MONTHYEARL-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) NG-23-0010, Supplement to Duane Arnold Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-12-0606 December 2023 Supplement to Duane Arnold Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule NG-23-0009, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment NG-23-0006, Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2023-05-23023 May 2023 Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update ML23137A1672023-05-11011 May 2023 Submittal of 2022 Annual Radiological Environmental Operating Report NG-23-0004, 2022 Annual Radioactive Material Release Report2023-04-25025 April 2023 2022 Annual Radioactive Material Release Report NG-23-0003, 2022 Annual Exposure Report - Form 5s2023-04-21021 April 2023 2022 Annual Exposure Report - Form 5s NG-23-0002, 10 CFR 50.59 Report, Commitment Changes, 10 CFR 72.48 Report, Quality Assurance Program Changes, Technical Specification Basis Changes, and Revision of the DAEC Defueled Safety Analysis Report2023-03-27027 March 2023 10 CFR 50.59 Report, Commitment Changes, 10 CFR 72.48 Report, Quality Assurance Program Changes, Technical Specification Basis Changes, and Revision of the DAEC Defueled Safety Analysis Report NG-23-0001, 2023 Annual Decommissioning and Spent Fuel Management Funding Status Report2023-03-27027 March 2023 2023 Annual Decommissioning and Spent Fuel Management Funding Status Report L-2023-029, and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3)2023-03-10010 March 2023 and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML22339A0012022-12-22022 December 2022 Acceptance of Requested Licensing Action Amendment Request for Common Emergency Plan IR 05000331/20220032022-12-13013 December 2022 NRC Inspection Report No. 05000331/2022003 (Drss) ML22285A0072022-10-13013 October 2022 NRC Analysis of NextEra Energy Duane Arnold'S Decommissioning Funding Status Report, Docket No. 50-331 IR 05000331/20220022022-07-13013 July 2022 NRC Inspection Report Nos. 05000331/2022002(DNMS) and 07200032/2022002(DNMS) ML22090A1922022-05-26026 May 2022 Letter to B. Coffey, FPL from M. Doell - Duane Arnold Post Shutdown Activities Report Review Letter ML22132A2872022-05-24024 May 2022 ISFSI DQAP Approval Letter ML22111A0332022-05-20020 May 2022 Operating License Page Correction Letter to B. Coffey, Florida Power and Light, from M. Doell NG-22-0055, Revision to Duane Arnold Energy Center (DAEC) ISFSI-Only Emergency Plan2022-05-20020 May 2022 Revision to Duane Arnold Energy Center (DAEC) ISFSI-Only Emergency Plan ML22089A0492022-05-12012 May 2022 Sfmp Review Letter NG-22-0053, 2021 Annual Radiological Environmental Operating Report2022-05-0606 May 2022 2021 Annual Radiological Environmental Operating Report NG-22-0052, Regulatory Issue Summary 2000-11. NRC Emergency Telecommunications System, Statement of Intent to Implement the Proposed Voluntary Initiative2022-05-0404 May 2022 Regulatory Issue Summary 2000-11. NRC Emergency Telecommunications System, Statement of Intent to Implement the Proposed Voluntary Initiative IR 05000331/20224012022-04-27027 April 2022 Decommissioning Security Inspection Report 05000331/2022401 NG-22-0050, Revised Response to Request for Additional Information Relating to Decommissioning Quality Assurance Program, Revision 02022-04-26026 April 2022 Revised Response to Request for Additional Information Relating to Decommissioning Quality Assurance Program, Revision 0 NG-22-0049, 2021 Annual Radioactive Material Release Report2022-04-26026 April 2022 2021 Annual Radioactive Material Release Report L-2022-068, NextEra Energy Duane Arnold Quality Assurance Topical Report (FPL-3) Revision 22022-04-25025 April 2022 NextEra Energy Duane Arnold Quality Assurance Topical Report (FPL-3) Revision 2 ML22066A7632022-04-25025 April 2022 ISFSI-Only Emergency Plan License Amendment Approval NG-22-0035, Response to Request for Additional Information Relating