCULATION SPRAY PUMPS MOV STROKE TEST, for completeness and accuracy.
  • Document any issues identified during review and operability requirements, if any, on the answer sheet provided.

ANSWER SHEET 1 -OPT-RS-007 REVIEW

Surry Calculate Dose and Best Work Method U.S. Nuclear Regulatory Commission Surry Power Station Administrative Job Performance Measure G2.3.4 F I NA LI_I Applicant___________________________________ Start Time_____________________

Examiner__________________________________

Date Stop Time____________________

Title Calculate Dose and Best Work Method K/A: G2.3.4 Knowledge of radiation exposure limits under normal or emergency conditions. (3.213.7)

Applicability Estimated Time Actual Time ALL 25 Minutes Conditions

  • Task is to be PERFORMED in the classroom.

Standards

  • Determines the dose for opening 1-RH-MOV-1700 while traveling via the spiral staircase.
  • Determines that operator 2 is capable of performing the given evolution without exceeding admin dose limits.

Initial Conditions:

  • Unit 1 has experienced a small break LOCA with a safety injection.
  • The Operating Team is attempting to place the Residual Heat Removal System in service, but they are unable to open 1-RH-MOV-1 700 from the Main Control Room.
  • General area radiation levels have been manually estimated based on installed radiation monitor readings.
  • Survey maps of the Unit 1 Containment are available, showing dose rates and one way travel time to reach the valve.
  • The estimated time in the A room to open the valve is 8 minutes.
  • Health Physics personnel are currently unavailable to provide assistance for dose determination.

Page 1 of 9

Surry Calculate Dose and Best Work Method

  • On the 36 elevation, travel time (one way) is all the way to 1-RH-MOV-1700. Calculate dose received on travel on the 36 based on pathway dose and not dose rate in loop room- time to walk across loop room floor to 1-RH-MOV-1 700 is negligible.
  • Assess each individual to determine which individuals could be assigned to perform this task ensuring admin dose limits will not be exceeded. Assume a dose upgrade to the ADMIN LIMIT has been received.
  • Operator #1: Annual Dose = 317 mrem TEDE
  • Operator #2: Annual Dose = 275 mrem TEDE at Surry, but also has 750 mr exposure this year from previous employment for another utilitys power station.

Initiating Cues You have been directed to determine:

1. The total dose to open 1-RH-MOV-1700, including travel to and from the valve.
2. Which operator(s) could be assigned to perform this task ensuring admin dose limits will not be exceeded.

Assume a dose upgrade to the ADMIN LIMIT has been received.

Terminating Cues

  • Determines the dose for opening 1-RH-MOV-1700 is 1700 mr and that operator 2 can be used.

Tools and Equipment

  • Calculator
  • Survey Data
  • VPAP-2101 Safety Considerations
  • None Notes Page 2 of 9

Surry Calculate Dose and Best Work Method PERFORMANCE CHECKLIST Notes to the Evaluator

  • Task critical elements are bolded and noted at the end of the step as CRITICAL STEP.
  • START TIME:

STEPS CAN BE PERFORMED IN ANY ORDER STEP 1: Calculate exposure at valve.

UNSAT STANDARD:

1. To open the valve - (6 R/HR)(1 000 MRJR)(1 HR/60 MIN)(8 MIN)= 800 MR COMMENTS:

STEPS CAN BE PERFORMED IN ANY ORDER STEP 2: Calculate exposure from using spiral staircase.

UNSAT STANDARD:

1. (1 R/HR)(1000 MR/R)(1 HR/60 MIN)(2 MIN)(2 TRIPS) = 67 MR.

(Personnel Hatch to Spiral Staircase)

2. (3 R/HR)(1 000 MRJR)(1 HRI6O MIN)(3 MIN)(2 TRIPS) = 300 MR.

(Spiral Staircase)

3. (4 R/HR)(1000 MRIR)(1 HR/60 MIN)(4 MIN)(2 TRIPS) = 533 MR.

(Spiral Staircase on 36 to valve)

4. (67 MR)+(300 MR)+(533 MR)+(800MR) = 1700 MR.

EVALUATORS NOTES: Total exposure via this path including time at the valve: 1700 mr.

(acceptable band 1699-1701 mr). THIS IS A CRITICAL STEP COMMENTS:

Page 3 of 9

Surry Calculate Dose and Best Work Method STEPS CAN BE PERFORMED IN ANY ORDER STEP 3: Determines the operator that can perform the task.

UNSAT STANDARD:

Operator #1: CANNOT be assigned the task. The dose received would cause the operator to exceed admin limit of 2.0 remlyear Operator #2: CAN be assigned the task without exceeding limits. Will remain within 3 remlyear admin limit.

EVALUATORS NOTES: Determines Operator 2 is capable of performing the task. THIS IS A CRITICAL STEP COMMENTS:

STOP TIME:

Page 4 of 9

Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)

Task

  • Task is to be performed in the classroom.
  • You have been directed to determine:
1. The total dose to open 1-RH-MOV-1700, including travel to and from the valve.
2. Which operator(s) could be assigned to perform this task ensuring admin dose limits will not be exceeded.

Assume a dose upgrade to the ADMIN LIMIT has been received.

Directions The evaluator will explain the initial conditions of the task to be performed and will provide the initiating cue. Ensure you indicate to the evaluator when you understand your assigned task.

