Ameren Services

:; ::: ::: :~:::::::: :::::::: ~::::: ::::::::::::::::: ::::::::: :..: ::::::: ~::::: :.::::::::::::: :::::: ::::::::: ::: ~: ::::::::::::::::::::::::::::: ::::::: ::::;: :;: :::::: :::: :: ::::::::::::::: : ::::::::: ::::::::: :::: ~::: ::::::::.::::::::::::::

April 25, 2012 Ms. Stacy Allen Emission Inventory Unit Chief Department of Natural Resources Air Pollution Control Program P.O. Box 176 Jefferson City, MO 65102-0176 Re: 2011 Emission Inventory Questionnaire

Dear Ms. Allen:

Enclosed are signed copies of EIQ Form 1.0 for fifteen (15) Ameren facilities. Ameren has submitted the EIQs electronically using the MOEIS software. Emissions fees in the amount of $1,459,296.00 have been deposited in the MONA account via electronic funds transfer. Ameren Corporation facilities reported are:

Callaway Plant Labadie Plant Maramec Plant Rush Island Plant Sioux Plant Audrain Combustion Turbine Fairgrounds Combustion Turbine Howard Bend Combustion Turbine Kirksville Combustion Turbine Lakeside Works Headquarters Mexico Combustion Turbine Moberly Combustion Turbine Moreau Combustion Turbine Peno Creek Combustion Turbine Taum Sauk Plant (#0032)

HAPS emissions will be based on the Toxic Release Inventory (TAl) report. The EIQ reports will be revised by the end of July.

Questions concerning the information contained in these reports should be directed to me at 314-554-4908.

Sincerely, Sc::~

Environmental Services T 314.554.4908 F 314.554.4182 swhitworth@ameren.com Ameren SeNices As Affiliated Agent for Umon Electric Company d/b/a Ameren MISSOUn & Ameren Energy Generating Company Enclosures

~ ;~ :; :; ::::::::::: :; :: ~:::~;:::::;::: :::: ~::: ~: :::;: :::: ~: :: :~ ::::::::::; :::::::::: ~: ::::: :::::::::: :i ::::::

1901 Chouteau Avenue

~
;;;;;;;

PO Box 66149, MC 602 Stlouis, MO 63166*6149 Ameren.com

2011 Emission Fee Summary Power Plants Callaway 1080 Labadie 439,360 Meramec 338,056 Rush Island 331,080 Sioux 344,080 Combustion Turbines Audrain 2560 Fairgrounds 120 Howard Bend 0

Kirksville 40 Mexico 200 Moberly 80 Moreau 120 Peno Creek 2440 Lakeside Works Hdqtrs 40 Taum Sauk Plant 40 TOTAL

$1,459,296

bee cover letter only:

D. F. Cole

0. V. Fox MLM/SCW/KJA/DKW AQ5.2.6 0-~lon lett<<S\\2011 Emission Inventory Ouestlonnalre.doc) bee cover letter & facility enclosures:

A. C Heflin (Callaway) 0. L Lomax (CTGs)

T. E. Lafser/(Rush Island)

KP. Blank (Sioux)

D. L. Strubberg (Labadie)

M. W. Utzinger (Maramec)

W. A. Witt (Taum Sauk, Lakeside)

AQ 5.2.1 (Callaway)

AQ 5.2.2 (Howard Bend)

AQ 5.2.2 (CTGs)

AQ 5.2.4 (Labadie)

AQ 5.2.6 (Maramec)

AQ 5.2.7 (Rush Island)

AQ 5.2.8 (Sioux)

AQ 5.2.1 0 (Taum Sauk, Lakeside)

DKW (ALL)

MISSOURI DEPARTMENT OF NATURAL RESOURCES AIR POLLUTION CONTROL PROGRAM EMISSIONS INVENTORY QUESTIONNAIRE, OR EIQ FORM 1.0 GENERAL PLANT INFORMATION D

Request Confidentiality *... Instructions to Initiate the confidentiality request.

I"ACII.IlY-AMEREN MISSOURI CALLAWAY NUCLEAR POWER PLANT MISSOURI HWY CC CITY FULTON ZIP COOl! *4 63166.0000 FIPS COUNTY NO.

027 COUNTY NAME CALLAWAY 573-676-8769 PlANT NO.

0026 YEAR OF Of<TA 2011 POBOX620 PORTLAND MO 65251

  • 0000 I"ACII.IlY CONTACT NAME ADAM HEFLIN FACLITY CONTACT Tm.E SR VICE PRESIDENT ELECTRICITY SIC 4911
  • 91 ZOIII

~-------~~-----------+---------~15N MH~&

45 47 SECOHDS 30.8088 18.7656 AMERENCORP PO BOX 66149 MC-602 CONTACT PERSON IUoME CONTACT PERSON T1TL!

FACLITV CONTACT E.foWL lheftin@am.ren.com 221113 WHEIIE TO SINO EIQ II FUTURE (CH£CIC ONE)

~

Fllltllftt~AddNa D,._~MelnoAc~~~Na NU~OF EMPLOYEES 510.00 UTII COORDINATES EASTIHQ(N) 605259.195 NORTHIIG(Iol)

ACC(M) 4290680.718 15.0 PHONI Nua.IR wtTN AREA CODE EXT.

314-554-4908 CITY STATE SAINT LOUIS MO 0 NA027 D WGS84 IB!NAD83 ZFCOOE*4 63166-0000 STEVE WHITWORTH CONTACT ~E-MQ.

ac:whitworthQameren.eom UNITED STATES TOTAL PLANT EII18810NS FROM FORM 3.0 (TONS PER YEAR)

PMtO 0.59 SOx 50.00 INOl< 20.59 1\\IOC 0.66 1

00 4.11 ll!AO 0.00 0.00 IPM25 0.00 IMH3 The und4nlgned hereby certifies that they have personally examined and are familiar with the information and statements contained herein and further certifies that they believe this Information and statements to be true, accurate and complete. The undersigned certifies that knowingly_ making a false statement or misrepresenting the facts presented In this document Is a violation of state law.

u~t..... w~ Department of Natural Resources

~

Pollution Control Program

~659 E. Elm St.

~fferson City, Mo 65101

~73-751-4817

~.dnr.mo.gov/env/apcplmoeillemlasionsr.porting.htm leiq@dnr.mo.gov MO 711H411 (12-o8)

CHECI</AUTN.NO.

PAYMeNT Df<TE OATE I.OGGEOIIIY 0.00

FORM 1.1 PROCESS FLOW DIAGRAM Fac

  • Name UNION EL&CTaiC - CALLAUAY PLANt County No.

IPianl No.

'Year of Data o62o oo26 I

2o t f Please:use~this :page

  • or.a.separate-sheet.to provide a Process Flow.Oi3gram.per:the* instru~1ions for* onn 1.1 in th Instruction :P.1cket..:oo -nofforget to~nclude all processes* used :in your tacility. Make sure to label each process.:.:

and piece.ohquipment.:and;provide'2n identitic.-tion number:for... H*.-nission*poinl.s (including fugitive--emissions)'

  • d * '***** 11u*,. *c'o t 1: u* -~ *** A<-n... ;. "-r-~~~.... r;J:;..~:.!*"-;.., *.;....;... i:ll.J~~a~~:~:!~:-}.. *; -; ~.. ~... :.'C(."t.1- ~ *.~-o-;~..

- ---~ * ! *.* ~ * ~ *W~~.

an aar-po, 10ft:.