to Decommissioning Quality Assurance Program. Revision 02022-04-13013 April 2022 Response to Request for Additional Information Relating to Decommissioning Quality Assurance Program. Revision 0 NG-22-0047, Registration of Independent Spent Fuel Installation Storage Cask and Notification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool2022-04-11011 April 2022 Registration of Independent Spent Fuel Installation Storage Cask and Notification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool NG-22-0042, Registration of Independent Spent Fuel Installation Storage Casks2022-04-0808 April 2022 Registration of Independent Spent Fuel Installation Storage Casks NG-22-0041, and Independent Spent Fuel Storage Installation, 2022 Annual Decommissioning and Spent Fuel Management Funding Status Report2022-03-31031 March 2022 and Independent Spent Fuel Storage Installation, 2022 Annual Decommissioning and Spent Fuel Management Funding Status Report NG-22-0031, 2021 Annual Exposure Report - Form 5s2022-03-23023 March 2022 2021 Annual Exposure Report - Form 5s NG-22-0030, Registration of Independent Spent Fuel Installation Storage Casks2022-03-23023 March 2022 Registration of Independent Spent Fuel Installation Storage Casks ML22080A1822022-03-22022 March 2022 Letter to B. Coffey from M. Doell - Duane Arnold ISFSI QAPD RAI Letter L-2022-012, Florida Power & Light Company Nuclear Property Insurance - 10 CFR 50.54(w)(3)2022-03-16016 March 2022 Florida Power & Light Company Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML22059A7462022-03-10010 March 2022 ISFSI-Only Physical Security Plan License Amendment Approval NG-22-0025, Registration of Independent Spent Fuel Installation Storage Casks2022-03-0808 March 2022 Registration of Independent Spent Fuel Installation Storage Casks IR 05000331/20220012022-03-0404 March 2022 Subject: NRC Inspection Report Nos. 05000331/2022001(DNMS) and 07200032/2022001(DNMS) NG-22-0021, Registration of Independent Spent Fuel Installation Storage Casks2022-02-24024 February 2022 Registration of Independent Spent Fuel Installation Storage Casks ML22007A2722022-02-11011 February 2022 Cover Letter - NRC Duane Arnold Exemption Issuance NG-22-0014, Registration of Independent Spent Fuel Installation Storage Casks2022-02-10010 February 2022 Registration of Independent Spent Fuel Installation Storage Casks ML22028A2822022-02-0303 February 2022 Defueled Physical Security Plan License Amendment Approval ML22033A0802022-02-0202 February 2022 Supplement to License Amendment Request (TSCR-188): Proposed Change to the Physical Security Plan for the Post-Shutdown and Permanently Defueled Condition IR 05000331/20210012022-01-25025 January 2022 NRC Inspection Report Nos. 05000331/2021001(DNMS); 07200032/2021001(DNMS); and 07200032/2021002(DNMS) - Duane Arnold Energy Center ML21172A2172022-01-21021 January 2022 Issuance of License Amendment to Adopt ISFSI-Only Technical Specifications NG-22-0009, Registration of Independent Spent Fuel Installation Storage Casks2022-01-20020 January 2022 Registration of Independent Spent Fuel Installation Storage Casks NG-22-0001, Supplement to Exemption Request for Failed Fuel Can Weight in a Certificate of Compliance 1004 Renewed Amendment 17 61BTH Type 2 Dry Shielded Canister2022-01-0606 January 2022 Supplement to Exemption Request for Failed Fuel Can Weight in a Certificate of Compliance 1004 Renewed Amendment 17 61BTH Type 2 Dry Shielded Canister NG-21-0038, Registration of Independent Spent Fuel Installation Storage Casks2021-12-22022 December 2021 Registration of Independent Spent Fuel Installation Storage Casks NG-21-0035, Supplement to Exemption Request for Failed Fuel Can Weight in a Certificate of Compliance 1004 Renewed Amendment 17 61 Bth Type 2 Dry Shielded Canister2021-12-10010 December 2021 Supplement to Exemption Request for Failed Fuel Can Weight in a Certificate of Compliance 1004 Renewed Amendment 17 61 Bth Type 2 Dry Shielded Canister 2024-01-25