Initial Conditions:

  • Unit 1 has experienced a small break LOCA with a safety injection.
  • The Operating Team is attempting to place the Residual Heat Removal System in service, but they are unable to open 1-RH-MOV-1 700 from the Main Control Room.
  • General area radiation levels have been manually estimated based on installed radiation monitor readings.
  • Survey maps of the Unit 1 Containment are available, showing dose rates and one way travel time to reach the valve.
  • The estimated time in the A room to open the valve is 8 minutes.
  • Health Physics personnel are currently unavailable to provide assistance for dose determination.
  • On the 36 elevation, travel time (one way) is all the way to 1-RH-MOV-1700. Calculate dose received on travel on the 36 based on pathway dose and not dose rate in loop room- time to walk across loop room floor to 1-RH-MOV-1 700 is negligible.

Initiating Cues You have been directed to:

1. Calculate the total dose to open 1 -RH-MOV-1 700, including travel to and from the valve.
2. Determine which operator(s) could be assigned to perform this task ensuring admin dose limits will not be exceeded. Assume a dose upgrade to the ADMIN LIMIT has been received.
  • Operator #1: Annual Dose = 317 mrem TEDE
  • Operator #2: Annual Dose = 275 mrem TEDE at Surry, but also has 750 mr exposure this year from previous employment for another utilitys power station.

Operator Directions Handout (TO BE GIVEN TO APPLICANT)

Task

  • Task is to be performed in the classroom.
  • You have been directed to determine:
1. The total dose to open 1-RH-MOV-1700, including travel to and from the valve.
2. Which operator(s) could be assigned to perform this task ensuring admin dose limits will not be exceeded.

Assume a dose upgrade to the ADMIN LIMIT has been received.

Initial Conditions:

  • Unit 1 has experienced a small break LOCA with a safety injection.
  • The Operating Team is attempting to place the Residual Heat Removal System in service, but they are unable to open 1-RH-MOV-1 700 from the Main Control Room.
  • General area radiation levels have been manually estimated based on installed radiation monitor readings.
  • Survey maps of the Unit 1 Containment are available, showing dose rates and one way travel time to reach the valve.
  • The estimated time in the A room to open the valve is 8 minutes.
  • Health Physics personnel are currently unavailable to provide assistance for dose determination.
  • On the 36 elevation, travel time (one way) is all the way to 1-RH-MOV-1700. Calculate dose received on travel on the 36 based on pathway dose and not dose rate in loop room- time to walk across loop room floor to 1-RH-MOV-1 700 is negligible.

Initiating Cues You have been directed to:

1. Calculate the total dose to open 1 -RH-MOV-1 700, including travel to and from the valve.
2. Determine which operator(s) could be assigned to perform this task ensuring admin dose limits will not be exceeded. Assume a dose upgrade to the ADMIN LIMIT has been received.
  • Operator #1: Annual Dose = 317 mrem TEDE
  • Operator #2: Annual Dose = 275 mrem TEDE at Surry, but also has 750 mr exposure this year from previous employment for another utilitys power station.

Candidate Answer Form

1. The total Dose for opening 1-RH-MOV-1 700 is: mr.
2. Operator(s) that are capable of performing this task WITHOUT exceeding ADMIN DOSE limits are (circle answer for each operator):
  • Operator 1 is CAPABLE of performing the Task within dose limits: YES / NO
  • Operator 2 is CAPABLE of performing the Task within dose limits: YES / NO

DOMINION RP-AA-221 Revision 0 Page 13 of 13 ATTACHMENT B (Page lof 1) p Number Location/Description Reactor Power 100 Unit I Containment 47 Etevat ion Unit(s)

Purpose:

Type: Radiation Unit I ISD% Unit 2 100%

Contamination Air Sampte LI RouUne Special LI RWP Gamma LI Beta LINeutron LI LI C)

GA LA DRP LI LI LI GA ws Instrument Model Serial #

LI All GA Smears < 1000 dpm/lOOcm LI Air Sample Results %DAC installed N/A LI All GA Smears < 20 dpm/lOOCm 2 Alpha LI No DRP Detected Radiation LI All LA Smears < 1000 dpm/LAS All Gamma readings in monitors mr/hr unless noted on map throughout Comments: General area based on Containment Radiation Monitors. l000mr=1R containment JJIIfl Denotes Travel Path Surveyed By (Print/Signature) Date Time Reviewed By (Print/Signature) Date Today Now 4/1

= Radiation Area P7e4cfl CA = Contaminated Area LDWA Low Dose Waiting Area rA High Radiation Area RCA Radiological Control Area HPA = Hot Particle Area LHRA Locked High Radiation Area ARA = Airborne Radioactivity Area NEA = Neutron Exposure Area VHRA Very High Radiation Area RMA Radioactive Materialist Area DRP = Discrete Radioactive Particle Q =Smear Location A A/S Location # G/A Dose Rate #° Contact Dose Rate x x x = Radiological Boundary

DOMINION rcqc RP221 Revision 0 Page 13 of 13 ATTACHMENT B

Surry SR2012-301 EP1P-2.O1 Update Surry Power Station Audit Examination Administrative Job Performance Measure G2.4.39 A

L TIME CRITICAL Applicant____________________________ StartTime 1VN I d Examiner________________________________

Date Stop Time____________________

Title Complete EPIP-2.01, Attachment 3, Update Message.

KIA: G.2.4.39 Knowledge of RO responsibilities in emergency plan implementation. (3.913.8)

Applicability Estimated Time Actual Time RO 10 Minutes Conditions

  • Task is to be PERFORMED in the CLASSROOM.

