Letter Sequence Other |
---|
|
Results
Other: CY-12-008, Connecticut Yankee Atomic Power Co., Reply to Notice of Violation, EA-2011-284, ML12027A200, ML12027A204, ML120300184, ML120300201, ML120300334, ML120300360, ML12066A038, ML12066A040, ML12081A248, ML12082A012, ML12082A029, ML12124A372, ML12124A373, ML12124A374, ML12125A042, ML12157A472, ML12157A476, ML12157A477, ML12226A232, ML12226A297, ML12226A479
|
MONTHYEARML11166A1242011-06-0808 June 2011 Response to Second Request (Part 2) for Additional Information for Application for NRC Consent to Indirect License Transfer/Threshold Determination - Merger of Northeast Utilities and Nstar Project stage: Request ML11195A3392011-07-13013 July 2011 Morgan Lewis on Behalf of Northeast Utilities and Nstar - Submittal of Supplemental Response to Requests for Additional Information and Negation Action Plan Project stage: Supplement ML1119600612011-07-14014 July 2011 Ltr. to W. Norton Request for Exemption from 10 CFR 50.38 for Maine Yankee Atomic Power Company, Connecticut Yankee Atomic Power Company, and Yankee Atomic Electric Company - Supplemental Information Needed; Relationship of Exemption Reques Project stage: Approval ML1119600682011-07-14014 July 2011 Enclosure - Request for Supplemental Information Related to the Request for Exemption from 10 CFR 50.38 and the Indirect License Transfer Related to Merger of Northeast Utilities and Nstar Project stage: Approval CY-11-024, Response to Request for Supplemental Information Related to the Request for Exemption from 10 C.F.R.50.38 and the Indirect License Transfer Related to Merger of Northeast Utilities and Nstar2011-08-16016 August 2011 Response to Request for Supplemental Information Related to the Request for Exemption from 10 C.F.R.50.38 and the Indirect License Transfer Related to Merger of Northeast Utilities and Nstar Project stage: Supplement ML1125003732011-09-0606 September 2011 Notice of Mtg W/ Maine Yankee to Discuss Status of Review of Indirect License Transfer Request Related to Pending Merger of Northeast Utilities & Nstar; Status of Request for Exemption from 10 CFR 50.38; & Decommissioning Financial Assuranc Project stage: Approval ML1127700152011-10-0303 October 2011 Request for Exemption from 10 CFR 50.38 for Maine Yankee Atomic Power Co., Connecticut Yankee Atomic Power Co., and Yankee Atomic Electric Co. - Accepted for Review; Relationship of Exemption Request to Indirect License Transfer and Status Project stage: Approval ML11298A0912011-10-20020 October 2011 Summary of Meeting with Yankee Companies, Northeast Utilities (Nu) & Nstar to Discuss Indirect License Transfer Request Related to Pending Merger of Nu & Nstar, Request for Exemption from 10 CFR 50.38 & Decommissioning Financial Assurance Project stage: Meeting CY-11-041, Foreign Ownership Negation Action Plan and Decommissioning Funding Assurance2011-12-21021 December 2011 Foreign Ownership Negation Action Plan and Decommissioning Funding Assurance Project stage: Request ML1203001842012-01-27027 January 2012 W. Norton Letter Connecticut Yankee Atomic Power Company, Haddam Neck Plant - Notice of Violation EA-2011-284 (TAC No. L24565) Project stage: Other ML1203003602012-01-27027 January 2012 Enclosunotice of Violation (W. Norton Letter Maine Yankee Atomic Power Company, Maine Yankee Atomic Power Station - Notice of Violation EA-2011-271 (TAC No. L24538)) Project stage: Other ML1203002012012-01-27027 January 2012 Enclosunotice of Violation (W. Norton Letter Connecticut Yankee Atomic Power Company, Haddam Neck Plant - Notice of Violation EA-2011-284 (TAC No. L24565)) Project stage: Other ML12027A2042012-01-27027 January 2012 Enclosure - Notice of Violation, EA-2011-283 Project stage: Other ML1203003342012-01-27027 January 2012 Letter Maine Yankee Atomic Power Company, Maine Yankee Atomic Power Station - Notice of Violation EA-2011-271 (TAC No. L24538) Project stage: Other ML12027A2002012-01-27027 January 2012 Ltr. to W. Norton Yankee