UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 September 18, 2012 Name of Licensee:
Entergy Nuclear Palisades, LLC - Michigan Name of Facility:
Palisades Nuclear Plant Docket No:
50-255 Date and Time of Meeting: Monday, October 1, 2012, at 1:00 - 2:00 P.M. (CDT)
Location of Meeting:
2443 Warrenville Road Lisle, IL 60532 Purpose of Meeting:
The U.S. Nuclear Regulatory Commission (NRC) will discuss with the public the preliminary results from the Special Inspection Team that was sent to Palisades to evaluate the Palisades Nuclear Plant Control Rod Drive Mechanism (CRDM) 24 housing leak. The NRC will also respond to questions.
Meeting Category:
This is a Category 3 meeting. The NRC staff will hold a two part meeting. The first part of the meeting will be a Webinar discussion by the NRC with observation by members of the public.
The second part of the meeting will be an open discussion, between the NRC and the public, on the topic of the CRDM 24 housing and the NRCs regulatory process.
Interested members of the public can participate in this meeting via a Webinar. Webinar seats must be reserved before September 29, 2012, in order to participate, at:
https://www2.gotomeeting.com/register/977718426.
After registering, you will receive a confirmation email containing information about joining the Webinar.
The following are the system requirements for the Webinar:
PC-based attendees:
Required: Windows 7, Vista, XP or 2003 Server Macintosh-based attendees:
Required: Mac OS X 10.5 or newer Mobile attendees:
Required: iPhone/iPad/Android' smartphone or tablet For details please call Swetha Shah at 630-829-9608; or email at Swetha.Shah@nrc.gov by September 29, 2012.
Notice of Significant Meeting Expected NRC Attendees:
C. Casto, Regional Administrator, RIII G. Shear, Deputy Director, Division of Reactor Projects, RIII J. Giessner, Chief, Branch 4, Division of Reactor Projects, RIII T. Taylor, Senior Resident Inspector, Palisades A. Scarbeary, Resident Inspector, Palisades D. Alley, Senior Materials Engineer, Piping and NDE Branch, Nuclear Reactor Regulation Others as designated Other Attendees:
None Note: The Nuclear Regulatory Commission provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice, or the transcript of other information from the meeting in another format (e.g., Braille, large print), please notify the NRC meeting contact no later than 2 business days prior to the meeting. Attendance at this meeting should be made known by September 29, 2012, via telephone to the NRC meeting contact.
Meeting
Contact:
Swetha Shah (630) 829-9608 Swetha.Shah@nrc.gov Approved by:____/RA/_______________
John B. Giessner, Chief Branch 4 Division of Reactor Projects
Notice of Significant Meeting Expected NRC Attendees:
C. Casto, Regional Administrator, RIII G. Shear, Deputy Director, Division of Reactor Projects, RIII J. Giessner, Chief, Branch 4, Division of Reactor Projects, RIII T. Taylor, Senior Resident Inspector, Palisades A. Scarbeary, Resident Inspector, Palisades D. Alley, Senior Materials Engineer, Piping and NDE Branch, Nuclear Reactor Regulation Others as designated Other Attendees:
None Note: The Nuclear Regulatory Commission provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice, or the transcript of other information from the meeting in another format (e.g., Braille, large print), please notify the NRC meeting contact no later than 2 business days prior to the meeting. Attendance at this meeting should be made known by September 29, 2012, via telephone to the NRC meeting contact.
Meeting
Contact:
Swetha Shah (630) 829-9608 Swetha.Shah@nrc.gov Approved by:_________/RA/__________
John B. Giessner, Chief Branch 4 Division of Reactor Projects DOCUMENT NAME: G:\\DRPIII\\PALI\\Palisades Webinar Meeting Notice.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME SShah:dtp JGiessner DATE 09/18/12 09/18/12 OFFICIAL RECORD COPY
Notice of Significant Meeting DISTRIBUTION:
Silas Kennedy, Region III Coordinator, OEDO Allen Howe, Deputy Director, Division of Operating Reactor Licensing (DORL), NRR RidsNrrPMPalisades Resource RidsNrrDorlLpl3-1 Resource Gary Shear, Acting Director, Division of Reactor Projects, RIII Steven Reynolds, Director, Division of Reactor Safety, RIII Kenneth OBrien, Acting Deputy Director, Division of Reactor Projects, RIII Richard Skokowski, Acting Deputy Director, Division of Reactor Safety, RIII DRP Branch Chief SRI, Palisades DRS Branch Chiefs:
Robert Daley David Hills AnnMarie Stone Billy Dickson Hironori Peterson Allan Barker, Regional State Liaison Officer, RIII PMNS Viktoria Mitlyng, RIII Public Affairs Prema Chandrathil Tammy Tomczak, ORA Patricia Buckley, ORA Marjorie Zerth, DRP