[Table view] Category:License-Operator
MONTHYEARIR 05000331/20193012019-06-18018 June 2019 NRC Initial License Examination Report 05000331/2019301 ML22143A9352019-05-16016 May 2019 2019 DAEC Ile ES-201-1 ML22143A9382019-05-16016 May 2019 2019 DAEC Initial License Exam Form ES-201-3 ML22143A9392019-05-16016 May 2019 2019 DAEC Initial License Exam Form ES-301-7 ML22143A9412019-05-16016 May 2019 2019 DAEC Initial License Exam Form ES-401-4 ML22143A9422019-05-16016 May 2019 2019 DAEC Initial License Exam Form ES-401-9 ML22143A9432019-05-16016 May 2019 DAEC 2019 Outline Comments NG-19-0058, 2019 DAEC Addendum to Post Exam Submittal Letter-Comments on Q-70 Clarification2019-04-26026 April 2019 2019 DAEC Addendum to Post Exam Submittal Letter-Comments on Q-70 Clarification NG-19-0057, 2019 DAEC Initial License Examination Post Exam Submittal Letter2019-04-19019 April 2019 2019 DAEC Initial License Examination Post Exam Submittal Letter ML22143A9992019-04-0808 April 2019 2019 DAEC Ile Administered Admin JPMs ML22143B0002019-04-0808 April 2019 2019 DAEC Ile Administered Sim and Inplant JPMs ML22143B0012019-04-0808 April 2019 2019 DAEC Ile Scenarios ML22143B0022019-04-0808 April 2019 2019 Deac Ile Administered Written Exam ML22143B0032019-04-0808 April 2019 RO and SRO Exam Reference Handouts ML19087A3022019-03-28028 March 2019 Operator Licensing Examination Approval (Cdz) ML22144A0672019-02-22022 February 2019 2019 DAEC Ile Proposed RO and SRO Admin JPMs ML22144A0692019-02-22022 February 2019 2019 DAEC Ile Proposed Sim and Inplant JPMs ML22144A0712019-02-22022 February 2019 2019 DAEC Ile Proposed Scenarios ML22144A0732019-02-22022 February 2019 2019 DAEC Ile Proposed Written Exam ML22144A0742019-02-22022 February 2019 2019 DAEC Initial License Exam Form ES-301-3 ML22144A0752019-02-22022 February 2019 2019 DAEC Initial License Exam Form ES-301-4 ML22144A0762019-02-22022 February 2019 2019 Duane Arnold Initial License Exam Form ES-301-6 ML22144A0792019-02-22022 February 2019 2019 DAEC Initial License Exam Form ES-401-6 ML22145A4392019-01-23023 January 2019 2019 DAEC Initial License Examination Submittal Letter ML19009A2502019-01-0808 January 2019 GFE Annual Registration Letter - 2019 Examinations, Region III ML22143B0042018-12-21021 December 2018 2019 DAEC Ile ES-201-2 ML22143B0052018-12-21021 December 2018 2019 Duane Arnold Initial License Exam Forms ES-301-1 ML22143B0062018-12-21021 December 2018 2019 Duane Arnold Initial License Exam Forms ES-301-2 ML22143B0072018-12-21021 December 2018 2019 Duane Arnold Initial License Exam Forms ES-301-5 ML22143B0082018-12-21021 December 2018 2019 Duane Arnold Initial License Exam Forms ES-401-1 and 401-3 ML22143B0092018-12-21021 December 2018 2019 Duane Arnold Initial License Exam Forms ES-D1 ML22143B0102018-11-12012 November 2018 2019 DAEC Ile Outline Submittal Letter NG-18-0089, Preparation and Scheduling of Operator Licensing Examinations (Response to RIS 2018-02)2018-07-25025 July 2018 Preparation and Scheduling of Operator Licensing Examinations (Response to RIS 2018-02) ML18099A2622018-04-0909 April 2018 Gfes Results-March 2018, Duane Arnold Energy Center (Cover Letter Only) ML18086B0662018-03-27027 March 2018 Facility Cover Letter - Riii - March 2018 - GFE ML17361A0302017-12-26026 December 2017 GFE Annual Registration Letter - 2018 Examinations - Region III IR 05000331/20173012017-07-14014 July 2017 NRC Initial License Examination Report 05000331/2017301 (Meb) ML17214A0272017-06-14014 June 2017 Dua 2017 Ile - Proposed Exam ES-401-6 ML17214A0282017-06-14014 June 2017 Dua 2017 Ile - Proposed Exam Admin RO-SRO JPMs ML17214A0342017-06-14014 June 2017 Dua 2017 Ile - Proposed Exam Operating JPMs ML17214A0362017-06-14014 June 2017 Dua 2017 Ile - Proposed Exam Scenarios 1-2-3-Alt ML17214A0382017-06-14014 June 2017 Dua 2017 Ile - Proposed Exam RO Written Examination ML17214A0502017-06-14014 June 2017 Dua 2017 Ile - Proposed