Standards

  • Update message complete lAW EPIP-2.01.

Initiating Cues

  • Significant event notification.
  • EPIP-1 .01, Emergency Manager Controlling Procedure.
  • EPIP-2.01, Notification of State and Local Governments, continuous action page Terminating Cues
  • EPIP 2.01, Attachment 2 update message completed.

Tools and Equipment

  • EPIP-2.01, Notification of State and Local Governments, Revision 41
  • EMCOMM Printout for MET Data
  • EPIP-2.01, Message #2 copy
  • EPIP-2.01, Attachment 2, Blank Form Safety Considerations
  • None Page 1 of 10

Initial Conditions:

  • Unit I and 2 at 100% power. Unit I manually tripped and safety injection actuated due to a Steam Generator Tube Rupture on B SG.
  • When 1-MS-TV-biB closed, 1-MS-RV-1O1B failed to operate causing 1-MS-SV-1O1B to lift and subsequently failed to close.

Initiating Cues

  • This is a TIME CRITICAL JPM.
  • I am the SEM and you are the State and Local Communicator. Currently located in the TSC
  • A Site Area Emergency was declared based on FS1 .1 at 0953, today.
  • When B SG MSTV manually closed, B SG PORV failed to operate causing i-MS-SV-b01 B to lift and subsequently failed to close. A team is currently being briefed to attempt to gag 1 -MS-SV-1 016.
  • Forty-Five (45) minutes have elapsed since the start time of Message #2. You are to complete Message #3 and submit itto me for approval. You are currently at Step 17 of EPIP-2.01, Notification of State and Local Governments.
  • The WEB EOC program is out of service for software maintenance.
  • Here is a copy of the last message transmitted.
  • When you finish the actions necessary to accomplish this, please inform me.

PERFORMANCE CHECKLIST Notes to the Evaluator

  • Task critical elements are bolded.
  • START TIME (critical time start):

STEP 1: Reviews Step 17 of EPIP-2.O1, and returns to step 3. SAT OR UNSAT Reviews Continuous Actions Page of EPIP-2.O1, Item 1.b 2), Report of Emergency Change Criteria, and returns to Step 3.

STANDARD:

a) Returns to EPIP-2.O1, Step 3.

EVALUATOR NOTES:

A KEY is provided on Pages 12 and 13 of the JPM to assist in responses to Candidate during EPIP-2.O1, Attachment 2, form completion. Bracketed items are Critical Steps.

COMMENTS:

STEP 2: Reviews notes prior to step 3: SAT

  • The initial notification of any emergency classification must be made (meaning UNSAT contact initiated with the first agency) within 15 minutes of declaring the emergency class.
  • Attachment 1, Instructions for Completing Report of Emergency to State and Local Governments, may be referenced as needed.
  • Items 5 through 9 on the Report of Emergency to State and Local Governments are optional for a message reporting initial entry into the Emergency Plan or an emergency class change.

STANDARD:

a) Acknowledges notes.

EVALUATOR NOTES:

  • If asked: Classification remains Site Area Emergency (SAE), FSI .1.

COMMENTS:

STEP 3: SAT Step 3- CHECK EMERGENCY REMAINS IN EFFECT:

- UNSAT STANDARD:

a) Reviews initial conditions or asks Evaluator if emergency remains in effect.

EVALUATOR NOTES:

If asked: Site Area Emergency (SAE), FSI .1 in effect.

COMMENTS:

Step 4: SAT Step 4: RECORD IN FORMATION ON REPORT OF EMERGENCY TO STATE AND UNSAT LOCAL GOVERNMENTS Standard:

a) Candidate obtains a copy of EPIP-2.O1, Attachment 2.

b) Candidate uses Message #2 (provided) as necessary for pertinent information.

c) Candidate uses EPIP-2.O1 as necessary to complete attachment 2.

EVALUATOR NOTES:

If asked: Site Area Emergency (SAE), FSI .1 in effect.

COMMENTS:

, EPIP-2.O1, Page 1 Step 5: Candidate fills out top of form:

U N SAT Standard:

a) Records Message #3 on MESSAGE # line.

b) Selects checkbox TSC.

c) Leaves APPROVAL line, Roll Call checkboxes, and The time is: line, blank.

EVALUATOR NOTES:

Candidate may elect to check the TSC box (step b above) when transmitting the message.

COMMENTS: , EPIP-2.O1, Page 1 SAT Step 6: Candidate completes Item 1. Status UNSAT Standard:

a) Checks Drill Event box.

EVALUATOR NOTES:

None.

COMMENTS:

, EPIP-2.O1, Page 1 SAT Step 7: Candidate completes Item 2. Emergency Classification.

U N SAT Standard:

a) Checks Site Area Emergency box.

b) Checks Category F box.

c) Checks Classification S box.

d) Enters FSI .1 Declared at 0953 on TODAYS DATE.

e) Checks Fission Product Barriers Affected, Reactor Coolant, and Containment boxes.

EVALUATOR NOTES:

a) through c) None d) If asked: What is todays date, answer with current date.

e) If asked: Reactor Coolant and Containment barriers affected.

COMMENTS: , EPIP-2.01, Page 1 SAT Step 8: Candidate completes Item 3. Release of Radioactive Material UNSAT Standard:

a) Checks B. Radiological release in progress. Will transmit Report of Radiological Conditions to Virginia EOC.

EVALUATOR NOTES:

a) If asked: Radiological release in progress.