n _UJ _.eq apmen.... ~ '* **. :.'. :,,,

~**
~~~
'?~.'*:'>'>s~.~~ * ;;.":* *

,/~~.. ~.;.it:;..,':;:'.:~~~.: *.;.... ~.:.,, Y.. u:*.i.:r:.,:. *\\*:! ~..,:,..:-,-;

Mak.~s -ure

  • ti>> use th~ame identifieation *number
  • throughout-the<entire :EIQ. 'i * ~ * "* ='~:. :..; ~**: * * ***.~:£:*:.. : * "t'_'*~,.** ~-,,*.~* *.:.... v~

MO 711-1*431 (10/tlJ 0 y0 I

I j !

i

  • i 0

J i

~ !

i i 1

.. : t I *...

j.. *.

i r-- i i *

.:!a *

~......

.... c

~ ~

WJ-i jj c

  • c
1

'i..

0 I

  • if

-~

i.

i -

-~

!~: z i

i. -

I.

i

  • i.

- 1 i i i

u i.

-.. c.. " i

'l..

..

  • t Duplicate this form as needed.

i-I t! ll.

~

i I 1 t.. ;:

i i :

- = ¥ 0

c...

i CD i

a**

.J!'

~

f-i

  • i
  • 0 I

i i ! *. :.-:

  • i !

c *

SUMMARY

OF EMISSION UNITS AND RELATED PROCESSES FIPS COUNTY NO.

PLANT NO.

YEAR OF DATA AMEREN MISSOURI 027 0026 2011 CALLAWAY NUCLEAR POWER PLANT INSTRUCTIONS If all emissions are below the reporting threshold, mark below as "Insignificant", and do not report on Forms 2.0 and 3.0.

If one pollutant exceeds the reporting threshold, mark below as "Active" and report all pollutants on Forms 2.0 and 3.0.

REPORTING THRESHOLD Pollutant PM10 sox NOx voc co CATEGORY1 CATEGORY2 PM2.5 NH3 HAPs HAPs Threshold (lbs.)

876 2,000 2,000 876 2,000 20 200 876 876 Threshold (tons) 0.438 1.0 1.0 0.438 1.0 0.01 0.1 0.438 0.438 EMISSION UNIT NO.

EMISSION UNIT DESCRIPTION OPERATING STATUS (CHOOSE ONE) sec (USE SAME DESCRIPTION ON FORM 2.0)

Active Inactive Dismantled Under Construction Insignificant B-01

[8]

0 0

0 0

AUXILIARY BOILER 10200501 B-02

!RI 0

0 0

0 EMERGENCY DIESEL GENERATOR A 20200402 B-03

!RI 0

0 0

0 EMERGENCY DIESEL GENERATOR B 20200402 B-04

!RI 0

0 0

0 SECURITY EMERGENCY GENERATOR 20200402 B-05

!RI 0

0 0

0 TSC EMERGENCY GENERATOR 20200402 B-06

!RI 0

0 0

0 EOF EMERGENCY GENERATOR 20200402 B-07

!RI 0

0 0

0 FIRE PROTECTION DIESEL GENERATORS (2) 20200402 B-10

!RI 0

0 0

0 PORTABLE DIESEL GENERATOR 20200402 B-12

!RI 0

0 0

0 4 Permanent Diesel Generators 20200402 B-13

!RI 0

0 0

0 5 Temporary Diesel Generators 20200402 Only emission units marked "Active" on this page will have their associated Form 2.0 and worksheet information displayed in this PDF document.

MO 780-1620 (12-09)

MISSOURI DEPARTMENT OF NATURAL RESOURCES AIR POLLUTION CONTROL PROGRAM EMISSIONS INVENTORY QUESTIONNAIRE, OR EIQ FORM 2.0 EMISSION UNIT INFORMATION FACILITY NAME FIPS COUNTY NO.

AMEREN MISSOURI 027 CALLAWAY NUCLEAR POWER PLANT

1. EMISSION UNIT IDENTIFICATION EMISSION UNIT NO. I EMISSION UNIT DESCRIPTION B-01 AUXILIARY BOILER
2. EMISSION PROCESS DETAIL SEG. NO.

I SOURCE CLASSIFICATION CODE (SCC)

SCC DESCRIPTION 1

10200501 PLANT NO.

YEAR OF DATA 0026 2011 Grades 1 and 2 Oil DO THE EMISSIONS FROM THIS EMISSION UNIT FLOW THROUGH A STACK OR VENT?

[8] Yes O

No IF YES, COMPLETE FORM 2.0S STACKNENT INFORMATION ARE THE EMISSIONS FROM THIS UNIT FUGITIVE?

DYes

[8] No IF FUGITIVE, WHAT PERCENTAGE?

3. OPERATING RATE/SCHEDULE
4. ANNUAL FUEL CHARACTERISTICS ANNUAL THROUGHPUT UNITS DEC-FEB (%)

For coal or fuel oil, list details below 41.00 312.02 1 000 GALLONS MAR-MAY(%)

Heat Content (BTU/Fuel Unit) 2.00 137,000,000.00 HOURS/DAY DAYS/WEEK WEEKS/YEAR TOTAL HOURS/YEAR JUN-AUG (%)

ASH% (INCLUDE IN EF) 3.00 0.00 24.00 7.00 52 8,736.00 SEPT-NOV(%)

SULFUR % (INCLUDE IN EF) 54.00 0.04

5. EMISSION CALCULATIONS AIR
1.
2.
3.
4.
5.

Annual Throughput POLLUTANT SOURCE OF EMISSION EMISSION OVERALL ACTUAL x Emission Factor EMISSION FACTOR FACTOR(EF)

CONTROL EMISSIONS (1-0verall Control Eff/1 00)

FACTOR CONTROL EFFICIENCY (TONS/YR)

X STATUS

(%FORMAT)

+ 2000

=Actual Emissions (tons)

Instructions:

Choose from the l bs./unit of throughput If EF includes control Combination of all If controlled, include List Other Worksheets or Source of Emission mark"C",

capture and Form 2.0C Control AP-42/0ther Reference Factor list otherwise "U" destruction Device Listing at lower right efficiencies PM10 FIL

  • 4F 1.0000 No Control 0.00 0.16 SOURCE OF EMISSION FACTOR LIST SOx 4F 6.2480 No Control 0.00 0.97
1. CEM Include documentation
2. Stack Test Include documentation NOx 4F 20.0000 No Control 0.00 3.12
3. Mass Balance Include documentation
4. AP-42 Include reference voc 4F 0.2000 No Control 0.00 0.03 4F. FIRE or webFIRE
5. Other Include documentation co 4F 5.0000 No Control 0.00 0.78 EC. Engr Calc Include documentation LS. Landfill Spdsht Include documentation LEAD TK. TANKS Program Supply TANKS output 2.3. VOC Mass Bal Complete Form 2.3 HAPs 2T 0.0000 No Control 0.00 0.00 2.4. Liquid Loading Complete Form 2.4 2.7. Haul Road Complete Form 2.7 PM2.5 FIL
  • 2.8. Storage Pile Complete Form 2.8 2.T. HAP Worksheet Complete Form 2.T NH3 2.9. Stack Test/GEM Complete Form 2.9 2.0L. Landfill Complete Form 2.0L PM CON*
  • If PM CON is reported, PM10 and PM25 entries above are required and should represent only the filterable PM1 0 and filterable PM25.

MO 780-1621 (05-10)

~

MISSOURI DEPARTMENT OF NATURAL RESOURCES AIR POLLUTION CONTROL PROGRAM EMISSIONS INVENTORY QUESTIONNAIRE, OR EIQ FORM 2.T HAZARDOUS AIR POLLUTANT WORKSHEET FACILITY NAME iAMEREN MISSOURI EMISSION UNIT NO.

B-01 FIPS COUNTY NO.

PLANT NO.

EAR OF DATA 027 0026 2011 SOURCE CLASSIFICATION CODE (SCC)

EG. NO.

10200501 1

Use this form to report any Hazardous Air Pollutant, or HAP, which is emitted in any amount greater than the chemical reporting levels per each emission unit. The instructions for this form provide a list of the HAPs regulated under the Clean Air Act. The amount emitted (Column 4) should be reported before control equipment reductions are applied. Provide documentation (other worksheets, etc.) if the amount in Column 3 does not equal the amount in Column 4. The HAP reporting levels per emission unit are as follows: Category 1 HAPs -sum of 20 pounds per year; All other HAPs-sum of 200 pounds per year.

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.

HAP CHEMICAL CAS NUMBER AMOUNT USED OR UNCONTROLLED UNCONTROLLED UNCONTROLLED EMISSIONS HAP CONTROL DEVICE(S)

CONTROL CONTROLLED EMISSIONS CONTROLLED EMISSIONS HANDLED (LBS.IYR.)

AMOUNT EMITIED EMISSIONS REPORTED REPORTED AS HAPs (LBS./YR.)

EFFICIENCY(%)

REPORTED AS VOC OR REPORTED AS HAPs (LBS./YR.)

AS VOC OR PM10 PM10 (LBS./YR.)

(LBS./YR.)

(LBS.IYR.)

SUM (LBS./YR.

SUM (LBS./YR.

SUM (LBS.IYR.

SUM (LBS./YR.)

HAP Emission Totals =

0.00 0.00 0.00 0.00 Sum of uncontrolled emissions reported as HAPs

11. HA P EM ISSIO N FACT OR Uncontrolled HAP Emission Factor=

(Column 6 Totai)/Annual Throughput (Form 2.0) 0.0 Enter the HAP emission factor for all chemicals that are not reported as VOCs or PM1 0 from Block 11 above as the HAP Emission Factor in Section 5 on Form 2.0.

MO 780-1448 (12-09)

MISSOURI DEPARTMENT OF NATURAL RESOURCES AIR POLLUTION CONTROL PROGRAM EMISSIONS INVENTORY QUESTIONNAIRE, OR EIQ FORM 2.1 FUEL COMBUSTION WORKSHEET FACILITY NAME FIPS COUNTY NO.

PLANT NO.

AMEREN MISSOURI 027 0026 CALLAWAY NUCLEAR POWER PLANT EMISSION UNIT NO.

SOURCE CLASSIFICATION CODE (SCC)

B-01 10200501

1. COMBUSTION EQUIPMENT INFORMATION COAL FIRING YEAR COAL FIRING EQUIPMENT DESCRIPTION PUT IN CODE NO.

CODE LIST SERVICE (CODE LIST AT LEFT)

1. TANGENTIAL AUXILIARY BOILER 09/04/1984 COMBUSTION ENGINEERING TYPE 18-A-13
2. OPPOSED
3. FRONT
4. DRY/WET BOTIOM OTHER (SPECIFY)

Sum of total maximum hourly design rates COMBUSTION EQUIPMENT USE (CHECK ONE)

YEAR OF DATA 2011 SEG. NO.

1 MAXIMUM DESIGN RATE (MILLION BTU/HR.)

123.000000 123.0000 D Electric power generation

~

Industrial use D Commercial/Institutional D Space heating D Other (specify):

COMBUSTION EQUIPMENT CATEGORY-COAL USE ONLY (CHECK ONE)

D Pulverized coal D Pulverized coal dry bottom D Pulverized coal wet bottom Ocyclone D Fluidized bed D Spreader stoker D Overfeed stoker D Underfeed stoker 0Hand fired D Other (specify):