Atomic Electric Company, Yankee Nuclear Power Station - Notice of Violation EA-2011-283 (TAC No. L24566) Project stage: Other ML12066A0402012-02-23023 February 2012 Co. - Reply to Notice of Violation, EA-2011-271 Project stage: Other ML12066A0382012-02-23023 February 2012 Yankee Atomic Electric Co. - Reply to Notice of Violation; EA-2011-283 Project stage: Other CY-12-008, Connecticut Yankee Atomic Power Co., Reply to Notice of Violation, EA-2011-2842012-02-23023 February 2012 Connecticut Yankee Atomic Power Co., Reply to Notice of Violation, EA-2011-284 Project stage: Other ML12082A0292012-03-21021 March 2012 W. Norton Letter Acknowledgement of the Yankee Atomic Electric Company Response to the Yankee Nuclear Power Station-Notice of Violation EA-2011-283 (TAC No. L24566) Project stage: Other ML12081A2482012-03-21021 March 2012 W. Norton Letter Acknowledgement of the Maine Yankee Atomic Power Company Response to the Maine Yankee Atomic Power Company Station Notice of Violation EA-2011-271 (TAC No. L24538) Project stage: Other ML12082A0122012-03-21021 March 2012 W. Norton Letter Acknowledgement of the Connecticut Yankee Atomic Power Company Response to the Haddam Neck Plant - Notice of Violation EA-2011-284 (TAC L24565) Project stage: Other ML12125A0422012-04-24024 April 2012 Submittal of Corrected Negation Action Plan Project stage: Other ML12157A4762012-05-31031 May 2012 Consent and Hearing Waiver - Connecticut Yankee Project stage: Other ML12157A4772012-05-31031 May 2012 Consent and Hearing Waiver - Yankee Atomic Project stage: Other ML12124A3722012-06-0404 June 2012 Ltr W Norton Connecticut Yankee Atomic Power Co Confirmatory Order (Effective Immediately) TAC No. L24565 (Haddam Neck) Docket Nos 50-213, 72-39; License No. DPR-61 Project stage: Other ML12157A4722012-06-0404 June 2012 Consent and Hearing Waiver - Maine Yankee Project stage: Other ML12124A3742012-06-0404 June 2012 Ltr W Norton Yankee Atomic Electric Co Confirmatory Order (Effective Immediately) TAC No. L24566 (Yankee Atomic) Docket Nos 50-029, 72-31; License No. DPR-3 Project stage: Other ML12124A3732012-06-0404 June 2012 Ltr W Norton Maine Yankee Atomic Power Co Confirmatory Order (Effective Immediately) TAC No. L24538 (Maine Yankee) Docket Nos 50-309, 72-30; License No. DPR-36 Project stage: Other ML12226A2972012-08-0909 August 2012 Letter Response Yankee Atomic Electric Company, Yankee Nuclear Power Station - Disputed Notice of Violation 05000029 (TAC L24566) Project stage: Other ML12226A4792012-08-0909 August 2012 W. Norton Letter Response to Connecticut Yankee Atomic Power Company, Haddam Neck Plant - Disputed Notice of Violation 05000213 (TAC L24565) Project stage: Other ML12226A2322012-08-0909 August 2012 W. Norton Letter Response to Maine Yankee Atomic Power Company, Maine Yankee Atomic Power Station - Disputed Notice of Violation 05000309 (TAC L24538) Project stage: Other ML13228A2252013-07-15015 July 2013 NCP-2013-003, Non-Cconcurrence on Letter to W. Norton Request for Exemption from Title 10 of the Code of Federal Regulations 50.38 Requirements for Main Yankee Atomic Power Company, Connecticut Yankee Atomic Power Company, and Yankee Atomic Project stage: Approval ML13086A0102013-07-15015 July 2013 Letter to W. Norton Request for Exemption from Title 10 of the Code of Federal Regulations 50.38 Requirements for Main Yankee Atomic Power Company, Connecticut Yankee Atomic Power Company, and Yankee Atomic Electric Company Project stage: Approval ML13259A0792013-09-13013 September 2013 Federal Register Notice: Maine Yankee Atomic Power Company, Connecticut Yankee Atomic Power Company, and Yankee Atomic Electric Company Notice of Granting Exemption from 10 CFR 50.38 Requirements Project stage: Approval 2012-01-27
[Table View] |
Similar Documents at Maine Yankee |
---|
Category:Letter
