Category:License-Operator
MONTHYEARML23258A0212023-09-15015 September 2023 Form 5.1-1 Post-Examination Check Sheet (Clinton 2023) IR 05000461/20233012023-09-12012 September 2023 NRC Initial License Examination Report 05000461/2023301 ML23258A0132023-08-24024 August 2023 Form 1.3-1 Examination Security Agreement (Clinton 2023) ML23258A0162023-08-24024 August 2023 Form 2.1-1 Examination Prep Checklist (Clinton 2023) ML23258A0222023-08-0101 August 2023 Licensee Post-Exam Submittal Letter (Clinton 2023) ML23258A0232023-08-0101 August 2023 Post-Exam Comments (None, Clinton 2023) ML23191A8772023-07-11011 July 2023 Operator Licensing Examination Approval Clinton Power Station July 2023 ML23258A0502023-07-0808 July 2023 Form 2.3-1 Examination Outline Quality Checklist (Clinton 2023) ML23258A0522023-07-0808 July 2023 Form 3.4-1 Events and Evolutions Checklist (Clinton 2023) ML23258A0932023-07-0606 July 2023 Form 2.3-2 Operating Test Quality Checklist (Clinton 2023) ML23258A0942023-07-0606 July 2023 Form 2.3-4 Written Examination Quality Checklist (Clinton 2023) RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23258A0952023-04-0606 April 2023 Licensee Exam Submittal Letter (Clinton 2023) ML23258A0562023-02-0606 February 2023 Licensee Outline Submission Letter (Clinton 2023) ML22341A6042022-12-0808 December 2022 Confirmation of Initial License Examination IR 05000461/20223012022-04-13013 April 2022 NRC Initial License Examination Report 05000461/2022301 RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML22157A3782022-01-28028 January 2022 ES-201-3 Pre Exam ML22153A5222022-01-28028 January 2022 ES-301-5 Clinton 2022 ML22157A3772022-01-28028 January 2022 ES-201-3 Post Exam Security Agreement ML22157A3752022-01-28028 January 2022 ES-201-1 Exam Prep Checklist ML22153A5202022-01-28028 January 2022 ES-201-2 Clinton ML22157A3822022-01-28028 January 2022 ES-403-1 Clinton 2022 U-604643, U-604643 ILT Exam Outline - Clinton 20222022-01-28028 January 2022 U-604643 ILT Exam Outline - Clinton 2022 ML22157A3872022-01-28028 January 2022 Post Exam Submittal Letter Clinton 22 ML22153A5172022-01-28028 January 2022 ES-201-2 Clinton 2022 NRC Written Outline Only ML22153A4782022-01-28028 January 2022 ES-301-3 ML22153A4762022-01-28028 January 2022 U-604644 - CPS Submittal of Integrated Initial License Training Examination Materials - 75-Day ML22153A4682022-01-28028 January 2022 ES-301-4 ML22153A4722022-01-28028 January 2022 ES-301-6 ML22010A0992022-01-11011 January 2022 Operator Licensing Examination Approval ML21215A5732021-08-0303 August 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML21174A3062021-06-25025 June 2021 Confirmation of Initial License Examination IR 05000461/20213012021-04-29029 April 2021 NRC Initial License Examination Report 05000461/2021301 ML21144A2312021-04-13013 April 2021 Post Exam Submittal Letter ML21144A2382021-04-13013 April 2021 ES-301-6 ML21144A2582021-04-13013 April 2021 Scenarios ML21144A2232021-04-13013 April 2021 ES-201-1 ML21144A3032021-04-13013 April 2021 Administered RO Written Exam ML21144A2292021-04-13013 April 2021 ES-201-3 ML21144A3222021-04-13013 April 2021 ES-401-3 ML21144A2152021-04-13013 April 2021 ES-401-4 ML21144A3192021-04-13013 April 2021 ES-301-2 ML21144A3232021-04-13013 April 2021 ES-D-1 ML21144A3132021-04-13013 April 2021 Administered SRO Written Exam ML21144A2682021-04-13013 April 2021 SRO Admin JPM 2023-09-15
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML23258A0212023-09-15015 September 2023 Form 5.1-1 Post-Examination Check Sheet (Clinton 2023) IR 05000461/20233012023-09-12012 September 2023 NRC Initial License Examination Report 05000461/2023301 ML23258A0132023-08-24024 August 2023 Form 1.3-1 Examination Security Agreement (Clinton 2023) ML23258A0162023-08-24024 August 2023 Form 2.1-1 Examination Prep Checklist (Clinton 2023) ML23258A0222023-08-0101 August 2023 Licensee Post-Exam Submittal Letter (Clinton 2023) ML23258A0232023-08-0101 August 2023 Post-Exam Comments (None, Clinton 2023) ML23191A8772023-07-11011 July 2023 Operator Licensing Examination Approval Clinton Power Station July 2023 ML23258A0502023-07-0808 July 2023 Form 2.3-1 Examination Outline Quality