UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 September 4, 2012 Mr. Ron Clary Vice President, New Nuclear Deployment South Carolina Electric and Gas Company P.O. Box 88 (Mail Code P40)
Jenkinsville, SC 29065-0088
SUBJECT:
MID-CYCLE ASSESSMENT LETTER FOR VIRGIL C. SUMMER NUCLEAR STATION UNITS 2 AND 3 (NRC INSPECTION REPORT NOS.
05200027/2012006 AND 05200028/2012006)
Dear Mr. Clary:
On August 9, 2012, the U. S. Nuclear Regulatory Commissioner (NRC) completed its mid-cycle performance review of Virgil C. Summer (VCS) Nuclear Station Units 2 and 3. The NRC reviewed the most recent inspection results and enforcement actions from January 1, 2012, through June 30, 2012. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
The NRC determined the performance at VCS Nuclear Station Units 2 and 3 during the most recent quarter was within the Licensee Response Column of the NRC=s Construction Reactor Oversight Process (cROP) Action Matrix because all inspection findings had very low (i.e.,
green) safety significance. Therefore, the NRC plans to conduct cROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through December 31, 2012.
Routine inspections performed by construction resident inspectors are not included in the inspection plan. The inspections listed are tentative and may be revised based on construction activities occurring at the site. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
R. Clary 2
Please contact me at (404)997-4540 with any questions you have regarding this letter or inspection plan.
Sincerely,
/RA/
Michael E. Ernstes, Chief Construction Projects Branch 4 Division of Construction Projects Docket Nos.: 05200027, 05200028 Combined Licenses Numbers: NPF-93 (Unit 2), NPF-94 (Unit 3)
Enclosure:
V. C. Summer Inspection Plan cc w/encl.: (See next page)
R. Clary 2
Please contact me at (404)997-4540 with any questions you have regarding this letter or inspection plan.
Sincerely,
/RA/
Michael E. Ernstes, Chief Construction Projects Branch 4 Division of Construction Projects Docket Nos.: 05200027, 05200028 Combined Licenses Numbers: NPF-93 (Unit 2), NPF-94 (Unit 3)
Enclosure:
V. C. Summer Inspection Plan cc w/encl.: (See next page)
- PUBLICLY AVAILABLE G NON-PUBLICLY AVAILABLE G SENSITIVE
- NON-SENSITIVE ADAMS: # Yes ACCESSION NUMBER: ML12243A446__
- SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII:DCP RII:DCP SIGNATURE JK TS NAME J. Kent T. Steadham DATE 8/20/12 8/21/12 E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICIALRECORD COPY DOCUMENT NAME: G:\\CCI\\DCP\\CPB4\\MID AND END OF CYCLE\\MID-CYCLE LETTER 2012.DOCX
R. Clary 3
cc w/encl.:
Mr. Jeffrey B. Archie Sr. Vice President, Nuclear Operations South Caroline Electric & Gas Company MC D304 220 Operation Way Cayce, SC 29033-3172 Ms. Michele Boyd Legislative Director Energy Program Public Citizens Critical Mass Energy and Environmental Program 215 Pennsylvania Avenue, SE Washington, DC 20003 Chairman Fairfield County Council Drawer 60 Winnsboro, SC 29180 Ms. Shannon Bowyer Hudson Office of Regulatory Staff State of South Carolina 1401 Main Street Suite 900 Columbia, SC 29201 Mr. George McKinney Director South Caroline EMD 1100 Fish Hatchery Road West Columbia, SC 29172 Ms. Gidget Stanley-Banks Director Allendale County EPA 426 Mullberry Street Allendale, SC 29810
R. Clary 4
Email amonroe@scana.com (Amy Monroe)
APAGLIA@Scana.com (Al Paglia)
APH@NEI.org (Adrian Heymer) arice@scana.com (April R. Rice) awc@nei.org (Anne W. Cottingham) bedforbj@westinghouse.com (Brian Bedford)
Bill.Jacobs@gdsassociates.com (Bill Jacobs) bmccall@santeecooper.com (Bill McCall, Jr.)