MONTHYEARIR 05000309/20240012024-06-26026 June 2024 Company – Independent Spent Fuel Storage Installation NRC Inspection Reports 07200030/2024001 And05000309/2024001 ML24124A1372024-04-30030 April 2024 Independent Spent Fuel Storage Installation - 2023 Individual Monitoring NRC Form 5 Report ML24117A0602024-04-23023 April 2024 Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Off-Site Dose Calculation Manual for 2023 ML24094A0602024-03-28028 March 2024 Independent Spent Fuel Storage Installation, Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 for the Maine Yankee Independent Spent Fuel Storage Installation ML24074A3822024-03-11011 March 2024 Independent Spent Fuel Storage Installation, Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML24074A3812024-03-11011 March 2024 Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report NG-24-0001, 2024 Annual Decommissioning and Spent Fuel Management Funding Status Report and Independent Spent Fuel Storage Installation (ISFSI) Decommissioning Financial Assurance Update2024-03-0606 March 2024 2024 Annual Decommissioning and Spent Fuel Management Funding Status Report and Independent Spent Fuel Storage Installation (ISFSI) Decommissioning Financial Assurance Update ML23286A3262024-02-29029 February 2024 Issuance of Exemption for Maine Yankee Atomic Power Company Regarding Maine Yankee Independent Spent Fuel Storage Installation ML24025A0392024-01-12012 January 2024 Independent Spent Fuel Storage Installation, Property Insurance Coverage ML23342A1112024-01-0909 January 2024 Company - Independent Spent Fuel Storage Installation Security Inspection Plan ML23117A0452023-04-25025 April 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Off-Site Dose Calculation Manual for 2022 ML23113A0052023-03-31031 March 2023 Request for Exemption from 10 CFR 50.82 10 CFR 50.75 for the Maine Yankee Independent Spent Fuel Storage Installation NG-23-0001, 2023 Annual Decommissioning and Spent Fuel Management Funding Status Report2023-03-27027 March 2023 2023 Annual Decommissioning and Spent Fuel Management Funding Status Report ML23068A0112023-03-0606 March 2023 Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report ML23068A0132023-03-0606 March 2023 Independent Spent Fuel Storage Installation, Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML22340A4622023-02-24024 February 2023 Closeout Letter to Maine Yankee Atomic Power Company Regarding 2018 and 2021 Updated DFPs for Maine Yankee ISFSI IR 07200030/20234012023-01-26026 January 2023 Company - NRC Independent Spent Fuel Storage Security Inspection Report No. 07200030/2023401 (Letter Only) ML23026A0802023-01-17017 January 2023 Company - Property Insurance Coverage IR 07200030/20224012022-10-11011 October 2022 Company - NRC Independent Spent Fuel Storage Security Inspection Report No. 07200030/2022401 ML22216A0682022-07-28028 July 2022 Independent Spent Fuel Storage Installation, Supplemental Information for the Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan ML22088A0212022-04-0101 April 2022 Independent Spent Fuel Storage Installation, 10 CFR 72.48 Biennial Report ML22088A0182022-04-0101 April 2022 Independent Spent Fuel Storage Installation, 10 CFR 50.59 Biennial Report NG-22-0041, And Independent Spent Fuel Storage Installation, 2022 Annual Decommissioning and Spent Fuel Management Funding Status Report2022-03-31031 March 2022 And Independent Spent Fuel Storage Installation, 2022 Annual Decommissioning and Spent Fuel Management Funding Status Report ML22088A0122022-03-14014 March 2022 Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML22088A0162022-03-14014 March 2022 Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report ML22011A1332022-01-31031 January 2022 Company - Independent Spent Fuel Storage Installation Security Inspection Plan ML22045A0662022-01-20020 January 2022 Independent Spent Fuel Storage Installation - Property Insurance Coverage ML22045A0652022-01-20020 January 2022 Independent Spent Fuel Storage Installation, Nuclear Liability Insurance Coverage ML21362A1592021-12-10010 December 2021 Independent Spent Fuel Storage