Checklist (Clinton 2023) ML23258A0522023-07-0808 July 2023 Form 3.4-1 Events and Evolutions Checklist (Clinton 2023) ML23258A0942023-07-0606 July 2023 Form 2.3-4 Written Examination Quality Checklist (Clinton 2023) ML23258A0932023-07-0606 July 2023 Form 2.3-2 Operating Test Quality Checklist (Clinton 2023) RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23258A0952023-04-0606 April 2023 Licensee Exam Submittal Letter (Clinton 2023) ML23258A0562023-02-0606 February 2023 Licensee Outline Submission Letter (Clinton 2023) ML22341A6042022-12-0808 December 2022 Confirmation of Initial License Examination IR 05000461/20223012022-04-13013 April 2022 NRC Initial License Examination Report 05000461/2022301 RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations U-604643, U-604643 ILT Exam Outline - Clinton 20222022-01-28028 January 2022 U-604643 ILT Exam Outline - Clinton 2022 ML22157A3872022-01-28028 January 2022 Post Exam Submittal Letter Clinton 22 ML22153A4722022-01-28028 January 2022 ES-301-6 ML22157A3772022-01-28028 January 2022 ES-201-3 Post Exam Security Agreement ML22153A4782022-01-28028 January 2022 ES-301-3 ML22153A4762022-01-28028 January 2022 U-604644 - CPS Submittal of Integrated Initial License Training Examination Materials - 75-Day ML22157A3782022-01-28028 January 2022 ES-201-3 Pre Exam ML22153A5202022-01-28028 January 2022 ES-201-2 Clinton ML22153A5172022-01-28028 January 2022 ES-201-2 Clinton 2022 NRC Written Outline Only ML22153A5222022-01-28028 January 2022 ES-301-5 Clinton 2022 ML22157A3752022-01-28028 January 2022 ES-201-1 Exam Prep Checklist ML22157A3822022-01-28028 January 2022 ES-403-1 Clinton 2022 ML22153A4682022-01-28028 January 2022 ES-301-4 ML22010A0992022-01-11011 January 2022 Operator Licensing Examination Approval ML21215A5732021-08-0303 August 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML21174A3062021-06-25025 June 2021 Confirmation of Initial License Examination IR 05000461/20213012021-04-29029 April 2021 NRC Initial License Examination Report 05000461/2021301 ML21144A2232021-04-13013 April 2021 ES-201-1 ML21144A2102021-04-13013 April 2021 Ile Outline Review Comments ML21144A3232021-04-13013 April 2021 ES-D-1 ML21144A2302021-04-13013 April 2021 ES-403-1 ML21144A3222021-04-13013 April 2021 ES-401-3 ML21144A3202021-04-13013 April 2021 ES-401-1 ML21144A3192021-04-13013 April 2021 ES-301-2 ML21144A3102021-04-13013 April 2021 Administered Sim JPM ML21145A0332021-04-13013 April 2021 ES-201-2 Written Outline ML21145A0442021-04-13013 April 2021 Operating Test Outline Submittal Letter ML21145A0362021-04-13013 April 2021 ES-201-2 ML21145A0402021-04-13013 April 2021 ES-301-5 2023-09-15
[Table view] |
Text
ILT 10-1 NRC Outline and Operating Test Submittal Comments Clinton Power Station ILT Class 10-01 Exam Date 08/22/2011 Operating Test 2011-301 Chief Examiner Comment Facility Action/Response JPMs JPM 407 Complete a SRV Actuation Report Attachments are part of the JPM itself.
RO Admin Initiating cue to examiner: Provide attached CE agreed when discussed that they would be able to information to applicant or provide information to see this when the JPMs are performed during prep applicant as applicant asks for it. week.
Fill in block 309/311 - appears that an attachment is necessary:
Fill block 309: It appears that the applicant needs to have an attachment (pg 14 of 17) to answer this question. Suggest adding cue to JPM for examiner to provide applicant attachment (pg 14 of 17) when asked.
Fill block 311: Need cue for examiner to provide applicant pictures of plant conditions.
If applicant is given all attachments with initial cue, this may be done in a group setting.
JPM 441 Perform Offsite Source Power Verification Yes. CE agreed when discussed that they would be RO Admin able to see this when the JPMs are performed during This appears too complicated to review in office, need prep week.
to review on site. There appears to be nothing wrong with this ST! Should there be errors?
JPM 442 Print Reading Changed as recommended. Clarified initiating cue to RO/SRO Admin (This can be done with all applicants simultaneously). ensure candidate recognizes action is for a Peer Check.