COMMENTS:

, EPIP-2.01, Page 1 SAT Step 9: Candidate completes item 4. Meteorological Data. UNSAT Standard:

a) Checks Based On On-Site Measurements box.

b) Candidate places time in appropriate blank.

(00 0) c) Candidate Enters 260.2 in AVE Wind Direction From degrees to 360 blank.

d) Candidate enters 13.5 in AVE Wind Speed mph blank.

EVALUATOR NOTES:

Provide candidate with a printout of EMCOMM Page If asked: item a), Time of EMCOMM printout, 1045.

If asked: For Peer Check on Wind direction and Wind Speed, items c) and d),

Acknowledge request for Peer check.

COMMENTS: , EPIP-2.O1, Page 1 SAT Step 10: Candidate acknowledges Note: NOTE: Items 5 9 optional for message reporting

- UNSAT initial Emergency Plan entry or emergency classification change and Excluded from message may be checked. Items 5 9 are excluded from message may be read in lieu of reading each item.

Standard:

a) Candidate determines Note is not applicable.

EVALUATOR NOTES:

None.

COMMENTS:

, EPIP-2.O1, Page 1 SAT Step 11: Candidate completes Item 5. Assistance requested or Being Provided. UNSAT Standard:

a) Candidate Checks None box.

EVALUATOR NOTES:

If asked: No offsite assistance has been requested.

COMMENTS: , EPIP-2.O1, Page 1 SAT Step 12: Candidate completes Item 6. Emergency Response Actions Underway. UNSAT Standard:

a) Candidate Checks Station emergency personnel called in box.

b) Candidate Checks Station monitoring teams dispatched off-site box.

EVALUATOR NOTES:

If asked: Station monitoring teams dispatched off-site, and Station emergency personnel called in.

COMMENTS: , EPIP-2.O1, Page 1 SAT Step 13: Candidate completes Item 7. Evacuation or Company Dismissal of Site Personnel. UNSAT Standard:

a) Candidate Checks No box, or checks Other and fills in Currently Being Evaluated.

b) Critical step only if Candidate Incorrectly Checks Evacuation to Primary Remote Assembly Area, Evacuation to Secondary Remote Assembly Area, or Company Dismissal check box(es).

EVALUATOR NOTES:

If asked: Evacuation or Company Dismissal is currently being evaluated.

COMMENTS:

, EPIP-2.O1, Page 1 SAT Step 14: Candidate completes Item 8. Prognosis of Situation Since Last Report. UNSAT Standard:

a) Candidate Checks Stable box.

EVALUATOR NOTES:

If asked: Situation is Stable.

COMMENTS: , EPIP-2.O1, Page 1 SAT Step 15: Candidate completes Item 9: ADDITIONAL INFORMATION. UNSAT Standard:

a) Candidate enters: Isolation of steam release path to atmosphere expected in 45 minutes.

EVALUATOR NOTES:

If asked: for item 9: Isolation of steam release path to atmosphere expected in 45 minutes.

COMMENTS: , EPIP-2.O1, Page 1 SAT Step 16: Candidate completes Bottom of form UNSAT Standard:

a) Candidate enters NAME on This is (name) line.

b) Candidate checks TSC box.

c) Candidate enters current Date in appropriate blank.

EVALUATOR NOTES:

  • The candidate may elect to complete steps b and c when transmitting the message and not complete at this time.

If asked: Provide Candidate with current Date and Time.

COMMENTS:

, EPIP-2.O1, Page 2 SAT Step 17: Candidate completes Top of form. UNSAT Standard:

a) Candidate enters 3 in Message # line.

b) Candidate checks TSC box.

EVALUATOR NOTES:

Candidate may elect to check the TSC box (step b above) when transmitting the message.

If asked: Provide Candidate with current Date and Time.

COMMENTS: , EPIP-2.01, Page 2 SAT Step 18: Candidate completes Item 10: PROTECTIVE ACTION RECOMMENDATIONS: UNSAT Standard:

a) Candidate checks NONE box EVALUATOR NOTES:

If asked: Item 10, None.

COMMENTS: , EPIP-2.01, Page 2 SAT Step 19: Candidate completes Item 11: SITE ACCESS UNSAT Standard:

a) Candidate checks AVAILABLE box EVALUATOR NOTES:

If asked: Item 11, Site Access is Available.

COMMENTS:

, EPIP-2.O1, Page 2 SAT Step 20: Candidate completes form. UNSAT Standard:

a) Candidate leaves Item 12 blank.

b) Candidate checks TSC box.

c) Candidate enters current Date in appropriate blank.

d) Candidate submits completed form to the Evaluator for Approval.

EVALUATOR NOTES:

Candidate may elect perform steps b & c above when transmitting the message.

Accepts form.

Time Critical: 15 minutes from acceptance of task.

COMMENTS:

JPM Complete STOP TIME:

Notes:

Y REPORT OF EMERGENCY TO STATE AND LOCAL GOVERNMENTS 1<

MESSAGE# [31 APPROVAL:

(Station Emergency Manager or Recovery Manager) a This is Surry Power Station Li Control Room TSC Li LEOF Li CEOF. Standby for roll-call and following emergency message. Use Report of Emergency form to copy message. (Conduct a roll-call and check boxes as each party answers.)

