ML12214A594

From kanterella
Jump to navigation Jump to search
Examination Materials for the Prairie Island Nuclear Generating Plant Requalification Program Inspection Week of October 17, 2011
ML12214A594
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 10/06/2011
From: Schimmel M
Northern States Power Co, Xcel Energy
To:
Region 3 Administrator
References
L-PI-11-086
Download: ML12214A594 (3)


Text

ENCLOSURE WITHHELD FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH NUREG-1021 UNTIL AFTER THE EXAMINATIONS ARE COMPLETE.

'll XcelEnergy" OCT 0 6' 2011 L-PI-11-086 NUREG-1021 Regional Administrator, Region III U S Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, Illinois 60532-4352 Prairie Island Nuclear Generating Plant Units 1 and 2 Dockets 50-282 and 50-306 Renewed License Nos. DPR-42 and DPR-60 Examination Materials for the Prairie Island Nuclear Generating Plant (PINGP)

Regualification Program Inspection. Week of October 17. 2011

Reference:

1, Nuclear Regulatory Commission (NRC) letter to Mr. Mark A. Schimmel, "Prairie Island Nuclear Generating Plant Requalification Program Inspection" dated August 22,2011, Accession Number ML11234A426.

In response to Reference 1, Northern States Power Company, a Minnesota corporation, doing business as Xcel Energy (hereafter "NSPM"), submits the written examinations and operating tests (Enclosure 1) to support the licensed operator requalification program "inspection to be conducted at PINGP the week of October 17, 2011. provides a description of the documentation included with this submittal.

NUREG-1021 physical security requirements state that the enclosed examination materials shall be withheld from public disclosure until after the examinations are completed.

Summary of Commitments This letter contains no new commitments and no revisions to existing commitments.

Mark A. Schimmel Site Vice President, Prairie Island Nuclear Generating Plant Northern States Power Company - Minnesota OCT 7 201.1 1717 Wakonade Drive East

  • Welch, Minnesota 55089-9642 Telephone: 651.388,1121

Regional Administrator, Region III Page 2 Enclosure cc:

Dell McNeil, US NRC Region III, with enclosure Hironori Peterson, without enclosure

ENCLOSURE WITHHELD FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH NUREG-1021 UNTIL AFTER THE EXAMINATIONS ARE COMPLETE.

ENCLOSURE 1 2011 NRC REQUALIFICATION EXAMINATION MATERIALS TABLE OF CONTENTS Senior Reactor Operator Written Exam Reactor Operator Written Exam Scenario 1 Scenario 2 Walkthru Exam Summary (SRO)

Walkthru Exam Summary (RO)

Job Performance Measure (JPM) #1 (including referenced procedures)

JPM #2 (including referenced procedures)

JPM #3 (including referenced procedures)

JPM #4 (including referenced procedures)

..IPM #5 (including referenced procedures)

JPM #6 (including referenced procedures) 31 pages 31 pages 22 pages 28 pages 1 page 1 page 12 pages 12 pages 18 pages 14 pages 14 pages 17 pages