ML12270A411
Jump to navigation
Jump to search
| ML12270A411 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 12/20/2011 |
| From: | Operations Branch III |
| To: | Exelon Generation Co, Exelon Nuclear |
| References | |
| 50-461/11-301 | |
| Download: ML12270A411 (1) | |
Text
Outline and Operating Test Comments 1 l P a g e
- Outline Comments JPM Comments
- Admin JPMs General Make sure JPMs require more than filling in form with data and/or performing math calculations using a calculator. Want to be able to evaluate operator perform some type of assessment and/or evaluation of data, identify problem, then address appropriate Tech Spec, make notification or the like. The evolution must have significant consequence or safety significance.
Licensee: No, different task.
- Sysg NRC: We need a discriminating JPM that is not performed during scenarios. Make sure there are sufficient critical safety significant steps that require operator action and significant consequences to not performing those actions correctly.
Licensee: Believe there are sufficient critical steps and significant operator actions.
Scenario Comments