2. FUEL INFORMATION (CHECK ONLY ONE)

LIQUID FUELS GASEOUS FUELS SOLID FUELS OTHER OEthanol D Blast oven gas D Anthracite Coal D Other (specify):

~Fuel oil1-4 (distillate)

D Coke oven gas D Bagasse D Fuel oil 5-6 (residual)

D Liquid propane gas (LPG)

OBark OGasoline D Natural gas D Bituminous coal D Kerosene ocoke OLignite D Subbituminous coal owood

3. CALCULATION OF MAXIMUM HOURLY DESIGN RATE TOTAL HEAT CONTENT MAXIMUM HOURLY DESIGN RATE Maximum Design Rate (mmbtu/hr.) X 1.000,000 (btu/mmbtu)

(BTU/FUEL UNIT)

(FUEL UNIT/HR.)

=

Heat Content (btu/fuel unit) 137,000,000.000000 0.89781 MO 780.1 436 (12*09)

MISSOURI DEPARTMENT OF NATURAL RESOURCES AIR POLLUTION CONTROL PROGRAM EMISSIONS INVENTORY QUESTIONNAIRE, OR EIQ FORM 2.0 EMISSION UNIT INFORMATION FACILITY NAME FIPS COUNTY NO.

AMEREN MISSOURI 027 CALLAWAY NUCLEAR POWER PLANT

1. EMISSION UNIT IDENTIFICATION PLANT NO.

YEAR OF DATA 0026 2011 EMISSION UNIT NO. I EMISSION UNIT DESCRIPTION B-02 EMERGENCY DIESEL GENERATOR A

2. EMISSION PROCESS DETAIL SEG. NO.

I SOURCE CLASSIFICATION CODE (SCC)

SCC DESCRIPTION 1

20200402 Dual Fuel ( O il/Gas)

DO THE EMISSIONS FROM THIS EMISSION UNIT FLOW THROUGH A STACK OR VENT?

[8] Yes D

No IF YES, COMPLETE FORM 2.0S STACK/VENT INFORMATION ARE THE EMISSIONS FROM THIS UNIT FUGITIVE?

DYes

[8] No IF FUGITIVE, WHAT PERCENTAGE?

3. OPERATING RATE/SCHEDULE
4. ANNUAL FUEL CHARACTERISTICS ANNUAL THROUGHPUT UNITS DEC-FEB (%)

For coal or fuel o il, list details below 13.00 460.10 1000 MAR-MAY(%)

Heat Content (BTU/Fuel Unit)

HORSEPOWER-HOURS 14.00 137,000,000.00 HOURS/DAY DAYS/WEEK WEEKS/YEAR TOTAL HOURS/YEAR JUN-AUG (%)

ASH% (INCLUDE IN EF) 9.00 0.00 24.00 7.00 52 8,736.00 SEPT-NOV(%)

SULFUR % (INCLUDE IN EF) 64.00 0.00

5. EMISSION CALCULATIONS AIR
1.
2.
3.
4.
5.

Annual Throughput POLLUTANT SOURCE OF EMISSION EMISSION OVERALL ACTUAL X Emission Factor EMISSION FACTOR FACTOR(EF)

CONTROL EMISSIONS (1-0verall Control Eff/1 00)

FACTOR CONTROL EFFICIENCY (TONS/YR)

X STATUS

(%FORMAT)

+ 2000

=Actual Emissions (tons)

Instructions:

Choose from the LbsJunit of throughput If EF includes control Combination of all If controlled, include List Other Worksheets or Source of Emission mark *C,

capture and Form 2.0C Control AP-42/0ther Reference Factor list otherwise "U" destruction Device Listing at lower right efficiencies PM10 FIL

  • 4F 0.7000 No Control 0.00 0.16 SOURCE OF EMISSION FACTOR LIST SOx 4 F 8.0900 No Control 0.00 1.86
1. CEM Include documentation
2. Stack Test Include documentation NOx 4F 24.0000 No Control 0.00 5.52 3. Mass Balance Include documentation 4. AP-42 Include reference voc 4F 0.7100 No Control 0.00 0.16 4F. FIRE or webFIRE
5. Other Include documentation co 4F 5.5000 No Control 0.00 1.27 EC. Engr Calc Include documentation LS. Landfill Spdsht Include documentation LEAD TK. TANKS Program Supply TAN KS output 2.3. VOC Mass Bal Complete Form 2.3 HAPs 2.4. Liquid Loading Complete Form 2.4 2.7. Haul Road Complete Form 2.7 PM2.5 FIL
  • 2.8. Storage Pile Complete Form 2.8 2.T. HAP Worksheet Complete Form 2.T NH3 2.9. Stack Test/CEM Complete Form 2.9 2.0L. Landfill Complete Form 2.0L PM CON*
  • If PM CON is reported, PM10 and PM25 entries above are required and should represent only the filterable PM10 and filterable PM25.

MO 780-1621 (05-10)

MISSOURI DEPARTMENT OF NATURAL RESOURCES AIR POLLUTION CONTROL PROGRAM EMISSIONS INVENTORY QUESTIONNAIRE, OR EIQ FORM 2.1 FUEL COMBUSTION WORKSHEET FACILITY NAME FIPS COUNTY NO.

PLANT NO.

AMEREN MISSOURI 027 0026 CALLAWAY NUCLEAR POWER PLANT EMISSION UNIT NO.

SOURCE CLASSIFICATION CODE (SCC) 8-02 20200402

1. COMBUSTION EQUIPMENT INFORMATION COAL FIRING YEAR COAL FIRING EQUIPMENT DESCRIPTION PUT IN CODE NO.

CODE LIST SERVICE (CODE LIST AT LEFT)

1. TANGENTIAL EMERGENCY DIESEL GENERATOR A 09/04/1984 8600 HP COLT INDUSTRIES MODEL PC 2.5
2. OPPOSED
3. FRONT
4. DRY/WET BOTIOM OTHER (SPECIFY)

YEAR OF DATA 2011 SEG. NO.

1 MAXIMUM DESIGN RATE (MILLION BTU/HR.)

58.000000 Sum of total maximum hourly design rates 58.0000 COMBUSTION EQUIPMENT USE (CHECK ONE)

D Electric power generation

~

Industrial use D Commercial/Institutional D Space heating D Other (specify):

COMBUSTION EQUIPMENT CATEGORY-COAL USE ONLY (CHECK ONE)

D Pulverized coal D Pulverized coal dry bottom D Pulverized coal wet bottom Ocyclone D Fluidized bed 0

Spreader stoker 0

Overfeed stoker 0

Underfeed stoker 0Hand fired 0

Other (specify):

2. FUEL INFORMATION (CHECK ONLY ONE)

LIQUID FUELS GASEOUS FUELS SOLID FUELS OTHER OEthanol D Blast oven gas D Anthracite Coal D Other (specify):

~Fuel oil1-4 (distillate)

D Coke oven gas 0Bagasse D Fuel oil 5-6 (residual}

D Liquid propane gas (LPG) 0Bark OGasoline O Natural gas 0

Bituminous coal OKerosene ocoke D Lignite D Subbituminous coal owood

3. CALCULATION OF MAXIMUM HOURLY DESIGN RATE TOTAL HEAT CONTENT MAXIMUM HOURLY DESIGN RATE Maximum Design Rate (mmbtu/hr.) X 1,000,000 (btu/mmbtu)

(BTU/FUEL UNIT)

(FUEL UNIT/HR.)

=

Heat Content (btu/fuel unit) 137,000,000.000000 0.42336 MO 780-1436 (12*09)

MISSOURI DEPARTMENT OF NATURAL RESOURCES AIR POLLUTION CONTROL PROGRAM EMISSIONS INVENTORY QUESiiONNAIRE, OR EIQ FORM 2.0 EMISSION UNIT INFORMATION FACILITY NAME FIPS COUNTY NO.

AMEREN MISSOURI 027 CALLAWAY NUCLEAR POWER PLANT

1. EMISSION UNIT IDENTIFICATION EMISSION UNIT NO.

PLANT NO.

YEAR OF DATA 0026 2011 B-03 I

EMISSION UNIT DESCRIPTION EMERGENCY DIESEL GENERATOR B

2. EMISSION PROCESS DETAIL SEG. NO.

I SOURCE CLASSIFICATION CODE (SCC)

SCC DESCRIPTION 1

20200402 Dual Fuel (Oil/Gas)

DO THE EMISSIONS FROM THIS EMISSION UNIT FLOW THROUGH A STACK OR VENT?

[8J Yes O

No IF YES, COMPLETE FORM 2.0S STACKNENT INFORMATION ARE THE EMISSIONS FROM THIS UNIT FUGITIVE?

DYes

[8J No IF FUGITIVE, WHAT PERCENTAGE?

3. OPERATING RATE/SCHEDULE
4. ANNUAL FUEL CHARACTERISTICS ANNUAL THROUGHPUT UNITS DEC-FEB (%)

For coal or fuel oil, list details below 9.00 522.02 1000 MAR*MAY(%)

Heat Content (BTU/Fuel Unit)

HORSEPOWER-HOURS 9.00 137,000,000.00 HOURS/DAY DAYS/WEEK WEEKS/YEAR TOTAL HOURS/YEAR JUN-AUG (%)

ASH % (INCLUDE IN EF) 11.00 0.00 24.00 7.00 52 8,736.00 SEPT-NOV (%)

SULFUR % (INCLUDE IN EF) 71.00 0.00

5. EMISSION CALCULATIONS AIR
1.
2.
3.
4.
5.

Annual Throughput POLLUTANT SOURCE OF EMISSION EMISSION OVERALL ACTUAL X Emission Factor EMISSION FACTOR FACTOR(EF)

CONTROL EMISSIONS (1-0verall Control Eff/1 00)

FACTOR CONTROL EFFICIENCY (TONS/YR)

X STATUS

(%FORMAT)

+ 2000

=Actual Emissions (tons)

Instructions:

Choose from the LbsJunit of throughput If EF includes control Combination of all If controlled, indude list Other Worksheets or Source of Emission mark"c*,

capture and Form 2.0C Control AP-42/0ther Reference Factor list otheiWise "U" destruction Device Listing at lower right efficiencies PM10 FIL

  • 4F 0.7000 No Control 0.00 0.18 SOURCE OF EMISSION FACTOR LIST SOx 4F 8.0900 No Control 0.00 2.11
1. CEM Incl ude documentation
2. Stack Test Include documentation NOx 4F 24.0000 No Control 0.00 6.26
3. Mass Balance Include documentation
4. AP-42 Include reference voc 4F 0.7100 No Control 0.00 0.19 4F. FIRE or webFIRE
5. Other Include documentation co 4F 5.5000 No Control 0.00 1.44 EC. Engr Calc Include documentation LS. Landfill Spdsht Include documentation LEAD TK. TANKS Program Supply TANKS output 2.3. VOC Mass Bal Complete Fonn 2.3 HAPs 2.4. Liquid Loading Complete Fonn 2.4 2.7. Haul Road Complete Fonn 2.7 PM2.5 FIL
  • 2.8. Storage Pile Complete Fonn 2.8 2.T. HAP Worksheet Complete Fonn 2.T NH3 2.9. Stack Test/GEM Complete Fonn 2.9 2.0L. Landfill Complete Fonn 2.0L PM CON*

"If PM CON is reported, PM10 and PM25 entries above are required and should represent only the filterable PM1 0 and filterable PM25.

MO 780-1621 (05-10)

