Issuance of the Core Operating Limits Report for Reload 19, Cycle 20, Revision 8
ML12291A504
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 10/12/2012
From: Armstrong J
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML12291A504 (1)


Text

Ai Exelon Generation, TS 5.6.5.d October 12, 2012 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington DC 20555-0001 Peach Bottom Atomic Power Station, Unit 2 Renewed Facility Operating License No. DPR-44 NRC Docket No. 50-277

Subject:

Issuance of the Core Operating Limits Report for Reload 19, Cycle 20, Revision 8 Enclosed is a copy of Revision 8 of the Core Operating Limits Report (COLR) for Peach Bottom Atomic Power Station (PBAPS), Unit 2 for Reload 19, Cycle 20. Revision 8 of this report incorporates the revised cycle specific parameters resulting from the new core configuration implemented during the PBAPS, Unit 2 refueling outage.

This COLR is being submitted to the NRC as required by the PBAPS, Unit 2 Technical Specifications (TS)

Section 5.6.5.d. contains information proprietary to Global Nuclear Fuel. Global Nuclear Fuel requests that the document be withheld from public disclosure in accordance with 10 CFR 2.390(a)(4).

An affidavit supporting this request is also contained in Attachment 1. Attachment 2 contains a non-proprietary version of the Global Nuclear Fuel document.

Should you have any questions concerning this letter, please contact Dave Foss at (717) 456-4311.

James M. Armstrong Regulatory Assurance Manager Peach Bottom Atomic Power Station CCN: 12-69 Attachments:

1. Core Operating Limits Report for Reload 19, Cycle 20, Revision 8 (including Affidavit and Proprietary Version)
2.

Core Operating Limits Report for Reload 19, Cycle 20, Revision 8 (Non-Proprietary Version) cc:

Regional Administrator, Region I, USNRC (without attachments)

USNRC Senior Resident Inspector, PBAPS (without attachments)

Project Manager - PBAPS, USNRC (with attachments)

R. R. Janati, Pennsylvania Bureau of Radiation Protection (without attachments)

S. T. Gray, State of Maryland (without attachments)