2012 D. C. COOK NUCLEAR PLANT INITIAL LICENSE EXAMINATION PROPOSED EXAM FILES
5 INDIANA MICHIGAN Indiana Michigan Power fJOWEII One Cook Place Bridgman, MI 49106 Aunit ofAmerican Electric Power IndianaMichiganPower.com JUN 042012 June 1,2012 U. S, Nuclear Regulatory Commission Attn: Mr. Carl J. Moore Region III Examiner 2443 Warrenville Road, Suite 210 Lisle, Illinois 60532-4352 Donald C. Cook Nuclear Plant Units 1 and 2 2012 INITIAL LICENSE EXAMINATION Enclosed you will find a copy of the Initial License Examination for the planned July/August 2012 Examination at Donald C. Cook Nuclear Plant (CNP). Also enclosed is the proposed examination schedule, based on 3 Senior Reactor Operator Instants (SRO)-(I), 3 SRO Upgrades (U), and 8 Reactor Operator (RO) candidates.
The examination has been prepared in accordance with NUREG 1021, Revision 9, Supplement 1.
The following items are enclosed in the sealed envelope:
- 1)
ES-201-3 Examination Security Agreement Forms
- 2)
ES-301-1 Administrative Topics (JPM) Outline Form (SRO)
- 3)
ES-301-1 Administrative Topics (JPM) Outline Form (RO)
- 4)
ES-301-1 Admin JPM Exams a) 2012 NRC-A1a-RO b) 2012 NRC-A1a-SRO c) 2012 NRC-A1b d) 2012 NRC-A2-RO e) 2012 NRC-A2-SRO f) 2012 NRC-A3 g) 2012 NRC-A4-SRO
- 5)
ES-301-2 Control Room/In-Plant Systems (JPM) Outline Form (SRO-I)
- 6)
ES-301-2 Control Roomlln-Plant Systems (JPM) Outline Form (SRO-U)
- 7)
ES-301-2 Control Roomlln-Plant Systems (JPM) Outline Form (RO)
- 8)
ES-301-2 System JPM Exams a) 2012 NRC-SIM01 b) 2012 NRC-SIM02 c) 2012 NRC-SIM03 d) 2012 NRC-SIM04 e) 2012 NRC-SIM05 f) 2012 NRC-SIM06 g) 2012 NRC-SIM07 h) 2012 NRC-SIM08 i) 2012 NRC-INP01 j) 2012 NRC-INP02
U. S. Nuclear Regulatory Commission JUN 04 2012 June 1,2012 Page 2 k) 2012 NRC-INP03
- 9)
ES-301-3 Operating Test Quality Checklist Form
- 10)
Scenario Exams with Forms ES-D-1 &D-2 Forms:
a)
NRC2012-01 b) f\\lRC2012-02 c)
NRC2012-03 d)
NRC2012-04
- 11)
ES-301-4 Simulator Scenario Quality Checklist Form
- 12)
ES-301-S Transient and Event Checklist Form - Crew 1
- 13)
ES-301-S Transient and Event Checklist Form - Crew 2
- 14)
ES-301-S Transient and Event Checklist Form - Crew 3 1S)
ES-301-S Transient and Event Checklist Form - Crew 4
- 16)
ES-301-S Transient and Event Checklist Form - Crew S
- 17)
ES-301-6 Competencies Checklist Form - Crew 1
- 18)
ES-301-6 Competencies Checklist Form - Crew 2
- 19)
ES-301-6 Competencies Checklist Form - Crew 3
- 20)
ES-301-6 Competencies Checklist Form - Crew 4
- 21)
ES-301-6 Competencies Checklist Form - Crew 5
- 22)
ES-401-6 Written Examination Quality Checklist Form
- 23)
CNP 2012 Written Examination Attachments
- 24)
CNP 2012 NRC Written Examination (100 questions with references)
A hard copy of the examination materials is provided for your review. A complete electronic copy of documents without initials or signatures or other handwritten notations for the Public Document Room (ADAMS) has also been provided. This contains the full outline (previously submitted) and electronic PDF versions of the RO and SRO examinations that are to be administered.