MISSOURI DEPARTMENT OF NATURAL RESOURCES AIR POLLUTION CONTROL PROGRAM EMISSIONS INVENTORY QUESTIONNAIRE, OR EIQ FORM 2.1 FUEL COMBUSTION WORKSHEET FACILITY NAME FIPS COUNTY NO.

PLANT NO.

AMEREN MISSOURI 027 0026 CALLAWAY NUCLEAR POWER PLANT EMISSION UNIT NO.

SOURCE CLASSIFICATION CODE (SCC)

B-03 20200402

1. COMBUSTION EQUIPMENT INFORMATION COAL FIRING YEAR COAL FIRING EQUIPMENT DESCRIPTION PUT IN CODE NO.

CODE LIST SERVICE (CODE LIST AT LEFT)

1. TANGENTIAL EMERGENCY DIESEL GENERATOR B 09/04/1984 8600 HP COLT INDUSTRIES MODEL PC 2.5
2. OPPOSED
3. FRONT
4. DRY/WET BOTTOM OTHER (SPECIFY)

Sum of total maximum hourly design rates COMBUSTION EQUIPMENT USE (CHECK ONE)

YEAR OF DATA 2011 SEG. NO.

1 MAXIMUM DESIGN RATE (MILLION BTU/HR.)

58.000000 58.0000 D Electric power generation

~

Industrial use D Commercial/Institutional D Space heating D Other (specify):

COMBUSTION EQUIPMENT CATEGORY-COAL USE ONLY (CHECK ONE)

D Pulverized coal D Pulverized coal dry bottom D Pulverized coal wet bottom Ocyclone D Fluidized bed D Spreader stoker D Overfeed stoker D Underfeed stoker 0Hand fired D Other (specify):

2. FUEL INFORMATION (CHECK ONLY ONE)

LIQUID FUELS GASEOUS FUELS SOLID FUELS OTHER OEthanol D Blast oven gas D Anthracite Coal D Other (specify):

~Fuel oil 1-4 (distillate)

D Coke oven gas OBagasse D Fuel oil 5-6 (residual)

D Liquid propane gas (LPG)

OBark OGasoline D Natural gas D Bituminous coal D Kerosene ocoke D Lignite D Subbituminous coal owood

3. CALCULATION OF MAXIMUM HOURLY DESIGN RATE TOTAL HEAT CONTENT MAXIMUM HOURLY DESIGN RATE Maximum Design Rate (mmbtu/hr.) X 1,000,000 (btu/mmbtu)

(BTU/FUEL UNIT)

(FUEL UNIT/HR.)

=

Heat Content (btu/fuel unit) 137,000,000.000000 0.42336 MO 780.1436 (1 2*09)

MISSOURI DEPARTMENT OF NATURAL RESOURCES AIR POLLUTION CONTROL PROGRAM EMISSIONS INVENTORY QUESTIONNAIRE, OR EIQ FORM 2.0 EMISSION UNIT INFORMATION FACILITY NAME FIPS COUNTY NO.

AMEREN MISSOURI 027 CALLAWAY NUCLEAR POWER PLANT

1. EMISSION UNIT IDENTIFICATION PLANT NO.

YEAR OF DATA 0026 2011 EMISSION UNIT NO. I EMISSION UNIT DESCRIPTION B-04 SECURITY EMERGENCY GENERATOR

2. EMISSION PROCESS DETAIL SEG. NO.

I SOURCE CLASSIFICATION CODE (SCC)

SCC DESCRIPTION 1

20200402 Dual Fuel (Oil/Gas)

DO THE EMISSIONS FROM THIS EMISSION UNIT FLOW THROUGH A STACK OR VENT?

(8J Yes O

No IF YES, COMPLETE FORM 2.0S STACKNENT INFORMATION ARE THE EMISSIONS FROM THIS UNIT FUGITIVE?

D Yes

[8J No IF FUGITIVE, WHAT PERCENTAGE?

3. OPERATING RATE/SCHEDULE
4. ANNUAL FUEL CHARACTERISTICS ANNUAL THROUGHPUT UNITS DEC-FEB (%)

For coal or fuel oil, list details below 15.00 3.93 1000 MAR*MAY(%)

Heat Content (BTU/Fuel Unit)

HORSEPOWER-HOURS 28.00 137,000,000.00 HOURS/DAY DAYS/WEEK WEEKS/YEAR TOTAL HOURS/YEAR JUN*AUG (%)

ASH% (INCLUDE IN EF) 31.00 0.00 24.00 7.00 52 8,736.00 SEPT-NOV(%)

SULFUR % (INCLUDE IN EF) 26.00 0.00

5. EMISSION CALCULATIONS AIR
1.
2.
3.
4.
5.

Annual Throughput POLLUTANT SOURCE OF EMISSION EMISSION OVERALL ACTUAL X Emission Factor EMISSION FACTOR FACTOR(EF)

CONTROL EMISSIONS (1-0verall Control Eff/1 00)

FACTOR CONTROL EFFICIENCY (TONS/YR)

X STATUS

(%FORMAT)

+ 2000

=Actual Emissions (tons)

Instructions:

Choose from the LbsJunit of throughput If EF includes control Combination of all If controlled, indude List Other Worksheets or Source of Emission mark "C",

capture and Form 2.0C Control AP-42/0ther Reference Factor list otherwise "U" destruction Device Listing at lower right efficiencies PM10 FIL

  • 4F 0.7000 No Control 0.00 0.00 SOURCE OF EMISSION FACTOR LIST SOx 4F 8.0900 No Control 0.00 0.02
1. GEM Include documentation
2. Stack Test Include documentation NOx 4F 24.0000 No Control 0.00 0.05
3. Mass Balance Include documentation
4. AP-42 Include reference voc 4F 0.7100 No Control 0.00 0.00 4F. FIRE or webFIRE
5. Other Include documentation co 4F 5.5000 No Control 0.00 0.01 EC. Engr Calc Include documentation LS. Landfill Spdsht Include documentation LEAD TK. TANKS Program Supply TANKS output 2.3. VOC Mass Bal Complete Form 2.3 HAPs 2.4. Liquid Loading Complete Form 2.4 2.7. Haul Road Complete Form 2.7 PM2.5 FIL
  • 2.8. Storage Pile Complete Form 2.8 2.T. HAP Worksheet Complete Form 2.T NH3 2.9. Stack Test!CEM Complete Form 2.9 2.0L. Landfill Complete Form 2.0L PM CON*
  • If PM CON is reported, PM10 and PM25 entries above are required and should represent only the filterable PM1 0 and filterable PM25.

MO 78().1621 (05-10)

MISSOURI DEPARTMENT OF NATURAL RESOURCES AIR POLLUTION CONTROL PROGRAM EMISSIONS INVENTORY QUESTIONNAIRE, OR EIQ FORM 2.1 FUEL COMBUSTION WORKSHEET FACILITY NAME FIPS COUNTY NO.

PLANT NO.

AMEREN MISSOURI 027 0026 CALLAWAY NUCLEAR POWER PLANT EMISSION UNIT NO.

SOURCE CLASSIFICATION CODE (SCC)

B-04 20200402

1. COMBUSTION EQUIPMENT INFORMATION COAL FIRING YEAR COAL FIRING EQUIPMENT DESCRIPTION PUT IN CODE NO.

CODE LIST SERVICE (CODE LIST AT LEFT)

1. TANGENTIAL SECURITY EMERGENCY GENERATOR 09/04/1984 644 HP GENERAL ALLISON DETROIT MFG MODEL V71
2. OPPOSED
3. FRONT
4. DRY/WET BOTIOM OTHER (SPECIFY)

Sum of total maximum hourly design rates COMBUSTION EQUIPMENT USE (CHECK ONE)

YEAR OF DATA 2011 SEG. NO.

1 MAXIMUM DESIGN RATE (MILLION BTU/HR.)

1.700000 1.7000 D Electric power generation

~

Industrial use 0

Commercial/Institutional D Space heating D Other (specify}:

COMBUSTION EQUIPMENT CATEGORY-COAL USE ONLY (CHECK ONE) 0 Pulverized coal D Pulverized coal dry bottom D Pulverized coal wet bottom Ocyclone 0

Fluidized bed 0

Spreader stoker 0

Overfeed stoker 0

Underfeed stoker 0Hand fired 0

Other (specify):

2. FUEL INFORMATION (CHECK ONLY ONE)

LIQUID FUELS GASEOUS FUELS SOLID FUELS OTHER OEthanol D Blast oven gas 0

Anthracite Coal D Other (specify):

~Fuel oil 1-4 (distillate)

D Coke oven gas 0Bagasse 0 Fuel oil 5-6 (residual )

D Liquid propane gas (LPG) 0Bark OGasoline D Natural gas D Bituminous coal OKerosene ocoke OLignite D Subbituminous coal owood

3. CALCULATION OF MAXIMUM HOURLY DESIGN RATE TOTAL HEAT CONTENT MAXIMUM HOURLY DESIGN RATE Maximum Design Rate (mmbtu/hr.) X 1,000,000 (btu/mmbtu)

(BTU/FUEL UNIT}

(FUEL UNIT/HR.)

=

Heat Content (btu/fuel unit) 137,000,000.000000 0.01241 MO 780.1436 (12*09)

MISSOURI DEPARTMENT OF NATURAL RESOURCES AIR POLLUTION CONTROL PROGRAM EMISSIONS INVENTORY QUESTIONNAIRE, OR EIQ FORM 2.0 EMISSION UNIT INFORMATION FACILITY NAME FIPS COUNTY NO.

AMEREN MISSOURI 027 CALLAWAY NUCLEAR POWER PLANT

1. EMISSION UNIT IDENTIFICATION EMISSION UNIT NO.

PlANT NO.

YEAR OF DATA 0026 2011 B-05 I EMISSION UNIT DESCRIPTION TSC EMERGENCY GENERATOR

2. EMISSION PROCESS DETAIL SEG. NO.

I SOURCE CLASSIFICATION CODE (SCC)

SCC DESCRIPTION 1

20200402 Dual Fuel (Oil/Gas)

DO THE EMISSIONS FROM THIS EMISSION UNIT FLOW THROUGH A STACK OR VENT?

[8J Yes O

No IF YES, COMPLETE FORM 2.0S STACKNENT INFORMATION ARE THE EMISSIONS FROM THIS UNIT FUGITIVE?

D Yes

[8J No IF FUGITIVE, WHAT PERCENTAGE?

3. OPERATING RATEJSCHEDULE
4. ANNUAL FUEL CHARACTERISTICS ANNUAL THROUGHPUT UNITS DEC-FEB (%)

For coal or fuel oil, list details below 28.00 7.21 1000 MAR-MAY(%)

Heat Content (BTU/Fuel Unit)

HORSEPOWER-HOURS 13.00 137,000,000.00 HOURS/DAY DAYS/WEEK WEEKS/YEAR TOTAL HOURS/YEAR JUN-AUG(%)

ASH % (INCLUDE IN EF) 26.00 0.00 24.00 7.00 52 8,736.00 SEPT-NOV(%)

SULFUR% (INCLUDE IN EF) 33.00 0.00

5. EMISSION CALCULATIONS AIR
1.
2.
3.
4.
5.

Annual Throughput POLLUTANT SOURCE OF EMISSION EMISSION OVERALL ACTUAL x Emission Factor EMISSION FACTOR FACTOR(EF)

CONTROL EMISSIONS (1-0verall Control Eff/1 00)

FACTOR CONTROL EFFICIENCY (TONS/YR)

X STATUS

(%FORMAT)

+ 2000

=Actual Emissions (tons)

Instructions:

Choose from the LbsJunit of throughput If EF includes control Combination of all If controlled, indude List Other Worksheets or Source of Emission mark"C",

capture and Form 2.0C Control AP-42/0ther Reference Factor list otherwise *u" destruction Device Listing at lower right efficiencies PM10 FIL