BrinkmCB@westinghouse.com (Charles Brinkman)
CumminWE@Westinghouse.com (Edward W. Cummins) cwaltman@roe.com (C. Waltman) david.lewis@pillsburylaw.com (David Lewis) dgriffin@scana.com (Donna S. Griffin) ed.burns@earthlink.net (Ed Burns) fbelser@regstaff.sc.gov gzinke@entergy.com (George Alan Zinke) jarchie@scana.com (Jeffrey B. Archie) jenkinse@dhec.sc.gov (Susan Jenkins) jflitter@regstaff.sc.gov Joseph_Hegner@dom.com (Joseph Hegner) kasslc@westinghouse.com (Leslie Kass) kinneyrw@dhec.sc.gov (Ronald Kinney)
KSutton@morganlewis.com (Kathryn M. Sutton) kwaugh@impact-net.org (Kenneth O. Waugh) lchandler@morganlewis.com (Lawrence J. Chandler) maria.webb@pillsburylaw.com (Maria Webb) mark.beaumont@wsms.com (Mark Beaumont) matias.travieso-diaz@pillsburylaw.com (Matias Travieso-Diaz) media@nei.org (Scott Peterson) mike_moran@fpl.com (Mike Moran)
MSF@nei.org (Marvin Fertel) nirsnet@nirs.org (Michael Mariotte)
Nuclaw@mindspring.com (Robert Temple) patriciaL.campbell@ge.com (Patricia L. Campbell)
Paul@beyondnuclear.org (Paul Gunter) pbessette@morganlewis.com (Paul Bessette) porterhj@dhec.sc.gov (Henry Porter) rclary@scana.com (Ronald Clary)
RJB@NEI.org (Russell Bell) rwhite@scana.com (Robin White) sabinski@suddenlink.net (Steve A. Bennett) sbyrne@scana.com (Stephen A. Byrne) sfrantz@morganlewis.com (Stephen P. Frantz) shudson@regstaff.sc.gov (Shannon Hudson)
R. Clary 5
Email contd stephan.moen@ge.com (Stephan Moen)
TGATLIN@scana.com (Thomas Gatlin) threatsj@dhec.sc.gov (Sandra Threatt) tom.miller@hq.doe.gov (Tom Miller)
TomClements329@cs.com (Tom Clements)
Vanessa.quinn@dhs.gov (Vanessa Quinn) vcsnrc@scana.com (NRC Senior Resident Inspector)
Wanda.K.Marshall@dom.com (Wanda K. Marshall) wmcherry@santeecooper.com (Marion Cherry)
Letter to Ron Clary from Michael E. Ernstes, dated September 4, 2012
SUBJECT:
MID-CYCLE ASSESSMENT LETTER FOR VIRGIL C. SUMMER NUCLEAR STATION UNITS 2 AND 3 (NRC INSPECTION REPORT NOS.
05200027/2012006 AND 05200028/2012006)
Distribution:
ROPassessment Resource NRO_cROP Resource T. Fredette, NRO D. McGovern, NRO J. Munday, RII R. Haag, RII C. Ogle, RII J. Yerokun, RII M. Ernstes, RII D. Ayres, RII M. Lesser, RII K. ODonohue, RII S. Freeman, RII T. Steadham, RII J. Kent, RII R. Jackson, RII Summer Units 2 & 3 SRI P. Donnelly, RII Summer Units 2 & 3 RI M. Magee, RII Summer Units 2 & 3 RI PUBLIC
V. C. Summer Inspection Plan Enclosure Programmatic Inspections (IMC 2504)
Est. Date Description 4Q 2012 Construction QA Semiannual Implementation 4Q 2012 Corrective Action Program Annual Inspection ITAAC Inspections (IMC 2503)
Est. Date Description 2012 The majority of Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) related inspections, in 2012, are expected to be associated with the following construction and fabrication activities:
- 1. Foundation and waterproof membrane installation
- 2. Containment vessel fabrication
- 3. Nuclear Island construction
- 4. Structural and mechanical module fabrication The NRC staff will also inspect miscellaneous ITAAC and Design Acceptance Criteria activities (e.g. Protection and Safety Monitoring System and Human Factors Engineering development, type tests, and other ITAAC related work on site and at vendor facilities).
3Q-4Q 2012 Rebar Work Associated with:
The NI Unit 2 Containment Vessel CR-10 3Q-4Q 2012 Submodule Fabrication in the MAB 3Q-4Q 2012 Unit 2 CV Fabrication 4Q 2012 NI Basemat Pour 4Q 2012 Reactor Pressure Vessel Receipt Inspection Note: Inspection schedule is subject to change based on licensing and construction activities.