Li Virginia EOC Li Surry County Li Isle of Night County Li James City County Li Williamsburg Li Newport News Li York County The time is: The emergency message is as follows: (READ SLOWLY)

(24-hr time)

Item 1. STATUS: Li Actual Event Li Actual Event terminated at

[F.Jrill Li Drill terminated (24-hr time) (date)

Item 2. EMERGENCY CLASSIFICATION: Li NOUE Li Alert Li Site Area Emergency Li General Emergency Category Classification Li R Li S Li U S J. .J_ Declared at 7?5 3 on TooAy Li H Li C Li A Li G (24-hr time) (date)

Li E LF Fission Product Barriers affected: Li N/A Li Fuel Clad Li Reactor Coolant Li Containment Item 3. RELEASE OF RADIOACTIVE MATERIAL: Routine releases ongoing due to plant operations.

Additional radiological releases associated with the event:

Li A. No radiological release. Will NOT transmit Report of Radiological Conditions to Virginia EOC.

B. Radiological release in progress. Will transmit Report of Radiological Conditions to Virginia EOC.

Li C. Radiological release now terminated. Will transmit Report of Radiological Conditions to Virginia EOC.

LI D. Radiological release projected to occur. Will transmit Report of Radiological Conditions to Virginia EOC.

Item 4. METEOROLOGICAL DATA: Based on: C1JDn-site Measurements Li Off-site Measurements Li Not Available Time: I (24-hr time) 3 AVE Wind Direction from [21.&Z degrees (0° to 30°)

AVE Wind Speed________ mph NOTE: Items 5 9 optional for message reporting initial Emergency Plan entry or emergency classification change and Excluded from message may be checked. Items 5 9 are excluded from messagW may be read in lieu of reading each item.

Item 5. ASSISTANCE REQUESTED OR BEING PROVIDED: Li Excluded from message None

(#) Fire Units from (#) Police Units from

(#) Rescue Units from (#) Other Item 6. EMERGENCY RESPONSE ACTIONS UNDERWAY: Li Excluded from message Li None Station emergency personnel called in E Station monitoring teams dispatched off-site Li Other Item 7. EVACUATION OR COMPANY DISMISSAL OF SITE PERSONNEL: Li Excluded from message No Evacuation to PrImary Remote Assembly Area: Li Planned Li In progress Li Completed Li Released from RA R.AA vacuation to Secondary Remote Assembly Area: Li Planned Li In progress Li Completed Li Released from L ompany Dismissal: Li Planned Li In progress Li Completed Other E c,.,At O Ca 4jJ? s/S5AL c.LsJikj A41t Item 8. PROGNOSIS OF SITUATION SINCE LAST REPORT: Li Excluded from message

( Stable Li Worsening Li Improving Li Other Item S. ADDITIONAL INFORMATION (Do not use abbreviations, mark numbers or acronyms.): Li Excluded from message (cie piL +o A4A.CSLC pio This is (name) DAThE /Emergency Communicator Please acknowledge receipt of this message. (Conduct roll-call and check boxes as each party answers.)

Li Virginia EOC Li Surry County Li Isle of Wight County Li James City County Li Williamsburg Li Newport News Li York County This is Surry Power Station Li Control Room [TSC Li LEOF Li CEOF out at on (24-hr time) (date)

CONTINUED ON REVERSE FOR STATE orrn NO. 73 880(0t 2010)

MESSAGE#______

NOTE:

  • If this is a termination message, the remainder of this report is not transmitted.

Transmit to Virginia EOC only using the VEOC ARD, VEOC autodial or direct dial (804) 674-2400.

This is Surry Power Station El Control Room [TSC [1 LEOF Li CEOF continuing the message.

The time is: (READ SLOWLY)

(24-hr time)

Item 10. PROTECTIVE ACTION RECOMMENDATIONS:

None El Shelter-in-place: Mile radius (360°) and Miles downwind in the following Sectors LI Evacuate: Mile radius (360°) and Miles downwind in the following Sectors El Beyond 10 Mile EPZ:

D Evacuate Area: Centerline (degrees); Distance (Miles); Wdth (feet)

El Shelter-in-place: Centerline (degrees); Distance (Miles); Width (feet)

El Potassium Iodide: Recommend implementation of Potassium Iodide (KI) strategies for the general public.

The projected dose at the site boundary is 5 Rem Thyroid CDE.

Item 11. SITE ACCESS: Available El Not Available Item 12. UPDATE SCHEDULE: El 60 minute; El Other__________________________________________

Name of Virginia EOC Duty Officer.

This is Surry Power Station El Control Room ITSC El LEOF El CEOF out at on (24-hr time) (date)

EVALUATORS REFERENCE COPY Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)

Task

  • Task is to be performed in the simulator or in the classroom.

Directions The evaluator will explain the initial conditions of the task to be performed and will provide the initiating cue. Ensure you indicate to the evaluator when you understand your assigned task.

Initial Conditions:

  • Unit 1 and 2 at 100% power. Unit 1 manually tripped and safety injection actuated due to a Steam Generator Tube Rupture on B SG.
  • When 1-MS-TV-biB closed, 1-MS-RV-IO1B failed to operate causing i-MS-SV-IO1B to lift and subsequently failed to close.

Initiating Cues

  • This is a TIME CRITICAL JPM.
  • I am the SEM and you are the State and Local Communicator. Currently located in the TSC
  • A Site Area Emergency was declared based on FS1 .1 at 0953, today.
  • When B SG MSTV manually closed, B SG PORV failed to operate causing 1-MS-SV-b01 B to lift and subsequently failed to close. A team is currently being briefed to attempt to gag i-MS-SV-1OIB.
  • Forty-Five (45) minutes have elapsed since the start time of Message #2. You are to complete Message #3 and submit it to me for approval. You are currently at Step 17 of EPIP-2.01, Notification of State and Local Governments.
  • The WEB EOC program is out of service for software maintenance.
  • Here is a copy of the last message transmitted.
  • When you finish the actions necessary to accomplish this, please inform me.