Added step 4 (SRO ONLY - ITS impact/compensatory 1 of 5
ILT 10-1 NRC Outline and Operating Test Submittal Comments Clinton Power Station ILT Class 10-01 Exam Date 08/22/2011 Operating Test 2011-301 Chief Examiner Comment Facility Action/Response Should have cue to provide applicants with all action).
reference material(?)
Consider having SRO applicants also review associated Technical Specifications associated with this tagout!
On Form ES 301-1, this JPM is listed as a simulator JPM. What in the simulator is needed to perform this JPM?
JPM 450 Authorize an Emergency Dose Changed as recommended.
SRO Admin Change cue to as the acting Station Emergency Director vice as the acting Shift Emergency Director.
JPM 204 Manually Startup RCIC System S1 - RCIC steam supply line leak; not used.
Simulator S2 - RCIC trips if started and will not reset.
Ensure NOT performed during scenarios. S3 - RCIC auto/manual start (logic is operable).
JPM 440 Added missing SAT/UNSAT line on page 9.
Simulator JPM 441 Removed Critical Step designation for Verify Simulator steps 8.1.2.4, 8.2.1.4, 8.3.1.1, 8.3.2.1 and 8.3.3.1. Two critical steps remain.
JPM 447 Clarified initiating cue with regard to retrieval of Simulator computer points. Added comments on pages 8,9, 11 and 12 for same reason.
JPM 448 Added REMA to documents provided to candidate.
2 of 5
ILT 10-1 NRC Outline and Operating Test Submittal Comments Clinton Power Station ILT Class 10-01 Exam Date 08/22/2011 Operating Test 2011-301 Chief Examiner Comment Facility Action/Response Simulator Clarified initiating cue by adding the REMA, field operator availability by phone and that RP has been notified of pending pump shift.
JPM 449 Reset a SCRAM NOT performed during scenarios.
Simulator Ensure NOT performed during scenarios.
Clarified comments on page 9, pointing out that the resetting ARI/RPT is not part of the critical step.
JPM 450 Changed Initiating Cue to say Acting Station Simulator Emergency Director vice Acting Shift Emergency Director at Examiners request. Changed page 8 brief Standard to include cancer risks.
JPM 453 Several changes made to step comments to clarify Simulator what the Examiner should expect. Several changes made to step cues to emphasize NOT. Standards were changed in two steps for Examiner clarification.
JPM 454 New JPM.
Simulator JPM 455 New JPM.
Simulator 3 of 5
ILT 10-1 NRC Outline and Operating Test Submittal Comments Clinton Power Station ILT Class 10-01 Exam Date 08/22/2011 Operating Test 2011-301 Chief Examiner Comment Facility Action/Response JPM 210 Manually Open the LPCS Injection Valve Replaced.
In Plant Too simplistic. Recommend replacing.
JPM 031 Manual Makeup of CCW Expansion Tank Replaced.
In Plant Too simplistic. Recommend replacing.
JPM 026 Added As Found position to comments on pages 8 &
In Plant 9.
Scenarios Scenario 1 D-1 Sheet Review: No TS credit given for Event 4? CPS 2202.04F001 Reactor Operator Instructions For Criticality - changed Expect Xenon to burn out to Event 2: Ensure that enough control rods are Expect Xenon to remain relatively stable and when withdrawn to allow credit for reactivity manipulation criticality is expected to occur (changed between prior to reaching stuck rod. steps 19 and 25 to between steps 4 and 9). Scenario conditions were changed during development but the Event 9: If operators detect a degrading situation, change was omitted in error on this form.
they might manually scram the unit and wont see the auto scram failure. D-2 Form page 13 Simulator Operator Instructions -
changed step 22, rod 20-37 is at 12 to step 05, rod 36-25 is at 00. Scenario conditions were changed during development but the change was omitted in error on this form. Added last statement Select correct screen - SRM/IRM Overlap Display. Ensures conditions are as the candidate would expect.
4 of 5
ILT 10-1 NRC Outline and Operating Test Submittal Comments Clinton Power Station ILT Class 10-01 Exam Date 08/22/2011 Operating Test 2011-301 Chief Examiner Comment Facility Action/Response Scenario 2 D-1 Sheet Review: Is Event 5 an event for ATC or D-2 Form page 2 Event 1 - Added Test Prep switch BOP? operation. Omitted in error.
D-2 Form page 9 Event 7 - Added valve numbers for IA and FC isolation bullets. Omitted in error.
Scenario 3 Event 1: Cue should be to the entire crew that time D-2 Form page 5 Event 4 - Added ARP or to how compression is being used, not just to the BOP. the CB pump is operated. Omitted in error.
Event 5: No TS LCOs associated with tripping of CCW pump? D-2 Form page 9 Event 8 - Added valve numbers for F/D Bypass valve bullets. Omitted in error.
5 of 5