2011 Clinton Power Station Initial License Examination Operating Test Comments
ML12270A411
Person / Time
Site: Clinton Constellation icon.png
Issue date: 12/20/2011
From:
Operations Branch III
To:
Exelon Generation Co, Exelon Nuclear
References
50-461/11-301
Download: ML12270A411 (1)


Text

Outline and Operating Test Comments 1 l P a g e

  • Outline Comments JPM Comments
  • Admin JPMs General Make sure JPMs require more than filling in form with data and/or performing math calculations using a calculator. Want to be able to evaluate operator perform some type of assessment and/or evaluation of data, identify problem, then address appropriate Tech Spec, make notification or the like. The evolution must have significant consequence or safety significance.
  • Sysb NRC: 2009 exam had RCIC Start With Initiation Signal Present, is this same JPM?

Licensee: No, different task.

  • Sysg NRC: We need a discriminating JPM that is not performed during scenarios. Make sure there are sufficient critical safety significant steps that require operator action and significant consequences to not performing those actions correctly.

Licensee: Believe there are sufficient critical steps and significant operator actions.

Scenario Comments