ML12283A261

From kanterella
Jump to navigation Jump to search
Boiling Water Reactor - Clarification to Safety Evaluation Report Approving ISFSI Physical Security Plan and Lssuing Exemption from Certain Security Requirements of 10 CFR 73.55
ML12283A261
Person / Time
Site: La Crosse  File:Dairyland Power Cooperative icon.png
Issue date: 10/03/2012
From: Egge D
Dairyland Power Cooperative
To: Doug Garner
Document Control Desk, Division of Security Policy, NRC/FSME
References
LAC-14256
Download: ML12283A261 (2)


Text

LA CROSSE BOILING WATER REACTOR (LACBWR)

DAIRYLAND POWER COO PE RATIVE SAFEGUARDS INFORMATION "When separated from enclosures, handle this document as decontrolled" October 3, 2012 In reply, please refer to LAC-14256 DOCKET NO. 50-409 and 72-046 U.S. Nuclear Regulatory Commission ATTN: Douglas Garner Mail Stop T4-F25M 11555 Rockville Pike Rockville, MID 20852

SUBJECT:

Dairyland Power Cooperative (DPC)

La Crosse Boiling Water Reactor (LACBWR)

Possession-Only License No. DPR-45 Clarification to Safety Evaluation Report Approving ISFSI Physical Security Plan and lssuing Exemption from Certain Security Requirements of I0.CFR 73.55, (i)(5)(ii)

REFERENCE:

(1) Letter, NRC to DPC, dated June 20, 2012, "La Crosse Boiling Water Reactor Independent Spent Fuel Storage Installation - Approval of Revised Physical Security Plan and Issuance of Exemption from Certain Security Requirements of 10 CFR 73.55 (TAC No. J00402 and J00403)"

(2) Letter, DPC to NRC, dated June 28, 2012, "Request for Changes to Safety Evaluation report Approving ISFSI Physical Security Plan and Issuing Exemption from Certain Security Requirements of 10 CFR 73.55"

Dear Mr. Garner,

As discussed by telephone conversation on October 2, 2012, LACBWR is sending the attached documentation (Attachment 1) to verify compliance to 73.55 (i)(5)(ii) of the Safety Evaluation Report (SER) related to the ISFSI Physical Security Plan (PSP) approval and issuance of exemptions from certain requirements of 10 CFR 73.55.

If you have any questions, please contact me at 608-689-4207, or Marty Moe at 608-689-4203.

Sincerely,.

~5Se2~Q Donald G. Egge, Plan/ISFSI Manager, LACBWR SAFEGUARDS INFORMATION "When separated from enclosures, handle this documer sdecontrole .

A Touchstone Energy' ooperatnve _,_

S4601 State Highway 35 - Genoa, WI 54632-8846

  • 608-689-2331 ° 608-689-4200 fax
  • www.dairynet.com

SAFEGUARDS INFORMATION "When separated from enclosures, handle this document as decontrolled" Document Control Desk LAC-14256 Page 2 October 3, 2012 DGE/MGM/:jkl Attachment (SGI): (1) Security Control Procedure 15.0, "ISFSI Security Patrols and Surveillance", and Section 3.1, "ISFSI Owner Controlled Area (OCA)", and Section 7.2, "Surveillance", of the ISFSI Security Plan.

Cc: File S-21 W/Attachment File N-I I W/O Attachment SAFEGUARDS INFORMATION "When separated from enclosures, handle this document as decontrolled"