None of these materials are to go to the Public Document Room (ADAMS) until after the examination has been completed.
If you have any comments or concerns, please contact Ted Werk or Steve Pettinger at (269) 465-S901, extension 3738, or myself at (269) 466-3407.
Sincerely,
~E Brian E. Evans Operations Training Manager TCW/jen Enclosures
ES-301 Operating Test Quality Checklist Form ES-301-3
.Facility: U. c. tODK Date of Examination: 1-/;v.;, J201Z Operating Test ~~be~~i8 Initials
- 1. General Criteria a
b*
C#
- a.
The operating test conforms with the previously approved outline; changes are consistent with sampling reQuirements (e.(I., 10 CFR 55.45, operational importance safety function distribution). p KO ~
- b.
There is no day-to-day repetition between this and other operating tests to be administered during this examination.
~ !~O ~
- c.
The operatin(l test shall not duplicate items from the applicants' audit test(s). (see Section D.1.a.)
~ I~& q",
- d.
Overlap with the written examination and between different parts of the operating test is within acceptable limits.
,Jvj KB 4vt
- e.
It appears that the operating test will differentiate between competent and less*than-competent applicants at the designated license level.
~ K& ~
- 2. Walk-Through Criteria
- a.
Each JPM includes the following, as applicable:
initial conditions
- *
- initiating cues references and tools, including associated procedures reasonable and validated time limits (average time allowed for completion) and specific designation if deemed to be time-critical by the facility licensee operationally important specific performance criteria that include:
detailed expected actions with exact criteria and nomenclature system response and other examiner cues statements describing important observations to be made by the applicant criteria for successful completion of the task identification of critical steps and their associated performance standards r;B
~ ~
restrictions on the seQuence of steps, if applicable
- b.
Ensure that any changes from the previously approved systems and administrative walk-through outlines (Forms ES-301-1 and 2) have not caused the test to deviate from any of the acceptance criteria (e.g., item distribution, bank use, repetition from the last 2 NRC examinations) specified
.J,J
~
X3 on those forms and Form ES-201-2.
- 3. Simulator Criteria associated simulator operating tests (scenario sets) have been reviewed in accordance with
~
4tf Kt3 ES-301-4 and a copy is attached.
-1~ We:;tedra~;:(;:
Date
- a.
Author 5J2'f/2bl2.
- b.
Facility Reviewer(')
Ku.l(T ~f'.fA,u / ~----
-5L30LaOI1J...
- c.
NRC Chief Examiner ~c,I"f!!AiL Mat2e. l~
1!13l!Z.
- d.
NRCSUperviSOi.2i., ~~ 1S-\\CI:.)tit..."It...*L ~:.c.~ gJ.
7f~I-I~
It?'
.r NOTE:
The facility signature is not applicable for NRC-developed tests.
Independent NRC reviewer initial items in Column "c"; chief examiner concurrence reouired.
ES-301, Page 24 of 27
ES-301 Simulator Scenario Quality Checklist Form ES-301-4 Facilty: O.C. COOK Date of ExaJ(?-3ftz. Scenario Numbers: I 11,1'71 tt Operating Test No.: AJRc.. Ro"lB
- 1.
- 2.
- 3.
- 4.
- 5.
- 6.
- 7.
- 8.
- 9.
- 10.
- 11.
- 12.
- 13.
- 1.
- 2.
- 3.
- 4.
- 5.
- 6.
- 7.
QUALITATIVE ATTRIBUTES The initial conditions are realistic, in that some equipment and/or instrumentation may be out of service, but it does not cue the operators into expected events.
The scenarios consist mostly of related events.
Each event description consists of the point in the scenario when it is to be initiated the malfunction(s) that are entered to initiate the event the symptoms/cues that will be visible to the crew the expected operator actions (by shift position) the event termination point (if applicable)
No more than one non-mechanistic failure (e.g., pipe break) is incorporated into the scenario without a credible preceding incident such as a seismic event.
The events are valid with regard to physics and thermodynamics.
Sequencing and timing of events is reasonable, and allows the examination team to obtain complete evaluation results commensurate with the scenario objectives.
If time compression techniques are used, the scenario summary clearly so indicates.