Installation, Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan IR 05000309/20210012021-10-28028 October 2021 Company - NRC Independent Spent Fuel Storage Installation Inspection Report Nos. 07200030/2021001 and 05000309/2021001 NG-21-0006, 2021 Annual Decommissioning and Spent Fuel Management Funding Status Report2021-03-31031 March 2021 2021 Annual Decommissioning and Spent Fuel Management Funding Status Report ML21077A1672021-03-0202 March 2021 Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML21105A7392021-03-0202 March 2021 Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report ML21042B5932021-01-27027 January 2021 Independent Spent Fuel Storage Installation, Property Insurance Coverage ML21042B5942021-01-27027 January 2021 Independent Spent Fuel Storage Installation, Nuclear Liability Insurance Coverage ML21012A3992021-01-13013 January 2021 Company - Independent Spent Fuel Storage Installation Security Inspection Plan ML21042B8962021-01-11011 January 2021 Independent Spent Fuel Storage Installation, Biennial Update of the Defueled Safety Analysis Report ML21050A2302021-01-11011 January 2021 Independent Spent Fuel Storage Installation - Formal Announcement of New ISFSI Manager IR 07200030/20204012020-10-21021 October 2020 Company - NRC Independent Spent Fuel Storage Security Inspection Report No. 07200030/2020401 ML20136A3372020-04-22022 April 2020 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Off-Site Dose Calculation Manual for 2019 ML20101H9312020-04-0101 April 2020 Independent Spent Fuel Storage Installation - 10 CFR 50.59 Biennial Report ML20097B6692020-03-19019 March 2020 Independent Spent Fuel Storage Installation, Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML20087J6772020-03-11011 March 2020 Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report ML20015A5492020-01-15015 January 2020 Company - Independent Spent Fuel Storage Installation Security Inspection Plan ML19241A4582019-08-29029 August 2019 Letter to T. Matthews Maine Yankee Atomic Power Company - Threshold Determination That NRC Consent Is Not Required in Connection with Acquisition of Emera Maine by Enmaz Corporation ML19182A0322019-07-0505 July 2019 Letter to J. Brown Maine Yankee Atomic Power Company Exemption Request from Certain Requirements of 10 CFR 72.214 for the ISFSI ML19182A0402019-07-0505 July 2019 Letter to P. Dostie Maine Yankee Atomic Power Company Exemption Request from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 for the ISFSI ML19113A1032019-04-23023 April 2019 Request for NRC Threshold Determination That NRC Consent Is Not Required in Connection with Acquisition of Emera Maine by Enmax Corporation ML19127A2892019-04-16016 April 2019 Independent Spent Fuel Storage Installation, Submittal of Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Off-Site Dose Calculation Manual for 2018 ML19112A0242019-04-11011 April 2019 Independent Spent Fuel Storage Installation, Reference Correction - Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 2024-06-26
[Table view] |
Text
August 9, 2012 EA-2011-283 Mr. Wayne Norton President and Chief Executive Officer Yankee Atomic Electric Company 49 Yankee Road Rowe, MA 01367
SUBJECT:
RESPONSE YANKEE ATOMIC ELECTRIC COMPANY, YANKEE NUCLEAR POWER STATION - DISPUTED NOTICE OF VIOLATION 05000029 (TAC L24566)
Dear Mr. Norton,
This letter provides the results of the U.S. Nuclear Regulatory Commissions (NRC or Commission) review of your letter, dated February 23, 2012 (ADAMS Accession No. ML12066A038), regarding the Notice of Violation (NOV) (NOV EA-2011-271, dated January 27, 2012 (ADAMS Accession No.12027A200)). In your letter, you disagreed that the cited violation of Title 10 of the Code of Federal Regulations (10 CFR) 50.38, Ineligibility of Certain Applicants, had occurred. The NRC has reviewed your letter and applicable supporting documentation, and it has determined that NOV EA-2011- 283 occurred as stated for the reasons stated below.