  • 4F 2.2000 No Control 0.00 0.01 SOURCE OF EMISSION FACTOR LIST SOx 4F 2.0500 No Control 0.00 0.01
1. GEM Include documentation
2. Stack Test Include documentation NOx 4F 31.0000 No Control 0.00 0.11
3. Mass Balance Include documentation
4. AP-42 Include reference voc 4F 2.4700 No Control 0.00 0.01 4F. FIRE or webFIRE
5. Other Include documentation co 4F 6.6800 No Control 0.00 0.02 EC. Engr Calc Include documentation LS. Landfill Spdsht Include documentation LEAD TK. TANKS Program Supply TANKS output 2.3. VOC Mass Bal Complete Form 2.3 HAPs 2.4. Liquid Loading Complete Form 2.4 2.7. Haul Road Complete Form 2.7 PM2.5 FIL
  • 2.8. Storage Pile Complete Form 2.8 2.T. HAP Worksheet Complete Form 2.T NH3 2.9. Stack Test/GEM Complete Form 2.9 2.0L. Landfill Complete Form 2.0L PM CON*

'If PM CON is reported, PM10 and PM25 enlnes above are required and should represent only the filterable PM10 and filterable PM25.

MO 780-1621 (05-10)

MISSOURI DEPARTMENT OF NATURAL RESOURCES AIR POLLUTION CONTROL PROGRAM EMISSIONS INVENTORY QUESTIONNAIRE, OR EIQ FORM 2.1 FUEL COMBUSTION WORKSHEET FACILITY NAME FIPS COUNTY NO.

PLANT NO.

AMEREN MISSOURI 027 0026 CALLAWAY NUCLEAR POWER PLANT EMISSION UNIT NO.

SOURCE CLASSIFICATION CODE (SCC) 8-05 20200402

1. COMBUSTION EQUIPMENT INFORMATION COAL FIRING YEAR COAL FIRING EQUIPMENT DESCRIPTION PUT IN CODE NO.

CODE LIST SERVICE (CODE LIST AT LEFT)

1. TANGENTIAL TSC EMERGENCY DIESEL GEN 09/04/1984 355 HP CUMMINS MOD NT-835GS
2. OPPOSED
3. FRONT
4. DRY/WET BOTTOM OTHER (SPECIFY)

Sum of total maximum hourly design rates COMBUSTION EQUIPMENT USE (CHECK ONE)

YEAR OF DATA 2011 SEG. NO.

1 MAXIMUM DESIGN RATE (MILLION BTU/HR.)

0.800000 0.8000 D Electric power generation

~

Industrial use D Commercial/Institutional D Space heating D Other (specify):

COMBUSTION EQUIPMENT CATEGORY-COAL USE ONLY (CHECK ONE)

D Pulverized coal D Pulverized coal dry bottom D Pulverized coal wet bottom Ocyclone D Fluidized bed D Spreader stoker D Overfeed stoker D Underfeed stoker 0Hand fired D Other (specify):

2. FUEL INFORMATION (CHECK ONLY ONE)

LIQUID FUELS GASEOUS FUELS SOLID FUELS OTHER D Ethanol D Blast oven gas D Anthracite Coal D Other (specify):

~Fuel oil 1-4 (distillate)

D Coke oven gas OBagasse D Fuel oil 5-6 (residual)

D Liquid propane gas (LPG)

OBark OGasoline D Natural gas D Bituminous coal D Kerosene ocoke OLignite D Subbituminous coal owood

3. CALCULATION OF MAXIMUM HOURLY DESIGN RATE TOTAL HEAT CONTENT MAXIMUM HOURLY DESIGN RATE Maximum Design Rate (mmbtu/hr.) X 1,000,000 (btu/mmbtu)

(BTU/FUEL UNIT)

(FUEL UNIT/HR.)

=

Heat Content (btu/fuel unit) 137,000,000.000000 0.00584 MO 78()..1436 (12*09)

MISSOURI DEPARTMENT OF NATURAL RESOURCES AIR POLLUTION CONTROL PROGRAM EMISSIONS INVENTORY QUESTIONNAIRE, OR EIQ FORM 2.0 EMISSION UNIT INFORMATION FACILITY NAME FIPS COUNTY NO.

AMEREN MISSOURI 027 CALLAWAY NUCLEAR POWER PLANT

1. EMISSION UNIT IDENTIFICATION EMISSION UNIT NO.

PLANT NO.

YEAR OF DATA 0026 2011 B-06 I EMISSION UNIT DESCRIPTION EOF EMERGENCY GENERATOR

2. EMISSION PROCESS DETAIL SEG. NO.

I SOURCE CLASSIFICATION CODE (SCC)

SCC DESCRIPTION 1

20200402 Dual Fuel (Oil/Gas)

DO THE EMISSIONS FROM THIS EMISSION UNIT FLOW THROUGH A STACK OR VENT?

(8J Yes D

Na IF YES, COMPLETE FORM 2.0S STACKNENT INFORMATION ARE THE EMISSIONS FROM THIS UNIT FUGITIVE?

DYes

[8JNo IF FUGITIVE, WHAT PERCENTAGE?

3. OPERATING RATE/SCHEDULE
4. ANNUAL FUEL CHARACTERISTICS ANNUAL THROUGHPUT UNITS DEC-FEB (%)

For coal or fuel oil, list details below 19.00 9.15 1000 MAR-MAY(%)

Heat Content (BTU/Fuel Unit)

HORSEPOWER-HOURS 23.00 137,000,000.00 HOURS/DAY DAYS/WEEK WEEKS/YEAR TOTAL HOURS/YEAR JUN-AUG(%)

ASH % (INCLUDE IN EF) 40.00 0.00 24.00 7.00 52 8,736.00 SEPT-NOV(%)

SULFUR % (INCLUDE IN EF) 18.00 0.00

5. EMISSION CALCULATIONS AIR
1.
2.
3.
4.
5.

Annual Throughput POLLUTANT SOURCE OF EMISSION EMISSION OVERALL ACTUAL x Emission Factor EMISSION FACTOR FACTOR(EF)

CONTROL EMISSIONS (1-0verall Control Eff/1 00)

FACTOR CONTROL EFFICIENCY (TONSNR)

X STATUS

(%FORMAT)

+ 2000

=Actual Emissions (tons)

Instructions:

Choose from the LbsJunit of throughput If EF includes control Combination of all If controlled, include List Other Worksheets or Source of Emission mark "C",

capture and Form 2.0C Control AP-42/0ther Reference Factor list otherwise "U" destruction Device Listing at lower right efficiencies PM10 FIL

  • 4F 2.2000 No Control 0.00 0.01 SOURCE OF EMISSION FACTOR LIST SOx 4F 2.0500 No Control 0.00 0.01
1. CEM Include documentation
2. Stack Test Include documentation NOx 4F 31.0000 No Control 0.00 0.14
3. Mass Balance Include documentation
4. AP-42 Include reference voc 4F 2.4700 No Control 0.00 0.01 4F. FIRE or webFIRE
5. Other Include documentation co 4F 6.6800 No Control 0.00 0.03 EC. Engr Calc Include documentation LS. Landfill Spdsht Include documentation LEAD TK. TANKS Program Supply TANKS output 2.3. VOC Mass Bal Complete Form 2.3 HAPs 2.4. Liquid Loading Complete Form 2.4 2.7. Haul Road Complete Form 2.7 PM2.5 FIL
  • 2.8. Storage Pile Complete Form 2.8 2.T. HAP Worksheet Complete Form 2.T NH3 2.9. Stack Test/GEM Complete Form 2.9 2.0L. Landfill Complete Form 2.0L PM CON*

"If PM CON is reported, PM10 and PM25 entries above are required and should represent only the filterable PM10 and filterable PM25.

MO 780-1621 (05-10)

MISSOURI DEPARTMENT OF NATURAL RESOURCES AIR POLLUTION CONTROL PROGRAM EMISSIONS INVENTORY QUESTIONNAIRE, OR EIQ FORM 2.1 FUEL COMBUSTION WORKSHEET FACILITY NAME FIPS COUNTY NO.

PLANT NO.

AMEREN MISSOURI 027 0026 CALLAWAY NUCLEAR POWER PLANT EMISSION UNIT NO.

SOURCE CLASSIFICATION CODE (SCC)

B-06 20200402

1. COMBUSTION EQUIPMENT INFORMATION COAL FIRING YEAR COAL FIRING EQUIPMENT DESCRIPTION PUT IN CODE NO.

CODE LIST SERVICE (CODE LIST AT LEFT)

1. TANGENTIAL EOF EMERGENCY GENERATOR 09/04/1984 565 HP CUMMINS MODEL KTA-1150-GS-1
2. OPPOSED
3. FRONT
4. DRY/WET BOTIOM OTHER (SPECIFY)

Sum of total maximum hourly design rates COMBUSTION EQUIPMENT USE (CHECK ONE)

YEAR OF DATA 2011 SEG. NO.

1 MAXIMUM DESIGN RATE (MILLION BTU/HR.)

1.200000 1.2000 O Electric power generation

~

Industrial use 0 Commercial/Institutional O Space heating O Other (specify):

COMBUSTION EQUIPMENT CATEGORY-COAL USE ONLY (CHECK ONE) 0 Pulverized coal 0 Pulverized coal dry bottom O Pulverized coal wet bottom Ocyclone 0 Fluidized bed 0

Spreader stoker 0

Overfeed stoker 0 Underfeed stoker 0Hand fired 0

Other (specify):

2. FUEL INFORMATION (CHECK ONLY ONE)

LIQUID FUELS GASEOUS FUELS SOLID FUELS OTHER OEthanol O Blast oven gas 0 Anthracite Coal O Other (specify):

~Fuel oil1-4 (distillate)

O Coke oven gas O Bagasse O Fuel oil 5-6 (residual)

O Liquid propane gas (LPG)

OBark OGasoline O Natural gas 0 Bituminous coal O Kerosene ocoke O Lignite 0 Subbituminous coal owood

3. CALCULATION OF MAXIMUM HOURLY DESIGN RATE TOTAL HEAT CONTENT MAXIMUM HOURLY DESIGN RATE Maximum Design Rate (mmbtu/hr.) X 1,000,000 (btu/mmbtu)

(BTU/FUEL UNIT)

(FUEL UNIT/HR.)

=

Heat Content (btu/fuel unit) 137,000,000.000000 0.00876 MO 780-1436 (12-09)

MISSOURI DEPARTMENT OF NATURAL RESOURCES AIR POLLUTION CONTROL PROGRAM EMISSIONS INVENTORY QUESTIONNAIRE, OR EIQ FORM 2.0 EMISSION UNIT INFORMATION FACILITY NAME FIPS COUNTY NO.

AMEREN MISSOURI 027 CALLAWAY NUCLEAR POWER PLANT

1. EMISSION UNIT IDENTIFICATION EMISSION UNIT NO.

PLANT NO.

YEAR OF DATA 0026 2011 B-07 I EMISSION UNIT DESCRIPTION FIRE PROTECTION DIESEL GENERATORS (2)

2. EMISSION PROCESS DETAIL SEG. NO.

I SOURCE CLASSIFICATION CODE (SCC)

SCC DESCRIPTION 1

20200402 Dual Fuel (Oil/Gas)

DO THE EMISSIONS FROM THIS EMISSION UNIT FLOW THROUGH A STACK OR VENT?

(8J Yes D

Na IF YES, COMPLETE FORM 2.0S STACKNENT INFORMATION ARE THE EMISSIONS FROM THIS UNIT FUGITIVE?

D Yes

[8J No IF FUGITIVE, WHAT PERCENTAGE?

3. OPERATING RATE/SCHEDULE