Operator Directions Handout (TO BE GIVEN TO APPLICANT)

Initial Conditions:

  • Unit 1 and 2 at 100% power. Unit 1 manually tripped and safety injection actuated due to a Steam Generator Tube Rupture on B SG.
  • When 1-MS-TJ-1 01 B closed, 1 -MS-RV-1 01 B failed to operate causing 1 -MS-SV-1 01 B to lift and fail to close.

Initiating Cues

  • This is a TIME CRITICAL JPM.
  • I am the SEM and you are the State and Local Communicator. Currently located in the TSC
  • A Site Area Emergency was declared based on FSI.1 at 0953, today.
  • When B SG MSTV manually closed, B SG PORV failed to operate causing 1-MS-SV-lOlBto lift and subsequently failed to close. A team is currently being briefed to attempt to gag 1-MS-SV-1O1B.
  • Forty-Five (45) minutes have elapsed since the start time of Message #2. You are to complete Message #3 and submit itto me for approval. You are currently at Step 17 of EPIP-2.01, Notification of State and Local Governments.
  • The WEB EOC program is out of service for software maintenance.
  • Here is a copy of the last message transmitted.
  • When you finish the actions necessary to accomplish this, please inform me.

Surry 2012-301 Classify an Event U .S. Nuclear Regulatory Commission Surry Power Station 5R0830 I Administrative Job Performance Measure G2.4.4 I TIME CRITICAL Applicant________________________________ Start Time___________________

Examiner__________________________________

Date Stop Time____________________

Title Classify an event in accordance with EPIP-1 .01 KIA: G2.4.41 Knowledge of the emergency action level thresholds and classifications. (2.314.1)

Applicability Estimated Time Actual Time SRO(l)/SRO(U) 29 Minutes Conditions

  • Task may be PERFORMED in the simulator or classroom.

Standards

  • Site Area Emergency declared lAW EPIP-1 .01.

Initiating Cues

  • Significant event notification.
  • EPIP-1 .01 Emergency Manager Controlling Procedure.

Terminating Cues

  • Report received of event classification and approval for transmitting EPIP-2.01.

Procedures

  • EPIP-1.01, EMERGENCY MANAGER CONTROLLING PROCEDURE (REV 53)
  • EPIP-2.01, NOTIFICATION OF STATE AND LOCAL GOVERNMENTS (REV 41)
  • EAL Tables (Rev 2)
  • Surry EAL Basis Document (Rev 1)

Safety Considerations

  • None Page 1 of 10

Surry 2012-301 Classify an Event Initial Conditions:

  • This is a TIME CRITICAL JPM.
  • You are the Nuclear Shift Manager. I will act as Emergency Communicators, if required.
  • With both units at 100% power, a fire broke out in the main control room that necessitated control room evacuation (MCR personnel have left the Main Control Room).
  • When the fire in the control room was announced, smoke from the control room fire was observed in the Emergency Switchgear Room; craft personnel in the area responded by dumping Halon in BOTH Unit One and Unit Two Emergency Switchgear Rooms.
  • The Incident Commander has determined that the entire Emergency Switchgear room is uninhabitable until the area can be ventilated. It is estimated that this process will be complete in 25 minutes.
  • You and the Emergency Communicators have re-located to the TSC.

Initiating Cues

  • Review EALs for applicability and review and approve the Notification of State and Local Governments form.
  • On-site weather instruments indicate wind is from the North East (45 degrees) with an average wind speed of 10 mph.

If performed in the classroom, announcing classification (if required) out loud is not required.

Notes Page 2 of 10

Surry 2012-301 Classify an Event PERFORMANCE CHECKLIST Notes to the Evaluator

  • Task critical elements are bolded.
  • START TIME:

EPIP-l .01 SAT STEP 1: REVIEWS CAUTION AND NOTE PRIOR TO STEP 1 OF EPIP-1.O1.

UNSAT Standards a) Reviews the following CAUTION: Declaration of the highest emergency class for which an Emergency Action Level is exceeded shall be made.

b) Reviews the following NOTE: The PCS is potentially unreliable in the event of an earthquake. Therefore, PCS parameters should be evaluated for accuracy should an earthquake occur.

Evaluators Comments Page 3 of 10

Surry 2012-301 Classify an Event EPIP-1.01 STEP 2: Step I. EVALUATE EMERGENCY ACTION LEVELS:

UNSAT Standards a) Determine event category using the applicable Emergency Action Level Matrix:

  • Hot Conditions (RCS > 200 °F) a Cold Conditions (RCS 200 °F)

Turns to EPIP- 1.01, Attachment 1, Page 1, EAL Table Index.

b) Review EAL associated with event category.

Determines event category to be HAZARDS.

c) Use Control Room monitors, PCS, and outside reports to get indications of emergency conditions listed in the EAL Matrix.

Determines event is HS5.1 and classifies the event as a SITE AREA EMERGENCY.

d) Verify EAL - CURRENTLY EXCEEDED e) Initiate a chronological log of events Evaluator Note TIME CRITICAL for JPM ends upon declaration of the Site Area Emergency.