Yankee Atomic Electric Company (Yankee Atomic) is the licensee for the Yankee Nuclear Power Station and currently holds a 10 CFR Part 50 possession only license. Under 10 CFR 72, Subpart K, General License for Storage of Spent Fuel at Power Reactor Sites, Yankee Atomic is authorized to store spent fuel. Yankee Atomic states that the Yankee Nuclear Power Station Independent Spent Fuel Storage Installation (ISFSI) is not a production or utilization facility and, therefore, does not fall within the provisions of the Atomic Energy Act that govern 10 CFR Part 50 licensees. In particular, you state that the statutory prohibition on foreign ownership, control or domination (FOCD) derives from the sections governing 10 CFR Part 50 licensees, therefore, the FOCD provisions do not apply to the Yankee Atomic license. Yankee Atomic notes in its letter that 10 CFR Part 72 has no explicit prohibition on foreign ownership control or domination (FOCD). Yankee Atomic states that its 10 CFR Part 50 licensee does not allow operation of a production or utilization facility.
The staff has determined that the Yankee Atomic proposal to apply the license transfer analysis of 10 CFR 50.80 to the FOCD restrictions of 10 CFR 50.38 is not appropriate. Yankee Atomics letter did not acknowledge that as a 10 CFR Part 50 licensee it must comply with all the requirements of 10 CFR Part 50 as currently written. That Yankee Atomic is no longer authorized to operate an electric power production facility does not relieve it of the applicable 10 CFR Part 50 license requirements, including the FOCD requirements of 10 CFR 50.38.
Yankee Atomic also states that the FOCD prohibitions of 10 CFR 50.38 cannot arise without a finding of transfer of control of the 10 CFR Part 50 license under 10 CFR 50.80. Yankee Atomic makes two statements in support of its position. First, it says that no foreign entity holds a
W. Norton majority or controlling interest in Yankee Atomic. Second, it says the NRC reviewed and allowed a foreign interest, National Grid, to acquire an interest in Yankee Atomic, but concluded that the acquisition was not a transfer of control of the license.
Transfer of control of the license is not a necessary condition to make a determination that a foreign interest may have obtained FOCD of a licensee. With respect to the amount of ownership required to find FOCD, the NRCs Final Standard Review Plan on Foreign Ownership, Control, or Domination, dated June 1999, (FOCD SRP) does not provide a specific threshold above which it would be conclusive that a licensee is controlled by foreign interests (64 FR 52357-52359). The NRCs FOCD evaluation considers the totality of the facts on a case-by-case basis. Section 3.2 of the FOCD SRP states, An applicant is considered to be foreign owned, controlled, or dominated whenever a foreign interest has the power, direct or indirect, whether or not exercised, to direct or decide matters affecting the management or operations of the applicant (64 FR 52355- 52358). Moreover, FOCD can arise due to foreign entities or persons with voting rights, financial arrangements, or management positions such as directors, officers, or executive personnel in the licensees organization. Based on its review of the totality of facts presented, the NRC determined that Yankee Atomic violated 10 CFR 50.38 when it failed to implement a negation action plan that would negate the ability of foreign interests to exercise ownership, control or domination over Yankee Atomic.
In contrast, the previous determinations of transfer of control of the Yankee Nuclear Power Station ISFSI license under 10 CFR 50.80 did not examine the totality of facts with respect to FOCD, since the totality of facts did not become apparent until the NRCs review of the indirect license transfer application submitted on December 6, 2010. The NRCs review identified an apparent violation of the requirements in 10 CFR 50.38 due to a series of incremental ownership changes that resulted in Yankee Atomic being owned, controlled, or dominated by two foreign corporations - Iberdrola, based in Spain (9.5 percent) and National Grid, based in the United Kingdom (34.5 percent).
In addition, Yankee Atomic states that the indirect foreign ownership of minority shareholders in Yankee Atomic does not equate to FOCD. The NRC agrees that the FOCD evaluation is not a simple review of ownership percentages. As previously stated, the Commissions FOCD SRP explains that the FOCD determination considers the totality of facts on a case-by-case basis.
This was the subject of the meeting held on September 20, 2011, in Rockville, Maryland, with representatives of Maine Yankee Atomic Power Company, Connecticut Yankee, Yankee Atomic Electric Company, and Northeast Utilities, (together referred to as the Yankee Companies).
The organization and governance of the Yankee Companies were discussed at the meeting.
According to the Yankee Companies representatives, Yankee Atomics does not use weighted voting, where the number of directors was appointed based on the percentage of stock ownership or a unanimous consent provision in its bylaws, and all decisions by the Board are through a majority vote. Several directors represented foreign interests, and had the power, whether or not exercised, to participate in Board decisions regarding nuclear safety and security.