4. ANNUAL FUEL CHARACTERISTICS ANNUAL THROUGHPUT UNITS DEC-FEB (%)

For coal or fuel o il, list details below 49.00 16.04 1000 MAR-MAY(%)

Heat Content (BTU/Fuel Unit)

HORSEPOWER-HOURS 31.00 137,000,000.00 HOURS/DAY DAYS/WEEK WEEKS/YEAR TOTAL HOURS/YEAR JUN-AUG (%)

ASH % (INCLUDE IN EF) 11.00 0.00 24.00 7.00 52 8,736.00 SEPT-NOV(%)

SULFUR % (INCLUDE IN EF) 9.00 0.00

5. EMISSION CALCULATIONS AIR
1.
2.
3.
4.
5.

Annual Throughput POLLUTANT SOURCE OF EMISSION EMISSION OVERALL ACTUAL x Emission Factor EMISSION FACTOR FACTOR(EF)

CONTROL EMISSIONS (1-0verall Control Eff/1 00)

FACTOR CONTROL EFFICIENCY (TONSNR)

X STATUS

(%FORMAT)

.;. 2000

=Actual Emissions (tons)

Instructions:

Choose from the Lbslunit of throughput If EF includes control Combination of all If controlled, indude List Other Worksheets or Source of Emission mark *c*.

capture and Form 2.0C Control AP-42/0ther Reference Factor list otherwise *u*

destruction Device Listing at lower right efficiencies PM10 FIL

  • 4F 2.2000 No Control 0.00 0.02 SOURCE OF EMISSION FACTOR LIST SOx 4 F 2.0500 No Control 0.00 0.02 1.CEM Include documentation
2. Stack Test Include documentation NOx 4 F 31.0000 No Control 0.00 0.25
3. Mass Balance Include documentation 4. AP-42 Include reference voc 4F 2.4700 No Control 0.00 0.02 4F. F IRE or webFIRE
5. Oth er Include documentation co 4F 6.6800 No Control 0.00 0.05 EC. Engr Calc Include documentation LS. Landfill Spdsht Include documentation LEAD TK. TANKS Progra m Supply TANKS output 2.3. VOC Mass Bal Complete Fonm 2.3 HAPs 2.4. Liquid Loading Complete Fonm 2.4 2.7. Haul Road Complete Fonm 2.7 PM2.5 FIL
  • 2.8. Storage P ile Complete Fonm 2.8 2.T. HAP Worksheet Complete Fonm 2.T NH3 2.9. Stack Test/CEM Complete Fonm 2.9 2.0L. Landfill Complete Fonm 2.0L PM CON*
  • If PM CON is reported, PM10 and PM25 entries above are required and should represent only the filterable PM1 0 and filterable PM25.

MO 780-1621 (05-10)

MISSOURI DEPARTMENT OF NATURAL RESOURCES AIR POLLUTION CONTROL PROGRAM EMISSIONS INVENTORY QUESTIONNAIRE, OR EIQ FORM 2.1 FUEL COMBUSTION WORKSHEET FACILITY NAME FIPS COUNTY NO.

PLANT NO.

AMEREN MISSOURI 027 0026 CALLAWAY NUCLEAR POWER PLANT EMISSION UNIT NO.

SOURCE CLASSIFICATION CODE (SCC)

B-07 20200402

1. COMBUSTION EQUIPMENT INFORMATION COAL FIRING YEAR COAL FIRING CODE LIST EQUIPMENT DESCRIPTION PUT IN CODE NO.

SERVICE (CODE LIST AT LEFT)

1. TANGENTIAL FIRE PROTECTION DIESEL GEN 09/04/1984 (2) 255 HP CUMMINS NT-855-F1
2. OPPOSED
3. FRONT
4. DRY/WET BOTTOM OTHER (SPECIFY)

YEAR OF DATA 2011 SEG. NO.

1 MAXIMUM DESIGN RATE (MILLION BTU/HR.)

1.200000 Sum of total maximum hourly design rates 1.2000 COMBUSTION EQUIPMENT USE (CHECK ONE) 0 Electric power generation

~

Industrial use 0 Commercial/Institutional O Space heating O Other (specify):

COMBUSTION EQUIPMENT CATEGORY-COAL USE ONLY (CHECK ONE) 0 Pulverized coal O Pulverized coal dry bottom O Pulverized coal wet bottom Ocyclone D Fluidized bed D Spreader stoker D Overfeed stoker D Underfeed stoker 0Hand fired D Other (specify):

2. FUEL INFORMATION (CHECK ONLY ONE)

LIQUID FUELS GASEOUS FUELS SOLID FUELS OTHER OEthanol O Blast oven gas 0 Anthracite Coal O Other (specify):

~Fuel oil1-4 (distillate) 0 Coke oven gas OBagasse D Fuel oil 5-6 (residual)

D Liquid propane gas (LPG)

OBark OGasoline D Natural gas D Bituminous coal OKerosene ocoke O Lignite D Subbituminous coal owood

3. CALCULATION OF MAXIMUM HOURLY DESIGN RATE TOTAL HEAT CONTENT MAXIMUM HOURLY DESIGN RATE Maximum Design Rate (mmbtu/hr.) X 1,000,000 (btu/mmbtu)

(BTU/FUEL UNIT)

(FUEL UNIT/HR.)

=

Heat Content (btu/fuel unit) 137,000,000.000000 0.00876 MO 780.1436 (12*09)

MISSOURI DEPARTMENT OF NATURAL RESOURCES AIR POLLUTION CONTROL PROGRAM EMISSIONS INVENTORY QUESTIONNAIRE, OR EIQ FORM 2.0 EMISSION UNIT INFORMATION FACILITY NAME FIPS COUNTY NO.

AMEREN MISSOURI 027 CALLAWAY NUCLEAR POWER PLANT

1. EMISSION UNIT IDENTIFICATION EMISSION UNIT NO.

PLANT NO.

YEAR OF DATA 0026 2011 B-10 I EMISSION UNIT DESCRIPTION PORTABLE DIESEL GENERATOR

2. EMISSION PROCESS DETAIL SEG. NO.

I SOURCE CLASSIFICATION CODE (SCC)

SCC DESCRIPTION 1

20200402 Dual Fuel ( O il/Gas)

DO THE EMISSIONS FROM THIS EMISSION UNIT FLOW THROUGH A STACK OR VENT?

D Yes [8j No IF YES, COMPLETE FORM 2.0S STACKNENT INFORMATION ARE THE EMISSIONS FROM THIS UNIT FUGITIVE?

[8j Yes D

Na IF FUGITIVE, WHAT PERCENTAGE?

100.00

3. OPERATING RATE/SCHEDULE
4. ANNUAL FUEL CHARACTERISTICS ANNUAL THROUGHPUT UNITS DEC-FEB (%)

For coal or fuel o il, list details below 0.00 0.00 1000 MAR-MAY (%)

Heat Content (BTU/Fuel Unit)

HORSEPOWER-HOURS 0.00 137,000,000.00 HOURS/DAY DAYS/WEEK WEEKS/YEAR TOTAL HOURS/YEAR JUN-AUG (%)

ASH % (INCLUDE IN EF) 0.00 0.00 24.00 7.00 52 8,736.00 SEPT-NOV (%)

SULFUR % (INCLUDE IN EF) 0.00 0.00

5. EMISSION CALCULATIONS AIR
1.
2.
3.
4.
5.

Annual Throughput POLLUTANT SOURCE OF EMISSION EMISSION OVERALL ACTUAL X Emission Factor EMISSION FACTOR FACTOR(EF)

CONTROL EMISSIONS (1-0verall Control Eff/1 00)

FACTOR CONTROL EFFICIENCY (TONS/YR)

X STATUS

(%FORMAT)

+ 2000

=Actual Emissions (tons)

Instructions:

Choose from the Lbs./unit of throughput If EF includes control Combination of all If controlled, in dude List Other Worksheets or Source of Emission mark "C",

capture and Form 2.0C Control AP-42/0ther Reference Factor list otherwise "U" destruction Device Listing at lower right efficiencies PM10 FIL

  • 4F 42.4700 No Control 0.00 0.00 SOURCE OF EMISSION FACTOR LIST SOx 4F 39.7300 No Control 0.00 0.00
1. CEM Include documentation 2. Stack Test Include documentation NOx 4F 604.1700 No Control 0.00 0.00
3. Mass Balance Include documentation 4. AP-42 Include reference voc 4 F 47.9500 No Control 0.00 0.00 4F. FIRE or web FIRE
5. Other Include documentation co 4F 130.1500 No Control 0.00 0.00 EC. Engr Calc Include documentation LS. Landfill Spdsht Include documentation LEAD TK. TANKS Program Supply TANKS output 2.3. VOC Mass Sal Complete Form 2.3 HAPs 2.4. Liquid Loading Complete Form 2.4 2.7. Haul Road Complete Form 2.7 PM2.5 FIL
  • 2.8. Storage Pile Complete Form 2.8 2.T. HAP Worksheet Complete Form 2.T NH3 2.9. Stack Test/GEM Complete Form 2.9 2.0L. Landfill Complete Form 2.0L PM CON*
  • If PM CON is reported, PM10 and PM25 entries above are required and should represent only the filterable PM1 0 and filterable PM25.

MO 780-1621 (05-10)

MISSOURI DEPARTMENT OF NATURAL RESOURCES AIR POLLUTION CONTROL PROGRAM EMISSIONS INVENTORY QUESTIONNAIRE, OR EIQ FORM 2.1 FUEL COMBUSTION WORKSHEET FACILITY NAME FIPS COUNTY NO.

PLANT NO.

AMEREN MISSOURI 027 0026 CALLAWAY NUCLEAR POWER PLANT EMISSION UNIT NO.

SOURCE CLASSIFICATION CODE (SCC)

B-10 20200402

1. COMBUSTION EQUIPMENT INFORMATION COAL FIRING YEAR COAL FIRING EQUIPMENT DESCRIPTION PUT IN CODE NO.

CODE LIST SERVICE (CODE LIST AT LEFT)

1. TANGENTIAL KOHLER 180 KW DIESEL GENERATOR 09/04/1995 MODEL# 180ROZJ
2. OPPOSED
3. FRONT
4. DRY/WET BOTIOM OTHER (SPECIFY)

YEAR OF DATA 2011 SEG. NO.

1 MAXIMUM DESIGN RATE (MILLION BTU/HR.)

3.905000 Sum of total maximum hourly design rates 3.9050 COMBUSTION EQUIPMENT USE (CHECK ONE)

~

Electric power generation D Industrial use D Commercial/Institutional D Space heating D Other (specify):

COMBUSTION EQUIPMENT CATEGORY-COAL USE ONLY (CHECK ONE)

D Pulverized coal D Pulverized coal dry bottom D Pulverized coal wet bottom Ocyclone 0

Fluidized bed 0

Spreader stoker 0

Overfeed stoker 0

Underfeed stoker 0Hand fired 0

Other (specify):

2. FUEL INFORMATION (CHECK ONLY ONE)

LIQUID FUELS GASEOUS FUELS SOLID FUELS OTHER OEthanol D Blast oven gas D Anthracite Coal D Other (specify):

~Fuel oil1-4 (distillate)

D Coke oven gas 0Bagasse D Fuel oil 5-6 (residual)

D Liquid propane gas (LPG)

OBark OGasoline D Natural gas D Bituminous coal D Kerosene ocoke OLignite D Subbituminous coal owood

