|
---|
Category:License-Operator
MONTHYEARML23216A0362023-08-0707 August 2023 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and RFI RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23079A2262023-03-20020 March 2023 Form 5.1-1 Post-Examination Check Sheet (Quad Cities, 2023) IR 05000254/20233012023-03-0707 March 2023 NRC Initial License Examination Report 05000254/2023301; 05000265/2023301 ML23079A2222023-02-21021 February 2023 Form 2.1-1 Examination Preparation Checklist ML23079A2192023-02-21021 February 2023 Form 1.3-1 Exam Security Agreement SVP-23-007, Licensee Post-Exam Submittal Letter (SVP-23-007, Quad Cities, 2023)2023-02-0909 February 2023 Licensee Post-Exam Submittal Letter (SVP-23-007, Quad Cities, 2023) ML23079A2282023-02-0808 February 2023 Post-Exam Review Comments (None) ML23020A4132023-01-23023 January 2023 Operator License Examination Approval - Quad Cities Nuclear Power Station, January 2023 ML23079A2072023-01-13013 January 2023 Form 2.3-4 Written Examination Quality Checklist (Quad Cities, 2023) ML23079A2042023-01-13013 January 2023 Form 2.3-2 Operating Test Quality Checklist (Quad Cities, 2023) ML23079A2032022-11-11011 November 2022 Licensee Proposed Exam Cover Letter (SVP-22-065, Quad Cities, 2023) ML23079A0842022-10-17017 October 2022 Form 3.4-1 Events and Evolutions Checklist (Quad Cities, 2023) ML23079A0432022-10-17017 October 2022 Form 2.3-1 Examination Outline Quality Checklist (Quad Cities, 2023).pdf ML23079A0272022-10-0505 October 2022 Licensee Outline Submittal Email (Quad Cities, 2023) ML22188A1752022-07-11011 July 2022 Confirmation of Initial License Examination RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21281A1242021-10-0808 October 2021 GFE Results, September 2021 IR 05000254/20213012021-08-23023 August 2021 NRC Initial License Examination Report 05000254/2021301; 05000265/2021301 ML22192A2062021-07-0909 July 2021 2021 QC Ile Outline Submittal Comments ML22192A2052021-07-0909 July 2021 2021 QC Ile ES-401-9 Written Examination Review Worksheet-Final ML22192A2032021-07-0909 July 2021 2021 QC Ile ES-301-7 Operating Test Review Worksheet-Final ML22192A1922021-07-0909 July 2021 2021 QC Ile ES-201-1 ML22192A1932021-07-0909 July 2021 2021 QC Ile ES-201-3 Security Agreement-Final ML22192A1952021-07-0909 July 2021 2021 QC Ile ES-403-1 Written Exam Quality Checklist ML22192A2042021-07-0909 July 2021 2021 QC Ile ES-401-4 Rejected KAs ML22192A1962021-06-22022 June 2021 2021 QC Ile Post-Exam Submittal Letter-06-22-2021 ML22193A2862021-06-14014 June 2021 2021 QC Ile Administered RO and SRO Written Exam-Final ML22193A2872021-06-14014 June 2021 2021 QC Ile Administered RO and SRO List of Reference Handouts-Final ML22193A0932021-06-14014 June 2021 2021 QC Ile Administered RO and SRO Admin JPMs-Final ML22193A1072021-06-14014 June 2021 2021 QC Ile Administered Simulator Scenarios-Final ML22193A1052021-06-14014 June 2021 2021 QC Ile Administered Simulator and Inplant JPMs-Final ML21152A1022021-06-0202 June 2021 Operator Licensing Examination Approval ML22193A3112021-05-0505 May 2021 2021 QC Ile Proposed Simulator Scenarios ML22193A3102021-05-0505 May 2021 2021 QC Ile Proposed Simulator and Inplant JPMs ML22193A3012021-05-0505 May 2021 2021 QC Ile ES-301-6 Competencies Checklist ML22193A3082021-05-0505 May 2021 2021 QC Ile Proposed RO and SRO Admin JPMs ML22193A3002021-05-0505 May 2021 2021 QC Ile ES-301-4 Simulator Scenario Quality Checklist ML22193A3032021-05-0505 May 2021 2021 QC Ile ES-401-6 Written Exam Quality Checklist ML22193A2992021-05-0505 May 2021 2021 QC Ile ES-301-3 Operating Test Quality Checklist ML22193A3122021-05-0505 May 2021 2021 QC Ile Proposed Written Exam-RO and SRO ML22193A3222021-04-0707 April 2021 2021 Quad-Cities Ile ES-D-1 Scenario Outlines ML22193A3202021-04-0707 April 2021 2021 Quad-Cities Ile ES-301-2 RO and SRO Sim-Inplant Systems Outlines ML22193A3142021-04-0707 April 2021 2021 Quad-Cities Ile ES-201-2 Outline Quality Checklist ML22193A3192021-04-0707 April 2021 2021 Quad-Cities Ile ES-301-1 RO and SRO Admin Topics Outlines 2023-08-07
