ML12221A304

From kanterella
Jump to navigation Jump to search
Updates to the Defueled Safety Analysis Report and Final Safety Analysis Reports - Cover Letter
ML12221A304
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 06/25/2012
From:
Dominion Nuclear Connecticut
To:
Office of Nuclear Reactor Regulation, Document Control Desk, NRC/FSME
References
12-399
Download: ML12221A304 (5)


Text

Dominion Nuclear Connecticut, Inc.

Millstone Power Station Do in on Rope Ferry Road Waterford, CT 06385 JUN 2 5 2012 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Serial No.

MPS Lic/GJC Docket Nos.

License Nos.12-399 RO 50-245 50-336 50-423 DPR-21 DPR-65 NPF-49 DOMINION NUCLEAR CONNECTICUT, INC.

MILLSTONE POWER STATION UNITS 1, 2, AND 3 UPDATES TO THE DEFUELED SAFETY ANALYSIS REPORT AND FINAL SAFETY ANALYSIS REPORTS In accordance with 10 CFR 50.71(e), Dominion Nuclear Connecticut, Inc. (DNC) hereby submits revisions to Millstone Power Station Units 2 and 3 (MPS2 and MPS3) Updated Final Safety Analysis Reports (UFSARs). There were no revisions to the Millstone Power Station Unit 1 Defueled Safety Analysis Report.

DNC is submitting one CD-ROM which contains the electronic version FSAR Revision 29.3 in the following files:

of the MPS2 File Size &

Availability File Name File Description 001 Dominion Millstone2_FrontmatterChapO2.pdf 002_DominionMillstone2_Chap03_Chap05.pdf MPS2 UFSAR Revision History, List of Abbreviations, List of Effective Sections, List of Effective Tables, List of Effective Figures, and Chapters 1 and 2 (all content) 22,452,327 bytes, publicly available MPS2 UFSAR Chapters 3 and 4 (all content) and Chapter 5 (less figures) 32,304,991 bytes, publicly available 003_DominionMillstone2_Chapo5figures.pdf MPS2 UFSAR Chapter 5 47,622,374 Figures bytes, publicly available 004_DominionMillstone2_Chap06_ChapO7.pdf MPS2 UFSAR Chapters 47,877,589 6 and 7 (all content) bytes, publicly available available Ac053 pi~tL.

~F31Lj

Serial No.12-399 DSAR/FSAR Updates Page 2 of 5 005_DominionMillstone2_Chapo8_ChapO9.pdf MPS2 UFSAR Chapter 8 (all content) and Chapter 9 (less figures) 28,323,970 bytes, publicly available 006_DominionMillstone2_Chap09figures.pdf MF Fiý

'IS2 UFSAR, Chapter 9 lures 27,406,295 bytes, publicly available 007_DominionMillstone2_Chaplo0Chapl5.pdf MPS2 UFSAR, Chapters 36,672,371 10 through 15 (all bytes, publicly content) available 008_DominionMillstone2_TRM.pdf MPS2 Millstone Station Unit 2 Technical Requirements Manual (TRM) 4,055,294 bytes, publicly available DNC is also submitting one CD-ROM which contains the electronic version of MPS3 FSAR, Revision 24.4 in the following files:

File Size &

Availability File Name File Description 00 1_DominionMillstone3_FrontmatterChap01.pdf Dominion MPS3 4,910,888 UFSAR Revision

bytes, History, List of publicly Effective Sections, available List of Effective Tables, List of Effective Figures, and Chapter 1 (all content) 002_DominionMillstone3_Chap02andTables.pdf Dominion MPS3 35,512,796 UFSAR Chapter 2,
bytes, Appendix 2.5A, and publicly Tables 2.3-1 available through 2.5.2-3 003_DominionMillstone3_Chap02Tables.pdf Dominion MPS3 UFSAR Chapter 2, Tables 2.5.2-4 through 2.5.4-24 32,549,472
bytes, publicly available 004_DominionMillstone3_Chap2Appendices.pdf Dominion MPS3 39,335,322 UFSAR Chapter 2,
bytes, Appendices 2.5B publicly through 2.5M available