3. CALCULATION OF MAXIMUM HOURLY DESIGN RATE TOTAL HEAT CONTENT MAXIMUM HOURLY DESIGN RATE Maximum Design Rate (mmbtu/hr.) X 1,000,000 (btu/mmbtu)

(BTU/FUEL UNIT)

(FUEL UNIT/HR.)

=

Heat Content (btu/fuel unit) 137,000,000.000000 0.02850 MO 780.1436 (12-09)

MISSOURI DEPARTMENT OF NATURAL RESOURCES AIR POLLUTION CONTROL PROGRAM EMISSIONS INVENTORY QUESTIONNAIRE, OR EIQ FORM 2.0 EMISSION UNIT INFORMATION FACILITY NAME FIPS COUNTY NO.

AMEREN MISSOURI 027 CALLAWAY NUCLEAR POWER PLANT

1. EMISSION UNIT IDENTIFICATION EMISSION UNIT NO.

PLANT NO.

YEAR OF DATA 0026 2011 B-12 I EMISSION UNIT DESCRIPTION 4 Permanent Diesel Generators

2. EMISSION PROCESS DETAIL SEG. NO.

I SOURCE CLASSIFICATION CODE (SCC)

SCC DESCRIPTION 1

20200402 Dual Fuel (Oil/Gas)

DO THE EMISSIONS FROM THIS EMISSION UNIT FLOW THROUGH A STACK OR VENT?

(8J Yes O

No IF YES, COMPLETE FORM 2.0S STACKNENT INFORMATION ARE THE EMISSIONS FROM THIS UNIT FUGITIVE?

D Yes

[8JNo IF FUGITIVE, WHAT PERCENTAGE?

3. OPERATING RATE/SCHEDULE
4. ANNUAL FUEL CHARACTERISTICS ANNUAL THROUGHPUT UNITS DEC-FEB (%)

For coal or fuel oil, list details below 25.00 934.24 1000 MAR-MAY(%)

Heat Con lent (BTU/Fuel Unit)

HORSEPOWER-HOURS 25.00 HOURS/DAY DAYS/WEEK WEEKS/YEAR TOTAL HOURS/YEAR JUN-AUG(%)

ASH % (INCLUDE IN EF) 25.00 0.00 8.00 5.00 52 2,080.00 SEPT-NOV(%)

SULFUR% (INCLUDE IN EF) 25.00 0.00

5. EMISSION CALCULATIONS AIR
1.
2.
3.
4.
5.

Annual Throughput POLLUTANT SOURCE OF EMISSION EMISSION OVERALL ACTUAL X Emission Factor EMISSION FACTOR FACTOR(EF)

CONTROL EMISSIONS (1-0verall Control Eff/1 00)

FACTOR CONTROL EFFICIENCY (TONS/YR)

X STATUS

(%FORMAT)

+ 2000

=Actual Emissions (tons)

Instructions:

Choose from the LbsJunit of throughput If EF includes control Combination of all If controlled, include List Other Worksheets or Source of Emission mark "C",

capture and Form 2.0C Control AP-42/0ther Reference Factor list otherwise *u*

destruction Device Listing at lower right efficiencies PM10 FIL

  • 5 - Manufacturer 0.1200 No Control 0.00 0.06 SOURCE OF EMISSION FACTOR LIST Specifications SOx 5

0.0100 No Control 0.00 0.00

1. CEM Include documentation
2. Stack Test Include documentation NOx 5

11.0000 No Control 0.00 5.14

3. Mass Balance Include documentation
4. AP-42 Include reference voc 5

0.5200 No Control 0.00 0.24 4F. FIRE or webFIRE

5. Other Include documentation co 5

1.1100 No Control 0.00 0.52 EC. Engr Calc Include documentation LS. Landfill Spdsht Include documentation LEAD TK. TANKS Program Supply TANKS output 2.3. VOC Mass Sal Complete Form 2.3 HAPs 2.4. Liquid Loading Complete Form 2.4 2.7. Haul Road Complete Form 2. 7 PM2.5 FIL

  • 2.8. Storage Pile Complete Form 2.8 2.T. HAP Worksheet Complete Form 2.T NH3 2.9. Stack Test/GEM Complete Form 2.9 2.0L. Landfill Complete Form 2.0L PM CON*
  • If PM CON is reported, PM10 and PM25 entries above are required and should represent only the filterable PM10 and filterable PM25.

MO 780-1621 (05-10)

MISSOURI DEPARTMENT OF NATURAL RESOURCES AIR POLLUTION CONTROL PROGRAM EMISSIONS INVENTORY QUESTIONNAIRE, OR EIQ FORM 2.0 EMISSION UNIT INFORMATION FACILITY NAME FIPS COUNTY NO.

AMEREN MISSOURI 027 CALLAWAY NUCLEAR POWER PLANT

1. EMISSION UNIT IDENTIFICATION EMISSION UNIT NO.

PLANT NO.

YEAR OF DATA 0026 2011 B-13 I

EMISSION UNIT DESCRIPTION 5 Temporary Diesel Generators

2. EMISSION PROCESS DETAIL SEG. NO.

I SOURCE ClASSIFICATION CODE (SCC)

SCC DESCRIPTION 1

20200402 Dual Fuel (Oil/Gas)

DO THE EMISSIONS FROM THIS EMISSION UNIT FLOW THROUGH A STACK OR VENT?

(8J Yes D

Na IF YES, COMPLETE FORM 2.0S STACKNENT INFORMATION ARE THE EMISSIONS FROM THIS UNIT FUGITIVE?

D Yes

[8J No IF FUGITIVE, WHAT PERCENTAGE?

3. OPERATING RATE/SCHEDULE
4. ANNUAL FUEL CHARACTERISTICS ANNUAL THROUGHPUT UNITS DEC-FEB (%)

For coal or fuel oil, list details below 50.00 0.00 1000 MAR*MAY(%)

Heat Content (BTU/Fuel Unit)

HORSEPOWER-HOURS 0.00 HOURS/DAY DAYS/WEEK WEEKS/YEAR TOTAL HOURS/YEAR JUN-AUG(%)

ASH% (INCLUDE IN EF) 50.00 0.00 8.00 5.00 52 2,080.00 SEPT-NOV(%)

SULFUR% (INCLUDE IN EF) 0.00 0.00

5. EMISSION CALCULATIONS AIR
1.
2.
3.
4.
5.

Annual Throughput POLLUTANT SOURCE OF EMISSION EMISSION OVERALL ACTUAL X Emission Factor EMISSION FACTOR FACTOR(EF)

CONTROL EMISSIONS (1-0verall Control Eff/1 00)

FACTOR CONTROL EFFICIENCY (TONSIYR)

X STATUS

(%FORMAT)

+ 2000

=Actual Emissions (tons)

Instructions:

Choose from the Lbs./unit of throughput If EF includes control Combination of all If controlled, indude List Other Worksheets or Source of Emission mark*C",

capture and Form 2.0C Control AP-42/0ther Reference Factor list otherwise "U" destruction Device Listing at lower right efficiencies PM10 FIL

  • 5 - Manufacturer's 0.1200 No Control 0.00 0.00 SOURCE OF EMISSION FACTOR LIST Specifications SOx 5

0.0100 No Control 0.00 0.00

1. CEM Include documentation 2. Stack Test Include documentation NOx 5

11.0000 No Control 0.00 0.00 3. Mass Balance Include documentation 4. AP-42 Include reference voc 5

0.5200 No Control 0.00 0.00 4F. FIRE or webFIRE

5. Other Include documentation co 5

1.1100 No Control 0.00 0.00 EC. Engr Calc Include documentation LS. Landfill Spdsht Include documentation LEAD TK. TANKS Program Supply TANKS output 2.3. VOC Mass Bal Complete Fonm 2.3 HAPs 2.4. Liquid Loading Complete Fonm 2.4 2.7. Haul Road Complete Fonm 2.7 PM2.5 FIL

  • 2.8. Storage Pile Complete Fonm 2.8 2.T. HAP Worksheet Complete Fonm 2.T NH3 2.9. Stack Test/CEM Complete Fonm 2.9 2.0L. Landfill Complete Fonm 2.0L PM CON*
  • If PM CON is reported, PM10 and PM25 entries above are required and should represent only the filterable PM1 0 and filterable PM25.

MO 78Q-1621 (05-10)

MISSOURI DEPARTMENT OF NATURAL RESOURCES AIR POLLUTION CONTROL PROGRAM EMISSIONS INVENTORY QUESTIONNAIRE, OR EIQ FORM 2.0S STACKNENT INFORMATION FACILITY NAME FIPS COUNTY NO.

AMEREN MISSOURI 027 CALLAWAY NUCLEAR POWER PLANT EMISSION UNIT NO.

SOURCE CLASSIFICATION CODE (SCC)

SEG. NO.

B-01 10200501 1

STACK/VENT NO.

STACK/VENT DESCRIPTION S-1 PlANT NO.

YEAR OF DATA 0026 2011

~Stack FOR A NON-CIRCULAR STACK:

D Vent DIAMETER= (1.128A)'1/2 (A=CROSS SECTIONAL AREA IN Sa FEET)

% OF EMISSIONS RELEASED 100.00 STACK/VENT OPERATING STATUS (CHECK ONE)

(8] Active D

lnactive O

oismantled HEIGHT (FT.)

DIAMETER (FT.)

TEMPERATURE (F)

VELOCITY (FT./MIN.)

FLOW RATE (CU FT./MIN.)

LIST OTHER POINTS SHARING THIS STACK/VENT 150.00 5.000 655.00 2,254.00 44,179.00 EMISSION UNIT NO.

SOURCE CLASSIFICATION CODE (SCC)

SEG. NO.

[8] Stack FOR A NON-CIRCULAR STACK:

B-02 20200402 1

D Vent DIAMETER = (1.12BA)'1/2 (A=CROSS SECTIONAL AREA IN sa FEET)

STACK/VENT NO.

STACK/VENT DESCRIPTION

% OF EMISSIONS RELEASED S-2 100.00 STACK/VENT OPERATING STATUS (CHECK ONE)

[8] Active D

lnactive O

oismantled HEIGHT (FT.)

DIAMETER (FT.)

TEMPERATURE (F)

VELOCITY (FT./MIN.)

FLOW RATE (CU FT./MIN.)

LIST OTHER POINTS SHARING THIS STACK/VENT 98.00 4.000 760.00 7,252.00 69,623.00 EMISSION UNIT NO.

SOURCE CLASSIFICATION CODE (SCC)

SEG. NO.

[8] Stack FOR A NON-CIRCULAR STACK:

B-03 20200402 1

D Vent DIAMETER = (1.128A)'1/2 (A=CROSS SECTIONAL AREA IN sa FEET)

STACK/VENT NO.

STACK/VENT DESCRIPTION

% OF EMISSIONS RELEASED S-3 100.00 STACK/VENT OPERATING STATUS (CHECK ONE)

[8] Active Dlnactive O

oismantled HEIGHT (FT.)

DIAMETER (FT.)

TEMPERATURE (F)

VELOCITY (FT./MIN.)

FLOW RATE (CU FT./MIN.)

LIST OTHER POINTS SHARING THIS STACK/VENT 98.00 4.000 760.00 7,252.00 69,623.00 EMISSION UNIT NO.

SOURCE CLASSIFICATION CODE (SCC)

SEG. NO.

[8] Stack FOR A NON-CIRCULAR STACK:

B-04 20200402 1

D Vent DIAMETER= (1.12BA)'1/2 (A=CROSS SECTIONAL AREA IN sa FEET)

STACK/VENT NO.

STACK/VENT DESCRIPTION

% OF EMISSIONS RELEASED S-4 100.00 STACK/VENT OPERATING STATUS (CHECK ONE)

(8] Active Dlnactive O

oismantled HEIGHT (FT.)

DIAMETER (FT.)

TEMPERATURE (F)

VELOCITY (FT./MIN.)

FLOW RATE (CU FT./MIN.)

