CuadradoDeJesus, Samuel From:
Sent:
To:
Cc:
Subject:
Attachments:
Holmberg, Mel Monday, January 23, 2012 1:51 PM CuadradoDeJesus, Samuel Hills, David RE:
DB SB Crack RC Investigation Information Needed.docx; INSPECTION PLAN 71007 12-2ldraft.doc; Davis-Beese Sheild Building Contention.pdf
- Samuel, It appears that the group that developed the DB Shield Building Contention document incorporated my request for information into their document. Attached is the actual information request I submitted by E-mail to the Davis-Besse Licensee in support our Region III review of the shield building root cause inspection that I am leading. This information was entered into ADAMs as a public record and the information was obtained to support the inspection that was planned.
This inspection scope and objectives are defined in the non-public Reqion III inspection plan attached M
From: CuadradoDeJesus, Samuel Sent: Monday, January 23, 2012 12:23 PM To: Holmberg, Mel Cc: Davis-BesseHearingFile Resource
Subject:
- Mel, I left a voicemail for you. Let me know if you did requested the information on pages 42-44, and if the information as presented in the attached document is correct. Just give me call (301-415-2946)
Thanks Samuel Cuadrado de Jesds Project Manager Projects Branch 1 Division of License Renewal U.S. Nuclear Regulatory Commission Phone: 301-415-2946 Samuel.CuadradoDeJesus@nrc.gov (7