Serial No.12-399 DSAR/FSAR Updates Page 3 of 5 005_DominionMillstone3_Chapo2Figures-l.pdf Dominion MPS3 UFSAR Chapter 2, Figures 2.1-1 through 2.5.1-12 48,801,131

bytes, publicly available 006_DominionMillstone3_Chapo2Figures2. pdf Dominion MPS3 49,963,228 UFSAR Chapter 2, bytes Figures 2.5.1-13 publicly through 2.5.4-23 available 007_DominionMillstone3_Chapo2Figures_3.pdf 008_Dominion_Millstone3_Chap03andFigures.pdf 009_DominionMillstone3_Chapo3Figures. pdf Dominion MPS3 UFSAR Chapter 2, Figures 2.5.4-24 through 2.5.5-7 47,390,642 bytes publicly available Dominion MP*

UFSAR Chapt and Figures 3.

through 3.8-3 33 29,798,021

er 3 bytes

.2-1 publicly available 33 45,461,122 er 3,

bytes, publicly 5

available Dominion MP*

UFSAR Chapt Figures 3.8-4 through 3A3-1 010_DominionMillstone3_Chapters4_5_6_all.pdf 011_DominionMillstone3_Chapters7_8_all.pdf Dominion MPS3 UFSAR Chapters 4, 5, and 6 (all content)

Dominion MPS3 UFSAR Chapters 7 and 8 (all content) 35,197,915

bytes, publicly available 29,441,151
bytes, publicly available 46,758,981
bytes, publicly available 012_DominionMillstone3_Chapo9andFig ures.pdf Dominion MPS3 UFSAR Chapter 9 and Figures 9.1-1 through 9.3-2 013_DominionMillstone3_Chapo9FigsChapl 10all.pdf Dominion MPS3 40,980,479 UFSAR Chapter 9
bytes, Figures 9.3-3 publicly through 9.5-7 and available Chapter 10 (all content)

Serial No.12-399 DSAR/FSAR Updates Page 4 of 5 014_DominionMillstone3_Chapl land12.pdf Dominion MPS3 UFSAR Chapters 11 and 12 (all content) 31,933,991

bytes, publicly available 015_DominionMillstone3 Chapl 5_FPER.pdf Dominion MPS3 UFSAR Chapter 13 (all content) through FPER 23,985,793
bytes, publicly available 016_DominionMillstone3_TRM.pdf Dominion MPS3 2,748,266 UFSAR MPS3 TRM
bytes, publicly available The information given in the enclosed revisions accurately presents changes completed since the previous submittal.

If you have any questions or require additional information, please contact Mr. William D. Bartron, (860) 444-4301.

Sincerely, Stephtrni.S cace Site Vice President - Millstone STATE OF CONNECTICUT COUNTY OF NEW LONDON The foregoing document was acknowledged before me, in and for the County and State aforesaid, today by Stephen E. Scace, who is Site Vice President - Millstone of Dominion Nuclear Connecticut, Inc. He has affirmed before me that he is duly authorized to execute and file the foregoing document in behalf of that company, and that the statements in the document are true to the best of his knowledge and belief.

Acknowledged before me this day of 2012.

My Commission Expires:

THOMAS CLEARY NOTARY PUBLIC MY COMMISSION EXPIRES FEBRUARY 28, 2016 Notary Public,"

Serial No.12-399 DSAR/FSAR Updates Page 5 of 5 Attachments:

MPS1 DSAR CD ROM MPS2 FSAR CD-ROM MPS3 FSAR CD-ROM Commitments made in this letter: None.

cc: (w/ attachments)

U.S. Nuclear Regulatory Commission Region I 2100 Renaissance Blvd, Suite 100 King of Prussia, PA 19406-2713 NRC Senior Resident Inspector Millstone Power Station cc: (w/o attachments)

S. J. Giebel NRC Project Manager Millstone Unit 1 U.S. Nuclear Regulatory Commission Two White Flint North, Mail Stop T-8 F5 11545 Rockville Pike Rockville, MD 20852-2738 L. A. Kauffman Health Physicist-DNMS U.S. Nuclear Regulatory Commission Region I 2100 Renaissance Blvd, Suite 100 King of Prussia, PA 19406-2713 J. S. Kim NRC Project Manager U.S. Nuclear Regulatory Commission, Mail Stop 08 C2A One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738