MONTHYEARML24009A1152024-01-29029 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L 2023 LLE-0043 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML24022A0652024-01-22022 January 2024 Senior Reactor and Reactor Operator Initial License Examinations L-2024-003, NextEra Energy Seabrook, LLC - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report2024-01-11011 January 2024 NextEra Energy Seabrook, LLC - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report ML23312A1822023-12-22022 December 2023 Issuance of Amendment No. 172 Revision to Cooling Tower Service Water Loop or Cell Requirements L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-180, Submittal of Changes to the Technical Specification Bases2023-12-13013 December 2023 Submittal of Changes to the Technical Specification Bases L-2023-177, Supplement to Seabrook Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Seabrook Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-160, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Final Rule ML23318A0772023-11-14014 November 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000443/2024011 IR 05000443/20234032023-11-0707 November 2023 Security Baseline Inspection Report 05000443/2023403 and Independent Spent Fuel Storage Installation 07200063/2023401 IR 05000443/20230032023-11-0606 November 2023 Integrated Inspection Report 05000443/2023003 IR 05000443/20230102023-10-19019 October 2023 Triennial Fire Protection Inspection Report 05000443/2023010 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23275A0522023-10-0202 October 2023 Requalification Program Inspection IR 05000443/20234012023-09-0808 September 2023 Cybersecurity Inspection Report 05000443/2023401 (Cover Letter Only) IR 05000443/20234202023-09-0505 September 2023 Security Baseline Inspection Report 05000443/2023420 IR 05000443/20230052023-08-31031 August 2023 Updated Inspection Plan for Seabrook Station (Report 05000443/2023005) L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update IR 05000443/20233022023-08-16016 August 2023 Operator Licensing Retake Examination Report 05000443/2023302 IR 05000443/20230022023-08-0808 August 2023 Integrated Inspection Report 05000443/2023002 L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment L-2023-104, Preparation and Scheduling of Operator Licensing Examinations2023-08-0303 August 2023 Preparation and Scheduling of Operator Licensing Examinations L-2023-103, Inservice Inspection Examination Report2023-08-0303 August 2023 Inservice Inspection Examination Report ML23192A0782023-07-11011 July 2023 Operator Licensing Retake Examination Approval L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) SBK-L-23053, Radiological Emergency Plan (Ssrep), Revision 802023-06-22022 June 2023 Radiological Emergency Plan (Ssrep), Revision 80 ML23157A0722023-06-0606 June 2023 Notification of Conduct of a Fire Protection Team Inspection L-2023-074, Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update2023-06-0202 June 2023 Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal IR 05000443/20233012023-05-15015 May 2023 Initial Operator Licensing Examination Report 05000443/2023301 L-2023-064, License Amendment Request 23-01, Revision 1, Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves2023-05-11011 May 2023 License Amendment Request 23-01, Revision 1, Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves IR 05000443/20230012023-05-11011 May 2023 Integrated Inspection Report 05000443/2023001 ML23129A0312023-05-0909 May 2023 Reactor Operator Retake License Examination ML23117A3652023-05-0404 May 2023 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request to Remove Period of Applicability from PTL and Low Temperature Over Pressure Protection Curves SBK-L-23044, 2022 Annual Radiological Environmental Operating Report2023-04-28028 April 2023 2022 Annual Radiological Environmental Operating Report SBK-L-23031, 2022 Annual Radioactive Effluent Release Report2023-04-28028 April 2023 2022 Annual Radioactive Effluent Release Report SBK-L-23033, 2022 Annual Environmental Operating Report2023-04-11011 April 2023 2022 Annual Environmental Operating Report L-2023-053, Core Operating Limits Report for Cycle 232023-04-0505 April 2023 Core Operating Limits Report for Cycle 23 ML23088A1522023-03-29029 March 2023 Summary of Meeting Between Nrc/Region I and C-10 - Questions Regarding Seabrook 4Q2022 Inspection Report L-2023-021, Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2023-03-28028 March 2023 Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2023-03-27027 March 2023 and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications ML23073A1562023-03-23023 March 2023 Relief Request 4RA-22-01, Relief from the Requirements of the ASME Code L-2023-012, License Amendment Request 23-01, Remove Period of Applicability (Poa) from Pressure Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves2023-03-15015 March 2023 License Amendment Request 23-01, Remove Period of Applicability (Poa) from Pressure Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves L-2023-025, Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-12023-03-15015 March 2023 Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-1 L-2023-029, and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3)2023-03-10010 March 2023 and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2023-023, Revised Steam Generator Tube Inspection Report2023-03-0303 March 2023 Revised Steam Generator Tube Inspection Report ML23020A1002023-03-0303 March 2023 OEDO-22-00419 - 2.206 Petition for Seabrook Station Structure Concrete Concerns (EPID L-2022-CRS-0000)- Closure Letter 2024-01-29
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSYLVANIA 19406-2713 September 12, 2012 Mr. William M. Craft Chairman, Board of Selectmen Town of Ipswich Town Hall 25 Green Street Ipswich, MA 01938
Dear Mr. Craft:
On behalf of the U.S. Nuclear Regulatory Commission (NRC), I am responding to your letter dated August 6, 2012. Specifically, as Chairman of the Board for the Town of Ipswich, you and the selectmen expressed concerns regarding the concrete degradation noted at Seabrook Station due to an Alkali-Silica Reaction (ASR), and urged the agency to take steps to fully address the matter to ensure the safety of the public in the future. You also expressed concerns regarding NextEras performance during their Seabrook Biennial Full-Scale Emergency Exercise that was conducted on April 17, 2012.