DECLARATION TIME:

Evaluators Corn rnents Page 4 of 10

Surry 2012-301 Classify an Event EPIP-l .01 STEP 3: Step 2. RECORD EAL TAB, TIME EMERGENCY DECLARED AND SMJSEM NAME: UNSAT Standards Completes the table below as shown:

Emergency Classification EAL Time Declared SM /SEM Identifier Name Notification of Unusual Event Alert Site Area Emergency HS 5.1 Enters time Enters Name General Emergency Evaluator Note Evaluators Comments EPIP-l.01 STEP 4: Step 3. ANNOUNCES THE FOLLOWING DECLARATIONS:

UNSAT Standards Announces the following information:

  • Station Emergency Manager position
  • Emergency Classification
  • Time Declared Evaluators Comments Page 5 of 10

Surry 2012-301 Classify an Event EPIP-l.0l SAT STEP 5: Note: Assembly, accountability and/or initiation of facility staffmg may not be desired during certain situations (e.g., security event or condition, severe weather, UNSAT anticipated grid disturbance) or may have already been completed. These activities should be implemented as quickly as achievable given the specific situation.

Step 4. CHECK CONDITIONS ALLOW FOR NORMAL IMPLEMENTATION OF EMERGENCY RESPONSE ACTIONS Standards Determines that plant conditions allow for normal implementation of the emergency response organization Evaluator Note If asked: State that there are no other events in progress that could hinder the activation of the emergency response organization.

Evaluators Comments Page 6 of 10

Surry 2012-301 Classify an Event EPIP-l.0l SAT STEP 6: Step 5. NOTIFY PLANT STAFF OF ALERT OR HIGHER CLASSIFICATION:

UNSAT Standards a) Check classification ALERT OR HIGFIER b) Check if emergency assembly and accountability PREVIOUSLY CONDUCTED Step b) RNO actions: 1) Sound emergency alarm and make announcement on the station Gai-Tronics system as follows:

Site Area Emergency has been declared due to fire in the MCR and inability to establish control from the Aux Shutdown Panel. All emergency response personnel report to your assigned stations. All other personnel report to your Emergency Assembly Area (or words to this effect)

2) RepeatRNO5.b.l.
3) GOTOStep6.

Evaluator Note If asked: As TSC, sound the emergency alarm for 15 seconds.

If asked: Accountability was not previously conducted.

Evaluators Comments Page 7 of 10

Surry 2012-301 Classify an Event EPIP-1.0l STEP 7: Step 6. INITIATE SUPPORTING PROCEDURES:

Standards Reviews the following CAUTION: All further instructions should be continued unless otherwise directed.

a) Determine if a radiological release is in progress:

RNO a) RNO actions: IF radiological release NOT in progress, THEN GO TO Step 6.b.

b) Inform Emergency Communicators of the following:

  • Emergency Classification
  • Emergency Action Level
  • Time of Declaration
  • Radiological release status
  • PARs, if applicable c) Direct Emergency Communicators to initiate the following:
1) EPIP-2.0l, NOTIFICATIONS OF STATE AND LOCAL GOVERNMENTS
2) EPIP-2.02, NOTIFICATION OF NRC Evaluators Cue Provide the previously completed EPIP-2.0 1 to the Candidate.

Evaluator Note Candidate determines that EPIP-2.0 1 is incorrectly filled out. Alert is checked instead of Site Area Emergency and category is checked as 5 instead of H.

Evaluators Comments Page 8 of 10

Surry 2012-301 Classify an Event STEP 8: APPLICANT REPORTS COMPLETION OF TASK.

Standards UNSAT Applicant reports completion of the task.

Evaluators Cue If the Candidate continues in EPIP- 1.01, inform Candidate that this is the end of the JPM.

Evaluators Comments

    • 1PM COMPLETE **

STOP TIME:

Page 9 of 10

Surry 2012-301 Classify an Event Operator Directions Handout (TO BE READ TO CANDIDATE BY EXAMINER)

Task

  • Task may be PERFORMED in the simulator or classroom.

Directions The evaluator will explain the initial conditions of the task to be performed and will provide the initiating cue. Ensure you indicate to the evaluator when you understand your assigned task.

Initial Conditions:

  • This is a TIME CRITICAL JPM.
  • You are the Nuclear Shift Manager. I will act as Emergency Communicators, if required.
  • With both units at 100% power, a fire broke out in the main control room that necessitated control room evacuation (MCR personnel have left the Main Control Room).
  • When the fire in the control room was announced, smoke from the control room fire was observed in the Emergency Switchgear Room; craft personnel in the area responded by dumping Halon in BOTH Unit One and Unit Two Emergency Switchgear Rooms.
  • The Incident Commander has determined that the entire Emergency Switchgear room is uninhabitable until the area can be ventilated. It is estimated that this process will be complete in 25 minutes.
  • You and the Emergency Communicators have re-located to the TSC.

Initiating Cues

  • Review EALs for applicability and review and approve the Notification of State and Local Governments form.
  • On-site weather instruments indicate wind is from the North East (45 degrees) with an average wind speed of 10 mph.
  • If performed in the classroom, announcing classification (if required) out loud is not required.

G2.4.41 SR08301 lOof 11

Operator Directions Handout (TO BE GIVEN TO CANDIDATE)

Initial Conditions:

  • This is a TIME CRITICAL JPM.
  • You are the Nuclear Shift Manager. I will act as Emergency Communicators, if required.
  • With both units at 100% power, a fire broke out in the main control room that necessitated control room evacuation (MCR personnel have left the Main Control Room).
  • When the fire in the control room was announced, smoke from the control room fire was observed in the Emergency Switchgear Room; craft personnel in the area responded by dumping Halon in BOTH Unit One and Unit Two Emergency Switchgear Rooms.
  • The Incident Commander has determined that the entire Emergency Switchgear room is uninhabitable until the area can be ventilated. It is estimated that this process will be complete in 25 minutes.
  • You and the Emergency Communicators have re-located to the TSC.