Yankee Atomic states that the NOV does not identify any safety or security issue in which a foreign entity exerted actual control over Yankee Atomic with respect to safety or security.
However, asserting that actual FOCD was not exercised during that period is not relevant.
The FOCD SRP states, An applicant is considered to be foreign owned, controlled, or dominated whenever a foreign interest has the power, direct or indirect, whether or not exercised, to direct or decide matters affecting the management or operations of the applicant.
W. Norton [Emphasis added]. FOCD SRP Section 4.2 directs the staff to consider whether the foreign interest has the ability to appoint managers. Finally, the regulatory standard is based upon a review of the totality of facts and circumstances which may require negation measures. Upon review of the information provided, the NRC has concluded that, in fact, foreign interests have that power. Since Yankee Atomic is a 10 CFR Part 50 licensee, it is required to comply with all of the requirements of 10 CFR Part 50. Based on information provided, the staff finds that Yankee Atomic was subject to FOCD and thus required a negation action plan during the period cited for in the NOV.
Separately, the NRC continues to review Yankee Atomics request, dated May 16, 2011, (ADAMS Accession No. ML11139A088) for an exemption to 10 CFR 50.38. The NRC will notify you the results of the staffs evaluation when it is completed.
If you have any questions, please contact me at (301) 492-3338 or John Goshen of my staff, at (301) 492-3325.
Sincerely,
/RA/
Douglas W. Weaver, Deputy Director Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards Docket Nos.: 50-309, 72-30 License No: DPR-36 TAC No.: L24566 cc: Yankee Atomic Power Station Service List
ML11139A088) for an exemption to 10 CFR 50.38. The NRC will notify you the results of the staffs evaluation when it is completed.
If you have any questions, please contact me at (301) 492-3338 or John Goshen of my staff, at (301) 492-3325.
Sincerely,
/RA/
Douglas W. Weaver, Deputy Director Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards Docket Nos.: 50-309, 72-30 License No: DPR-36 TAC No.: L24566 cc: Yankee Atomic Power Station Service List DISTRIBUTION: SFST R/F BBenney TFredrichs ARivera MAshley JLubinski BMizuno SHamman/RI NHilton MMcLaughlin/RI NSheehan/RI ADeFrancisco/RI MFerdas/RI NMcNamara/RI MLombard ADAMS:
File location: G:\SFST\Northeast Utilities\NOV Jan 2012\Response to contestations\NRC response to YA 2 23 12 letter.docx ADAMS P8 Accession No.: ML12226A297 OFC NMSS/SFST NMSS/SFST NMSS NMSS/SFST NMSS/SFST NAME WWheatley JGoshen KMattern MWaters DWeaver DATE 6/ 02 /2012 6/19/2012 6/ 21 /12 8/1 /2012 8/9/2012 OFC NRR NRR OGC OE NAME JSimpson CRegan CSafford JWray DATE 6/ 19 /2012 6/ 19 /2012 6/27/2012 6/21/2012 Yankee (Rowe) Nuclear Power Station Service List cc:
David A. Repka Partner Winston & Strawn LLP 1700 K Street, N.W.
Washington, DC 20006-3817 Mr. Joseph Fay General Counsel Yankee Atomic Electric Company 49 Yankee Road Rowe, MA 01367 Mr. Robert Capstick Regulatory Affairs Director Yankee Atomic Electric Company 77 Lakewood Rd.
Newton, MA 02461 Assistant Attorney General Commonwealth of Massachusetts 200 Portland Street Boston, MA 02114 Director MA Radiation Control Program Schrafft Center, Suite 1M2A 529 Main Street Charlestown, MA 02129 Secretary Massachusetts Executive Office of Public Safety One Ashburton Place Room 2133 Boston, MA 02108 Peggy Sloan, AICP Franklin Regional Council of Governments 425 Main Street, Suite 20 Greenfield, MA 01301-3313 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 2100 Renaissance Boulevard, Suite 100 King of Prussia, PA 19406-2713
W Norton Diane Screnci, Region I U.S. Nuclear Regulatory Commission 2100 Renaissance Boulevard, Suite 100 King of Prussia, PA 19406-2713 John Giarrusso State Liaison Officer Division Chief, Planning and Preparedness Massachusetts Emergency Management Agency 400 Worcester Road Framingham, MA 01702-5399