Exam SRO Written Examination ML17214A2142017-06-14014 June 2017 Dua 2017 Ile - Administered Exam Scenarios ML17214A2322017-06-14014 June 2017 Dua 2017 Ile - Administered Exam Operating Sim and IP JPMs ML17214A2592017-06-14014 June 2017 Dua 2017 Ile - Administered Exam RO-SRO Admin JPMs ML17214A2952017-06-14014 June 2017 Dua 2017 Ile - Administered Exam RO Written Examination ML17214A3072017-06-14014 June 2017 Dua 2017 Ile - Administered Exam SRO Written Examination ML17214A3502017-06-14014 June 2017 Dua 2017 Ile - Administered Exam Written Examination Handouts ML17214A4012017-06-14014 June 2017 Dua 2017 Ile Administrative Files ES-401-4 2019-06-18
[Table view] Category:Part 55 Examination Related Material
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 October 23, 2012 Mr. Richard L. Anderson Vice President NextEra Energy Duane Arnold, LLC 3277 DAEC Road Palo, IA 52324-9785
SUBJECT:
DUANE ARNOLD ENERGY CENTER CONFIRMATION OF INITIAL LICENSE EXAMINATION
Dear Mr. Anderson:
In a telephone conversation on October 18, 2012, between Mr. Eric Murray, Operations Trainer, and Mr. Bruce Palagi, Chief Examiner, arrangements were made for the administration of licensing examinations at the Duane Arnold Energy Center during the week of April 8, 2013.
In addition, the U.S. Nuclear Regulatory Commission (NRC) will make an examination validation visit to your facility the week of March 18, 2013.
As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 9, Supplement 1, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The NRC=s regional office will discuss with your staff any changes that might be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by November 26, 2012. The written examinations, operating tests, and supporting reference materials identified in Attachment 3 to ES-201 will be due by January 14, 2013.
Pursuant to Title 10 of the Code of Federal Regulations (CFR), Section 55.40(b)(3),
(10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval.
All materials shall be complete and ready to use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.
In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
R. Anderson Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),
and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the OMB approval number 3150-0018. The public reporting burden for this collection is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Thank you for your cooperation in this matter. Mr. Murray has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Bruce Palagi at 630-829-9611, or me at 630-829-9707.
Sincerely,
/RA/ By Bruce Palagi Acting For/
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-331;72-032 License No. DPR-49 cc: Distribution via ListServ'
R. Anderson Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the OMB approval number 3150-0018. The public reporting burden for this collection is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Thank you for your cooperation in this matter. Mr. Murray has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Bruce Palagi at 630-829-9611, or me at 630-829-9707.
Sincerely,
/RA/ By Bruce Palagi Acting For/
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-331;72-032 License No. DPR-49 cc: Distribution via ListServ' DISTRIBUTION:
See next page DOCUMENT NAME: Ltr 102312 Duane Arnold Confirmation of Initial License Exam.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME RBaker for BPalagi:cs BPalagi for HPeterson DATE 10/23/12 10/23/12 OFFICIAL RECORD COPY
Letter to Mr. Richard L. Anderson from Mr. Hironori Peterson dated October 23, 2012.
SUBJECT:
DUANE ARNOLD ENERGY CENTER CONFIRMATION OF INITIAL LICENSE EXAMINATION DISTRIBUTION:
Cayetano Santos RidsNrrDorlLpl3-1 Resource RidsNrrPMDuaneArnold Resource RidsNrrDirsIrib Resource Chuck Casto Cynthia Pederson Steven Orth Jared Heck Allan Barker Christine Lipa Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak John McHale, NRR Janet Kweiser, DRS