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML23216A0362023-08-0707 August 2023 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and RFI RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23079A2262023-03-20020 March 2023 Form 5.1-1 Post-Examination Check Sheet (Quad Cities, 2023) IR 05000254/20233012023-03-0707 March 2023 NRC Initial License Examination Report 05000254/2023301; 05000265/2023301 ML23079A2192023-02-21021 February 2023 Form 1.3-1 Exam Security Agreement ML23079A2222023-02-21021 February 2023 Form 2.1-1 Examination Preparation Checklist SVP-23-007, Licensee Post-Exam Submittal Letter (SVP-23-007, Quad Cities, 2023)2023-02-0909 February 2023 Licensee Post-Exam Submittal Letter (SVP-23-007, Quad Cities, 2023) ML23079A2282023-02-0808 February 2023 Post-Exam Review Comments (None) ML23020A4132023-01-23023 January 2023 Operator License Examination Approval - Quad Cities Nuclear Power Station, January 2023 ML23079A2072023-01-13013 January 2023 Form 2.3-4 Written Examination Quality Checklist (Quad Cities, 2023) ML23079A2042023-01-13013 January 2023 Form 2.3-2 Operating Test Quality Checklist (Quad Cities, 2023) ML23079A2032022-11-11011 November 2022 Licensee Proposed Exam Cover Letter (SVP-22-065, Quad Cities, 2023) ML23079A0842022-10-17017 October 2022 Form 3.4-1 Events and Evolutions Checklist (Quad Cities, 2023) ML23079A0432022-10-17017 October 2022 Form 2.3-1 Examination Outline Quality Checklist (Quad Cities, 2023).pdf ML23079A0272022-10-0505 October 2022 Licensee Outline Submittal Email (Quad Cities, 2023) ML22188A1752022-07-11011 July 2022 Confirmation of Initial License Examination RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000254/20213012021-08-23023 August 2021 NRC Initial License Examination Report 05000254/2021301; 05000265/2021301 ML22192A1952021-07-0909 July 2021 2021 QC Ile ES-403-1 Written Exam Quality Checklist ML22192A2032021-07-0909 July 2021 2021 QC Ile ES-301-7 Operating Test Review Worksheet-Final ML22192A1932021-07-0909 July 2021 2021 QC Ile ES-201-3 Security Agreement-Final ML22192A2052021-07-0909 July 2021 2021 QC Ile ES-401-9 Written Examination Review Worksheet-Final ML22192A2062021-07-0909 July 2021 2021 QC Ile Outline Submittal Comments ML22192A2042021-07-0909 July 2021 2021 QC Ile ES-401-4 Rejected KAs ML22192A1922021-07-0909 July 2021 2021 QC Ile ES-201-1 ML22192A1962021-06-22022 June 2021 2021 QC Ile Post-Exam Submittal Letter-06-22-2021 ML22193A1052021-06-14014 June 2021 2021 QC Ile Administered Simulator and Inplant JPMs-Final ML22193A2862021-06-14014 June 2021 2021 QC Ile Administered RO and SRO Written Exam-Final ML22193A2872021-06-14014 June 2021 2021 QC Ile Administered RO and SRO List of Reference Handouts-Final ML22193A0932021-06-14014 June 2021 2021 QC Ile Administered RO and SRO Admin JPMs-Final ML22193A1072021-06-14014 June 2021 2021 QC Ile Administered Simulator Scenarios-Final ML21152A1022021-06-0202 June 2021 Operator Licensing Examination Approval ML22193A2992021-05-0505 May 2021 2021 QC Ile ES-301-3 Operating Test Quality Checklist ML22193A3082021-05-0505 May 2021 2021 QC Ile Proposed RO and SRO Admin JPMs ML22193A3032021-05-0505 May 2021 2021 QC Ile ES-401-6 Written Exam Quality Checklist ML22193A3102021-05-0505 May 2021 2021 QC Ile Proposed Simulator and Inplant JPMs ML22193A3122021-05-0505 May 2021 2021 QC Ile Proposed Written Exam-RO and SRO ML22193A3002021-05-0505 May 2021 2021 QC Ile ES-301-4 Simulator Scenario Quality Checklist ML22193A3012021-05-0505 May 2021 2021 QC Ile ES-301-6 Competencies Checklist ML22193A3112021-05-0505 May 2021 2021 QC Ile Proposed Simulator Scenarios ML22193A3202021-04-0707 April 2021 2021 Quad-Cities Ile ES-301-2 RO and SRO Sim-Inplant Systems Outlines ML22193A3142021-04-0707 April 2021 2021 Quad-Cities Ile ES-201-2 Outline Quality Checklist ML22193A3162021-04-0707 April 2021 2021 Quad-Cities Ile ES-301-5 Transient and Event Checklists ML22193A3192021-04-0707 April 2021 2021 Quad-Cities Ile ES-301-1 RO and SRO Admin Topics Outlines ML22193A3222021-04-0707 April 2021 2021 Quad-Cities Ile ES-D-1 Scenario Outlines ML22193A3212021-04-0707 April 2021 2021 Quad-Cities Ile ES-401-1 and ES-401-3 2023-08-07
[Table view] |
Text
ES-301 Administrative Topics Outline Form ES-301-1 Facility: Quad Cities Date of Examination: May 31, 2011 Examination Level: RO SRO Operating Test Number: 09-01 Administrative Topic Type Describe activity to be performed (See Note) Code*
Perform One-Rod-Out Interlock Surveillance K/A: 2.1.44 Rating: 3.9/3.8 Knowledge of RO duties in the control room during fuel Conduct of Operations N, S handling such as responding to alarms from the fuel handling area, communications with the fuel storage facility, systems operated from the control room in support of fueling operations, and supporting instrumentation Evaluate License Maintenance Requirements K/A: 2.1.4 Rating: 3.3/3.8 Conduct of Operations D, P, R Knowledge of individual license operator responsibilities related to shift staffing, such as medical requirements, "no-solo"operation, maintenance of active license status, etc.