The NRC continues to thoroughly evaluate the ASR technical issue. We have been conducting inspections and technical reviews to evaluate and assess this issue, and the NRC has concluded that, despite the observed degradation, the structures affected by ASR remain able to perform their safety-related functions. The license renewal schedule has and will continue to be impacted because no decision can be made until the extent of the longer-term implications of the concrete degradation and the effectiveness of any remedies are fully understood.
On May 16, 2012, the NRC issued NextEra a Confirmatory Action Letter (CAL) that formally documents commitments the licensee has made to the NRC to address the ASR issue. The CAL (attached) will remain in effect until the NRC has concluded that all actions listed in the CAL have been satisfactorily completed and an acceptable basis has been established to assure that the continued operability of concrete structures will be maintained. The NRC staff will hold a public meeting sometime later this year to inform the public of the status its review of the information provided in response to the CAL. The meeting will be held at a location near Seabrook Station. A public meeting notice will be issued when that meeting has been scheduled.
With respect to the concerns you raised regarding the Seabrook Biennial Full-Scale Emergency Exercise, I would like to provide you with some general background on the conduct of a nuclear power plants emergency exercises. In accordance with the NRCs Code of Federal Regulations, 10 CFR 50.47(b)(14), owners (licensees) of nuclear power plants are required to conduct a full-scale emergency exercise every two years. Likewise, State and local agencies located within the 10 mile Emergency Planning Zone (EPZ) are also required to exercise their offsite emergency plans every two years. The onsite and offsite exercises are generally conducted together. The NRC does not sponsor the exercise, and the licensee is responsible to develop the exercise scenario.
Town of Ipswich 2 Board of Selectmen The NRC independently inspects the licensees exercise performance to evaluate their capability to respond to a simulated nuclear accident. The Federal Emergency Management Agency evaluates the performance of the State and local officials. An emergency exercise is an opportunity for the licensee to perform their emergency response functions and to identify and correct any weaknesses in their performance. As is the nature of training exercises, weaknesses may occur; however, it is required that these weaknesses be identified during the post-exercise critiques and corrected. It is through the identification and correction of such weaknesses that the licensee improves its ability to respond to an actual event. Therefore, the NRC places a high degree of import on the ability of licensees to identify any exercise weaknesses.
During the April 17, 2012, Seabrook exercise, the NRC inspection team identified that NextEra did not independently identify an exercise weakness during their post-exercise critique that involved errors in the development of the protective action recommendation (PAR) generated immediately after the declaration of a General Emergency (GE). Specifically, at the time of the GE declaration, a simulated radiological release was not in progress. Due to a human error while using an emergency response procedure, the licensee incorrectly developed a PAR as if a release was in progress. This impacted the identification of which sectors within the 10 mile EPZ would be recommended for evacuation. While delivering the incorrect PAR to the States, the licensee identified a simulated radiological release had begun so the incorrect PAR became correct. Therefore, the error would ultimately not have impacted the States ability to make an adequate protective action decision.
However, as stated earlier, the identification and subsequent correction of exercise weaknesses is a important aspect of these training exercises. The licensees failure to identify this issue during their post-exercise critique did not provide the necessary assurance to the NRC that the issue would be entered into the licensees corrective action system to prevent recurrence.
Attached for your information is the NRCs final significance determination letter issued on August 7, 2012. A follow-up NRC inspection will be conducted to ensure the licensee takes the appropriate corrective actions regarding the exercise weakness.
Thank you for your interest in these matters. The agency certainly shares your concern with ensuring the safety of the Seabrook Station. Through the efforts of our onsite resident inspectors and implementation of a comprehensive inspection program, the NRC has continuous oversight of the licensees activities. The NRC holds the licensee accountable for ensuring that the plant is operated in a safe manner and that its emergency response program is maintained in a constant state of readiness for protecting the public health and safety.
Town of Ipswich 3 Board of Selectmen If you have further questions, please feel free to contact Ms. Nancy McNamara, Regional State Liaison Officer at (610) 337-5337.
Sincerely,
/RA/
William M. Dean Regional Administrator
Enclosures:
As stated
ML12256B044 ADAMS Package Accession No.: ML12249A106 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/ORA RI/DRS RI/DRS RI/DRP RI/DRS NAME NMcNamara (NTM) RConte (RJC) SBarr (STB) ABurritt (ALB) RMcKinley-w/comments DATE 9/5/12 9/5/12 9/5/12 9/5 /12 9/5/12 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRS NRR/DLR OGC RI/RA NAME CMiller (cgm) ACununan* MSpencer* WDean (WMD)
DATE 9/10/12 9/6/12 9/6 /12 9/ 11/12