Initiating Cues

  • Review EALs for applicability and review and approve the Notification of State and Local Governments form.
  • On-site weather instruments indicate wind is from the North East (45 degrees) with an average wind speed of 10 mph.
  • If performed in the classroom, announcing classification (if required) out loud is not required.

REPORT OF EMERGENCY TO STATE AND LOCAL GOVERNMENTS MESSAGE# I APPROVAL:

(Station Emergency Manager or Recovery Manager) following emergency message. Use a This is Surry Power Station Q Control Room 1SC Q LEOF Q CEOF. Standby for roll-call and form to copy message. (Conduct a roll-call and check boxes as each party answers.)

eport of Emergency El Virginia EOC El Surry County Q Isle of Wight County El James City County El Williamsburg El Newport News El York County The time is: The emergency message is as follows: (READ SLOWLY)

(24-hr time)

Item 1. STATUS: Q Actual Event El Actual Event terminated at on Drill Drill terminated (24-hr time) (date)

Item 2. EMERGENCY CLASSIFICATION: El NOUE 1!I Alert Q Site Area Emergency El General Emergency Category Classification El R I S El U gs .5.... J_ Declared at on To (date)

El H El C El A El G (24-hr time)

El E El F Fission Product Barriers affected: N/A El Fuel Clad El Reactor Coolant El Containment Item 3. RELEASE OF RADIOACTIVE MATERIAL: Routine releases ongoing due to plant operations.

Additional radiological releases associated with the event:

A. No radiological release. Will NOT transmit Report of Radiological Conditions to Virginia EOC.

El B. Radiological release in progress. Will transmit Report of Radiological Conditions to Virginia EOC.

EOC.

El C. Radiological release now terminated. Will transmit Report of Radiological Conditions to Virginia Will transmit Report of Radiological Conditions to Virginia EOC.

El D. Radiological release projected to occur.

Item 4. METEOROLOGICAL DATA: Based on: On-site Measurements Q Off-site Measurements El Not Available AVE Wind Direction from IS degrees (00 to 360°)

Time:

(24-hr time)

AVE Wind Speed O mph Items 5 -9 optional for message reporting initial Emergency Plan entry or emergency classification change and Excluded from message may be checked. Items 5 -9 are excluded from message may be read in lieu of reading each item.

Item 5. ASSISTANCE REQUESTED OR BEING PROVIDED: II Excluded from message El None

(#) Fire Units from (#) Police Units from

(#) Rescue Units from (#) Other Item 6. EMERGENCY RESPONSE ACTIONS UNDERWAY: Excluded from message El Station emergency personnel called in El None El Station monitoring teams dispatched off-site El Other IExcluded from message Item 7. EVACUATION OR COMPANY DISMISSAL OF SITE PERSONNEL:

ElNo Q Evacuation to Primary Remote Assembly Area: El Planned El In progress El Completed Q Released from RAA El Evacuation to Secondary Remote Assembly Area: El Planned El In progress El Completed El Released from RAA El Company Dismissal: El Planned El In progress El Completed El Other tExcluded from message Item 8. PROGNOSIS OF SITUATION SINCE LAST REPORT:

Q Stable Q Worsening El Improving El Other Item 9. ADDITIONAL INFORMATION (Do not use abbreviations, mark numbers or acronyms.): VExcluded from message

/Emergency Communicator This is (name) -

Please acknowledge receipt of this message. (Conduct roll-call and check boxes as each party answers.)

El Virginia EOC El Surry County El Isle of Wight County El James City County El williamsburg El Newport News El York County This is Surry Power Station El Control Room 1TSC El LEOF El CEOF out at on (date)

(24-hr time)

CONTINUED ON REVERSE FOR STATE Form No. 730860(Oct 2010)

MESSAGE# I NOTE:

  • If this isa termination message, the remainder of this report is not transmitted.

Transmit to Virginia EOC only using the VEOC ARD, VEOC autodial or direct dial (804) 674-2400.

This is Surry Power Station Q Control Room 1TSC Q LEOF Q CEOF continuing the message.

The time is:

(READ SLOWLY)

(24-hr time)

Item 10. PROTECTIVE ACTION RECOMMENDATIONS:

lNone Q Shelter-in-place: Mile radius (360°) and Miles downwind in the following

,_,ct.u_,I C J Evacuate: Mile radius (360°) and Miles downwind in the following Sectors Q Beyond 10 Mile EPZ:

Width (feet)

Q Evacuate Area: Centerline (degrees); Distance (Miles);

Width (feet) 0 Shelter-in-place: Centerline (degrees); Distance (Miles);

LJ Potassium Iodide: Recommend implementation of Potassium Iodide (KI) strategies for the general public.

The projected dose at the site boundary is 5 Rem Thyroid CDE.

Item 11. SITE ACCESS: AvaiIable Q Not Available Item 12. UPDATE SCHEDULE: 0 60 minute; Q Other_____________________________________________

Name of Virginia EOC Duty Officer:

This is Surry Power Station 0 Control Room TSC 0 LEOF Q CEOF out at____________ on (24-hr time) (date)