LR-N12-0234, Stations Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 15
| ML12216A150 | |
| Person / Time | |
|---|---|
| Site: | Salem, Hope Creek |
| Issue date: | 08/01/2012 |
| From: | Gaerity A Public Service Enterprise Group |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| LR-N12-0234 | |
| Download: ML12216A150 (2) | |
Text
SAFEGUARDS INFORMATION contains SAFEGUARDS INFORMATION. When separated from Attachment 2, this document is decontrolled provided the transmittal document does not otherwise warrant protection from unauthorized disclosure PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, NJ 08038-0236
'AUG 0 12012 LR-N 12-0234 O PSEG A? iclea LLC 10CFR50.54(p)(2)
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Salem and Hope Creek Generating Stations Renewed Facility Operating License Nos. DPR-70, DPR-75 and NPF-57 Docket nos. 50-272, 50-311 and 50-354
Subject:
Salem-Hope Creek Generating Stations Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 15 Pursuant to the requirements of 10CFR50.54(p)(2), PSEG Nuclear, LLC, (PSEG) hereby submits Revision 15 to the Salem-Hope Creek Generating Stations Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan. A summary of the changes to the Plan made to Revision 15 is included. The changes of Revision 15 were implemented on August 1, 2012. In accordance with the requirements of 10CFR50.54(p)(2), the changes have been determined not to decrease the effectiveness of the Security Plan.
In accordance with 1 OCFR50.4(b)(4), the signed original is being sent to the Document Control Desk and one copy is being sent to Region I.
This revision incorporates the nomenclature contained in NEI 03-12 Revision 7 "Template for the Security Plan, Training and Qualification Plan, Safeguards Contingency Plan [and Independent Spent Fuel Storage Installation Security Program]" and approved deviations per Security Frequently Asked Question (SFAQ) 12-03, SFAQ 12-04, SFAQ 12-05, and SFAQ 12-
- 06. Attachment 1 contains the Evaluation and Summary of these Revision 15 changes.
SAFEGUARDS INFORMATION contains SAFEGUARDS INFORMATION. When separated from Attachment 2, this document is decontrolled provided the transmittal document does not otherwise warrant protection from unauthorized disclosure 00 c~1
AUG 0 12012 SAFEGUARDS INFORMATION contains SAFEGUARDS INFORMATION. When separated from Attachment 2, this document is decontrolled provided the transmittal document does not otherwise warrant protection from unauthorized disclosure Document Control Desk LR-N12-0234 Page 2 contains Revision 15 of the Security Plan which contains Safeguards Information.
PSEG requests that this information be withheld from public disclosure in accordance with 10 CFR 73.21, "Protection of Safeguards Information: Performance Requirements", paragraph (a)(1).
There are no regulatory commitments contained in this letter.
Should you have any questions concerning this letter, please contact Michelle Patti at (856) 339-3691.
Sincerely, Anndria Gaerity Director, Emergency Services Attachments (2)
C With Attachments:
Administrator - Region I U.S. Nuclear Regulatory Commission 2100 Renaissance Boulevard Renaissance Park King of Prussia, PA 19406 Without Attachments Project Manager - Salem and Hope Creek USNRC Senior Resident Inspector - Hope Creek USNRC Senior Resident Inspector - Salem Mr. Pat Mulligan, Manager IV - BNE HC Commitment Tracking Coordinator Salem Commitment Tracking Coordinator Corporate Commitment Tracking Coordinator SAFEGUARDS INFORMATION contains SAFEGUARDS INFORMATION. When separated from Attachment 2, this document is decontrolled provided the transmittal document does not otherwise warrant protection from unauthorized disclosure