LIST OTHER POINTS SHARING THIS STACK/VENT 19.00 2.000 780.00 2,864.00 6,300.00 MO 780-1435 (12-09)

MISSOURI DEPARTMENT OF NATURAL RESOURCES AIR POLLUTION CONTROL PROGRAM EMISSIONS INVENTORY QUESTIONNAIRE, OR EIQ FORM 2.0S STACKNENT INFORMATION FACILITY NAME FIPS COUNTY NO.

AMEREN MISSOURI 027 CALLAWAY NUCLEAR POWER PLANT EMISSION UNIT NO.

SOURCE CLASSIFICATION CODE (SCC)

SEG. NO.

B-05 20200402 1

STACKNENT NO.

STACKNENT DESCRIPTION S-5 PLANT NO.

YEAR OF DATA 0026 2011

[8] Stack FOR A NON-CIRCULAR STACK:

D Vent DIAMETER= (1.12SA)*1/2 (A=CROSS SECTIONAL AREA IN Sa FEET)

% OF EMISSIONS RELEASED 100.00 STACKNENT OPERATING STATUS (CHECK ONE)

(8] Aclive D

lnactive O

oismantled HEIGHT (FT.)

DIAMETER (FT.)

TEMPERATURE (F)

VELOCITY (FT./MIN.)

FLOW RATE (CU FT./MIN.)

LIST OTHER POINTS SHARING THIS STACKNENT 18.00 2.000 915.00 772.00 1,960.00 EMISSION UNIT NO.

SOURCE CLASSIFICATION CODE (SCC)

SEG. NO.

[8] Stack FOR A NON-CIRCULAR STACK:

B-06 20200402 1

D Vent DIAMETER= (1.12SA)*1/2 (A=CROSS SECTIONAL AREA IN Sa FEET)

STACKNENT NO.

STACKNENT DESCRIPTION

% OF EMISSIONS RELEASED S-6 100.00 STACKNENT OPERATING STATUS (CHECK ONE)

(8] Active D

lnactive 0 Dismantled HEIGHT (FT.)

DIAMETER (FT.)

TEMPERATURE (F)

VELOCITY (FT./MIN.)

FLOW RATE (CU FT./MIN.)

LIST OTHER POINTS SHARING THIS STACKNENT 19.00 2.000 950.00 1,388.00 3,040.00 EMISSION UNIT NO.

SOURCE CLASSIFICATION CODE (SCC)

SEG. NO.

[g) Stack FOR A NON-CIRCULAR STACK:

B-07 20200402 1

D Vent DIAMETER= (1.128A)'1 /2 (A=CROSS SECTIONAL AREA IN Sa FEET)

STACKNENT NO.

STACKNENT DESCRIPTION

% OF EMISSIONS RELEASED S-7 100.00 STACKNENT OPERATING STATUS (CHECK ONE)

[g) Active D

lnactive O

oismantled HEIGHT (FT.)

DIAMETER (FT.)

TEMPERATURE (F)

VELOCITY (FT./MIN.)

FLOW RATE (CU FT./MIN.)

LIST OTHER POINTS SHARING THIS STACKNENT 18.00 1.000 823.00 1,216.00 955.00 EMISSION UNIT NO.

SOURCE CLASSIFICATION CODE (SCC)

SEG. NO.

[g) Stack FOR A NON-CIRCULAR STACK:

B-12 20200402 1

D Vent DIAMETER = (1.128A)*1/2 (A=CROSS SECTIONAL AREA IN sa FEET)

STACKNENT NO.

STACKNENT DESCRIPTION

% OF EMISSIONS RELEASED S-2 100.00 STACKNENT OPERATING STATUS (CHECK ONE)

[g) Active Dlnactive D Dismantled HEIGHT (FT.)

DIAMETER (FT.)

TEMPERATURE (F)

VELOCITY (FT./MIN.)

FLOW RATE (CU FT./MIN.)

LIST OTHER POINTS SHARING THIS STACKNENT 98.00 4.000 760.00 7,252.00 69,623.00 MO 780-1435 (12-09)

MISSOURI DEPARTMENT OF NATURAL RESOURCES AIR POLLUTION CONTROL PROGRAM EMISSIONS INVENTORY QUESTIONNAIRE, OR EIQ FORM 2.0S STACKNENT INFORMATION FACILITY NAME FIPS COUNTY NO.

AMEREN MISSOURI 027 CALLAWAY NUCLEAR POWER PLANT EMISSION UNIT NO.

SOURCE CLASSIFICATION CODE (SCC)

SEG. NO.

B-13 20200402 1

STACK/VENT NO.

STACK/VENT DESCRIPTION S-3 PLANT NO.

YEAR OF DATA 0026 2011

[8.] Stack FOR A NON-CIRCULAR STACK:

D Vent DIAMETER= (1.128A)'1/2 (A=CROSS SECTIONAL AREA IN SQ FEET)

% OF EMISSIONS RELEASED 100.00 STACK/VENT OPERATING STATUS (CHECK ONE)

[8) Active Dlnactive O

oismantled HEIGHT (FT.)

DIAMETER (FT.)

TEMPERATURE (F)

VELOCITY (FT./MIN.)

FLOW RATE (CU FT./MIN.)

LIST OTHER POINTS SHARING THIS STACK/VENT 98.00 4.000 760.00 7,252.00 69,623.00 MO 780..1435 (12-09)

FACILITY NAME MISSOURI DEPARTMENT OF NATURAL RESOURCES AIR POLLUTION CONTROL PROGRAM EMISSIONS INVENTORY QUESTIONNAIRE, OR EIQ FORM 3.0 EMISSIONS FEE CALCULATION FIPS COUNTY NO.

PLANT NO.

YEAR OF DATA AMEREN MISSOURI 027 0026 2011 CALLAWAY NUCLEAR POWER PLANT

1.

Use one row to list the emissions from one emission unit. Sum the emissions in the page total box at the bottom of the column.

EMISSION UNIT NO. If more than one page is needed, use the first row of the duplicated page to list the page totals from this page. Express figures in tons per year and round to two decimal places.

sec AIR POLLUTANT PM10 FIL SOx NOx voc co LEAD HAPs PM2.5 FIL NH3 PM CON B-01 0.16 0.97 3.12 0.03 0.78 0.00 0.00 0.00 0.00 0.00 10200501 B-02 0.16 1.86 5.52 0.16 1.27 0.00 0.00 0.00 0.00 0.00 20200402 B-03 0.18 2.11 6.26 0.19 1.44 0.00 0.00 0.00 0.00 0.00 20200402 B-04 0.00 0.02 0.05 0.00 0.01 0.00 0.00 0.00 0.00 0.00 20200402 B-05 0.01 0.01 0.11 0.01 0.02 0.00 0.00 0.00 0.00 0.00 20200402 B-06 0.01 0.01 0.14 0.01 0.03 0.00 0.00 0.00 0.00 0.00 20200402 B-07 0.02 0.02 0.25 0.02 0.05 0.00 0.00 0.00 0.00 0.00 20200402 B-10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20200402 B-12 0.06 0.00 5.14 0.24 0.52 0.00 0.00 0.00 0.00 0.00 20200402 B-13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20200402 PAGE TOTALS 0.59 50.00 20.59 0.66 4.11 0.00 0.00 0.00 0.00 0.00 Note: Fill out the lower portion of this form one time only.

. ACTUAL EMISSIONS (Use the sum of all page totals for each pollutant for actual emission figures below.)

PM10 SOx NOx voc co LEAD HAPs PM2.5 NH3 PM CON Total TOTAL TOTAL 50.00 20.59 0.66 4.11 0.00 0.00 0.00 Included in 0.59 0.00 Total PM10 and PM2.5

\\.-opy the actual emissions from section 2 to the appropriate box(es) in the Total Plant Emissions section of Form 1.0 General Plant Information.

3. CHARGEABLE EMISSIONS (Maximum 4,000 Tons/Yr. cap per pollutant)

NO FEES NO FEES NO FEES PM CON is Total 0.59 50.00 20.59 0.66 FOR CO 0.00 0.00 FOR PM2.5 FOR NH3 included in PM10 and PM2.5

4. SUM OF CHARGEABLE EMISSIONS SUBJECT TO FEES Round chargeable emissions to the nearest whole ton. The minimum emission 27.00 Tons/Yr.

onnage is one ton, and the maximum is 12,000 tons per year.

~-TOTAL ANNUAL EMISSIONS FEE Multiply the sum of chargeable emissions as calculated in section 4 by $40 and enter

$ 1,080.00 his amount in section 5. The minimum fee is $40.

6. ANNUAL EMISSIONS FEE REMITTED TO THE CITY OF KANSAS CITY OR ST. LOUIS COUNTY LOCAL AIR AGENCY HECK NUMBER

~HECK DATE MOUNT REMIITED IN CALENDAR YEAR OF RECORD

$0.00

. ANNUAL EMISSIONS FEE REMITTED TO THE STATE (SECTION 5 MINUS SECTION 6)

CH ECK NUMBER r ~~~ UPI~

r HclOKAMUUN

$ 1,080.00

~.INCLUDE A CHECK FOR THE AMOUNT IN SECTION 7, PAYABLE TO THE MISSOURI AIR POLLUTION CONTROL PROGRAM.

Mail the check for the emissions fee to the State Air Agency listed on Form 1.0.

9. SEND THE COMPLETED QUESTIONNAIRE AND ANY SUPPORTING DOCUMENTATION TO THE AGENCY LISTED AT THE BOTTOM OF FORM 1.0 GENERAL PLANT INFORMATION.

Facilities within local air program jurisdiction only need to include copies of Form 1.0 General Plant Information, 3.0 Emissions Fee Calculation and Form 4.0 Financial Cost Estimate with the emissions fee check.

MO 780-1509 (12-09)

MISSOURI DEPARTMENT OF NATURAL RESOURCES AIR POLLUTION CONTROL PROGRAM EMISSIONS INVENTORY QUESTIONNAIRE, OR EIQ FORM 4.0 FINANCIAL COST ESTIMATE FACILITY NAME FIPS COUNTY NO.

PLANT NO.

YEAR OF DATA AMEREN MISSOURI 027 0026 2011 CALLAWAY NUCLEAR POWER PLANT

[The Missouri Air Conservation Law, Chapter 643, requires a financial cost estimate.

poing business attributable to the Federal Clean Air Act, as amended.

The cost estimate is an evaluation of any additional costs of

~alculate the cost and expenses incurred to complete the Emission Inventory Questionnaire, including the calculation of emission fees. If you hired

~n outside consultant, include the time and money charged to your company. Also include any cost incurred if you installed air pollution control

~quipment, any additional monitoring or testing expense or any additional personnel costs incurred to comply with the Missouri Air Conservation Law

~nd the Federal Clean Air Act, as amended.

Be sure to use the codes found in the instructions: www.dnr.mo.gov/env/apcp/eiq/eiqinformation.htm.

CATEGORY REPORTING CODE FOR NUMBER OF TOTAL NUMBER OF PERSONNEL OR EMPLOYEES HOURS REQUIRED COST PER HOUR TOTAL COST EQUIPMENT

1.

EIQ reviewed and completed by IA08 : Engineer-1 24.0 75.00 1,800.00 company personnel (engineers, Environmental I technical specialists, others).

lAir Quality Total 1,800.00 Remarks MO 780-1622 (12*09)