ML12275A202
| ML12275A202 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 09/18/2012 |
| From: | George Gellrich EDF Group, Calvert Cliffs, Constellation Energy Nuclear Group |
| To: | Office of Nuclear Material Safety and Safeguards |
| References | |
| Download: ML12275A202 (2) | |
Text
George H. Gellrich Vice President Calvert Cliffs Nuclear Power Plant, LLC 1650 Calvert Cliffs Parkway Lusby, Maryland 20657 410.495.5200 410.495.3500 Fax CENG a joint venture of
- 0.
caIýste
- -a -eDF Eew d%
I CALVERT CUFFS NUCLEAR POWER PLANT September 18, 2012 U. S. Nuclear.Regulatory Commission Washington, DC 20555 ATTENTION:
SUBJECT:
Document Control Desk Calvert Cliffs Nuclear Power Plant Independent Spent Fuel Storage Installation, Docket No. 72-8 (50-317/50-318)
Undated Safety Analysis Renort. Revision 21 In accordance with the requirements of 10 CFR 72.70, Calvert Cliffs Nuclear Power Plant, LLC hereby submits one copy (CD) of our Calvert Cliffs Independent Spent Fuel Storage Installation Updated Safety Analysis Report, Revision 21.
The List of Effective pages are included. This electronic copy is a complete revision.
Should you have questions regarding this matter, please contact Mr. Douglas E. Lauver at (410) 495-5219.
Very truly yours, CERTIFICATION:
I, George H. Gellrich, certify that I am Vice President-Calvert Cliffs Nuclear Power Plant, LLC, and that the information contained in this submittal accurately presents changes made since the previous submittal, necessary to reflect information and analyses submitted to the Commission or prepared pursuant to Commission requirement.
GHG/BJD/bjd
Document Control Desk September 18, 2012 Page 2
Enclosure:
Updated Safety Analysis Report, Revision 21 (CD) cc:
M. Lombard, NMSS (Without Enclosure)
N. S. Morgan, NRC W. M. Dean, NRC Resident Inspector, NRC S. Gray, DNR C. Haney, NMSS