Review Quarterly SBLC Pump Flow Rate Test Equipment Control N, R K/A: 2.2.12 Rating: 3.7/4.1 Knowledge of surveillance procedures Disable NUMAC ARM channel K/A: 2.3.5 Rating: 2.9/2.9 Radiation Control N, R Ability to use radiation monitoring systems, such as fixed radiation monitors and alarms, portable survey instruments, personnel monitoring equipment, etc.
Emergency Procedures/Plan N/A N/A NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when 5 are required.
- Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank (< 3 for ROs; < 4 for SROs & RO retakes)
(N)ew or (M)odified from bank (> 1)
(P)revious 2 exams (< 1; randomly selected)
ES 301, Page 22 of 27 ES-301 Administrative Topics Outline Form ES-301-1 Facility: Quad Cities Date of Examination: May 31, 2011 Examination Level: RO SRO Operating Test Number: 09-01 Administrative Topic Type Describe activity to be performed (See Note) Code*
Review a Fire Impairment Permit Requiring Compensatory Actions Conduct of Operations D,S KA: 2.1.25 Rating: 3.9/4.2 Ability to interpret reference materials such as graphs, curves, tables, etc.
Use Procedures Related to shift staffing Conduct of Operations D, P, R K/A: 2.1.5 Rating: 2.9/3.9 Ability to us procedures related to shift staffing, such as minimum crew complement, overtime limitations, etc.
Verify Reactor Mode Change Requirements Equipment Control D,S,R KA: 2.2.12 Rating: 3.7/4.1 Knowledge of Surveillance Procedures Verify Liquid Radwaste River Discharge Permit Radiation Control D, R KA: 2.3.6 Rating: 2.0/3.8 Ability to approve release permits Classify a Security Event Emergency Procedures/Plan N, S KA: 2.4.41 Rating: 2.9/4.6 Knowledge of emergency action level thresholds and classifications.
NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when 5 are required.
- Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank (< 3 for ROs; < 4 for SROs & RO retakes)
(N)ew or (M)odified from bank (> 1)
(P)revious 2 exams (< 1; randomly selected)
ES 301, Page 22 of 27 ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Quad Cities Date of Examination: 05/31/2011 Exam Level: RO SRO-I SRO-U Operating Test Number: ILT 09-1 Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
Safety System / JPM Title Type Code*
Function
- a. SBLC, 211000 A4.06 3.9/3.9 A, D, S 1 Initiate Standby Liquid Control with RWCU Failure to Isolate
- b. RCIC 217000 A4.04 3.6/3.6 A, D, S 2 Manual Initiation of RCIC
- c. Reactor/Turbine Pressure Regulating System 241000 A 4.15 3.2/3.2 N, S 3 Adjust Turbine/Generator System Load Set
- d. Shutdown Cooling System 205000 A2.06 3.4/3.5 A, D, L, S 4 Place Shutdown Cooling in Operation with Spurious Group II
- e. A.C. Electrical Distribution 262001 A4.01 3.4/3.7 A, N, L, S 6 Energize 480 VAC Bus 15 With a Failure of the Normal Feed
- f. RPS, 212000 2.1.23 4.3/4.4 N, L, S 7 Bypass A Channel of the Reactor Mode Switch to Shutdown Scram
- g. RHR/LPCI Torus Cooling Mode 219000 A4.01 3.8/3.7 D, S 5 Shutdown Torus Cooling
- h. N/A In-Plant Systems (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
- i. Emergency Generators 264000 A2.08 3.3/3.7 A, D, E, R 6 Locally Startup a Diesel Generator With a Failure of the Vent Fan to Start
- j. Reactor Low Water Level 295031 EA1.11 4.1/4.1 D, E, R 2 Inject Water Into the RPV using the Condensate System Crosstie
- k. Fire Protection System 286000 K1.01 2.7/2.8 D, E, R 8 Align Fire Protection Water to SSMP Room Cooler
@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 (C)ontrol room (D)irect from bank <9 / <8 / <4 (E)mergency or abnormal in-plant >1 / >1 / >1 (EN)gineered safety feature - / - / > 1 (control room system (L)ow-Power / Shutdown >1 / >1 / >1 (N)ew or (M)odified from bank including 1(A) >2 / >2 / >1 (P)revious 2 exams <3/ <3 / < 2 (randomly selected)
(R)CA >1 / >1 / >1 (S)imulator