Operators have sufficient time to carry out expected activities without undue time constraints.
Cues are given.
The simulator modeling is not altered.
The scenarios have been validated. Pursuant to 10 CFR 55.46(d), any open simulator performance deficiencies or deviations from the referenced plant have been evaluated to ensure that functional fidelity is maintained while running the planned scenarios.
Every operator will be evaluated using at least one new or significantly modified scenario.
All other scenarios have been altered in accordance with Section 0.5 of ES-301.
All individual operator competencies can be evaluated, as verified using Form ES-301-6 (submit the form along with the simulator scenarios).
Each applicant will be significantly involved in the minimum number of transients and events specified on Form ES-301-5 (submit the form with the simulator scenarios).
The level of difficulty is appropriate to support licensing decisions for each crew position.
Target Quantitative Attributes (Per Scenario; See Section D.S.d)
Actual Attributes Total malfunctions (5-8)
-:j 17 I tz I "7 Malfunctions after EOP entry (1-2) 2 1]../7-/2 Abnormal events (2-4) 4 Itf I 4/L/
Major transients (1-2)
I I I I 2-1 I EOPs entered/requiring substantive actions (1-2)
[
11-1 I I I EOP contingencies requiring substantive actions (0-2)
I I, I bl D Critical tasks (2-3)
b*
c#
ES-401 Written Examination Quality Checklist Form ES-401*6 J
II Fa(::ility:D,C, COoK Date of Exam:'/2¢./1-0 12.
Exam Level: RO [S1 SRO E{f I Item Description a
I.J.A
- 1.
Questions and ansllllers are technically accurate and applicable to the facilitv.
- 2.
- a.
NRC KlAs are referenced for all questions.
- b.
Facility learnina obiectives are referenced as available.
~ ~l3 ~
~ Ki3 ~
- 3.
SRO Questions are appropriate in accordance with Section D.2.d of ES-401 I 4.
The sampling process was random and systematic (If more than 4 RO or 2 SRO questions were repeated from the last 2 NRC licensino exams, consult the NRR OL oroaramoffice).
J.A>
K13 a
- 5.
Question duplication from the license screening/audit exam was controlled as)ndicated below (check the item that applies) and appears appropriate:
~ the audit exam was systematically and randomly developed; or
_ the audit exam was completed before the license exam was started; or
_ the examinations llllere developed independently; or
~the licensee certifies that there is no duplication; or
_ other (explain)
- 6.
Bank use meets limits (no more than 75 percent I~nk Modified'14J.'1ew from the bank, at least 10 percent new, and the rest
~.
~.
new or mooified); enter the actual RO I SRO-only A..... ~t'J. 'i: 57:.1-1
~ ~ ~~5)D I I...
ouestion distribution(s) at riqht.
.... ".J? 15<
- z.~'
v,v.;
- 7.
Betlllleen 50 and 60 percent of the questions on the RO exam are written at the comprehension! analysis level; the SRO exam may exceed 60 percent if the randomly selected KlAs support the higher cognitive levels; enter the actual RO I SRO question distribution(s) at right.
Initial b*
c" 1.13 ~I
=-
~
- 8.
Referenceslhandouts provided do not give away ansllllers or aid in the elimination of distractors.
- 9.
Question content conforms with specific KIA statements in the previously approved examination outline and is appropriate for the tier to which they are assigned; deviations are justilied.
- 10.
Question psychometric Quality and format meet the auidelines in ES Appendix B.
- 11.
The exam contains the required number of one-point, multiple choice items; the total is correct and aarees with the value on the cover sheet.
. Printed Name / ¥ill!'!.ature
- a. """,,-reoi I..,.,...,~ ~
- b. Facility Reviewer (*)
. Itt(,2-1~1
- c. NRC Chief Examiner (#~ II Q d NRCR""onaIS,pe""",,10 ~/,)-J!t£J;~=_
Note:
- The facility reviellller's initials/signature are not applicable for NRC-developed examinations.
- Independent NRC reviewer initial items in Column "c*; chief examiner concurrence reauired.
Date
- IZqIZlJ/2.,
5/'0/1'2