MONTHYEARML23128A1612023-05-0808 May 2023 NRR E-mail Capture - Comanche Peak Nuclear Power Plant, Units 1 and 2, Beaver Valley Power Station, Unit Nos. 1 and 2, Davis-Besse Nuclear Power Station, Unit 1, and Perry Nuclear Power Plant, Unit No. 1 - Acceptance of Requested Licensing ML23086B9862023-03-27027 March 2023 NRR E-mail Capture - Davis-Besse, Unit No. 1 - Acceptance Review Results for Davis-Besse, Unit No. 1 - Proposed Alternative Request RP-5 ML23033A0322023-02-0101 February 2023 NRR E-mail Capture - Request for Additional Information for Davis-Besse's 2022 Steam Generator Inspection Report (L-2022-LRO-0115) ML22266A1102022-09-23023 September 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding July 21, 2022, Request for Withholding Information from Public Disclosure ML22164A8572022-06-13013 June 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Revise the Emergency Plan ML22118A6862022-04-28028 April 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Alternative to Extend the Steam Generator Weld Inspection Interval ML22112A1092022-04-22022 April 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Revise the Design Basis for the Shield Building ML22090A1692022-03-30030 March 2022 Re_ Action Tracking Item 2022 SST - 335 - Tom Gurdziel, E-mail Re_ Event Number 55734 at Davis Besse, a Matter of Interpretation ML22080A2512022-03-18018 March 2022 NRR E-mail Capture - (External_Sender) ASME OM Code Case OMN-27, Alternative Requirements for Testing Category a Valves (Non- Piv/Civ) ML22055B0382022-02-24024 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Upcoming Steam Generator Tube Inservice Inspection ML22055A0872022-02-23023 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Relief Request RP-3 ML22045A4962022-02-14014 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of License Amendment Request to Revise the Emergency Plan ML22040A1832022-02-0707 February 2022 LTR-22-0033 Tom Gurdziel, E-mail Event Number 55734 at Davis Besse, a Matter of Interpretation ML22034A9472022-02-0303 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Revised Review Estimates for Proposed Alternative to Extend the Steam Generator Weld Inspection Interval ML22033A0632022-02-0101 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of License Amendment Request to Revise the Design Basis for the Shield Building Containment Structure ML21321A3782021-11-16016 November 2021 NRR E-mail Capture - Energy Harbor Fleet, Beaver Valley Units 1 and 2 and DAVIS-BESSEL Unit 1 - Acceptance of License Amendment Request Adoption of TSTF-554 EPID-L-2021-LLA-0193 ML21321A3792021-11-16016 November 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Alternative to Extend the Steam Generator Weld Inspection Interval ML21287A0382021-10-14014 October 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of Requests for Relief from Certain Inservice Testing Requirements ML21271A1332021-09-28028 September 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of Proposed Alternative RR-A2 for Certain Steam Generator Weld Inspections ML21119A2152021-04-28028 April 2021 NRR E-mail Capture - Energy Harbor Fleet, Beaver Valley Units 1 and 2 and DAVIS-BESSE Unit 1 - Acceptance of Relief Request Proposed Alternative to Use ASME OM Code Case OMN-27 ML21041A5452021-02-10010 February 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Steam Generator Tube Inspection Reports ML21007A3732021-01-0707 January 2021 NRR E-mail Capture - (External_Sender) (External) Request for Additional Information Regarding License Amendment Request to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff, ML21004A1442020-12-30030 December 2020 NRR E-mail Capture - Request for Additional Information Regarding License Amendment Request to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff ML20329A3832020-11-24024 November 2020 NRR E-mail Capture - Davis Besse Nuclear Power Station, Unit No. 1 - Request for an Exemption from the 2020 Force-on-Force Exercises ML20304A2842020-10-29029 October 2020 50.59 Inspection 2nd Request for Information ML20289A0992020-10-0505 October 2020 NRR E-mail Capture - Energy Harbor Fleet, Results of Acceptance Review Request to Use Provision in Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, EPID-l-2020-LLR-0132 ML20281A3692020-10-0505 October 2020 Energy Harbor Fleet, Results of Acceptance Review Request to Use Provision in Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, EPID-l-2020-LLR-0132 ML20239A7942020-08-25025 August 2020 NRR E-mail Capture - Energy Harbor Fleet, Beaver Valley Units 1 and 2 and DAVIS-BESSEL Unit 1 - Acceptance of License Amendment Request Incorporation of Applicable Standard in TS 5.2.2.e ML20203M3712020-07-21021 July 2020 Ultimate Heat Sink Request for Information Part 1 ML20203M3722020-07-21021 July 2020 Ultimate Heat Sink Request for Information Part 1 and Part 2 L-20-183, Response to Request for Additional Information Regarding License Amendment Request for Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force2020-06-23023 June 2020 Response to Request for Additional Information Regarding License Amendment Request for Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force ML20154K7642020-06-0202 June 2020 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Adopt TSTF-425 ML20127H8672020-05-0606 May 2020 NRR E-mail Capture - Beaver Valley, Davis-Besse, and Perry - Request for Additional Information Regarding Request for Exemptions from Part 73 Security Requalification Requirements ML20058D3152020-02-27027 February 2020 Completion of License Transfer for the Beaver Valley, Davis-Besse and Perry Nuclear Units ML20024E0092020-01-23023 January 2020 NRR E-mail Capture - FENOC License Transfer - January 23, 2020 Call Summary ML20021A3162020-01-21021 January 2020 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Request for Additional Information Regarding License Amendment Request to Revise Containment Leakage Rate Testing ML19346B3972019-12-11011 December 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of License Amendment Request to Adopt TSTF-425 ML19273A1132019-09-27027 September 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Acceptance of License Amendment Request to Extend Containment Leakage Rate Test Interval ML19179A1382019-06-28028 June 2019 NRR E-mail Capture - Davis-Besse - Request for Additional Information Regarding the Decommissioning Quality Assurance Program ML19164A1532019-06-13013 June 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Request for Additional Information Regarding License Amendment Request for Post-Shutdown Emergency Plan ML19162A3922019-06-11011 June 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Request for Additional Information Regarding License Amendment Request for Permanently Defueled Technical Specifications ML19161A2132019-06-0606 June 2019 NRR E-mail Capture - Results of Acceptance Review - FENOC Fleet - Request for Approval of Request for Approval of Lrradiated Fuel Management Plans, EPID L-2019-LRO-0016 ML19149A6202019-05-29029 May 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Approval of the Decommissioning Quality Assurance Program ML19130A2082019-05-0808 May 2019 Email - NRC Email to FEMA Dated May 8, 2019: NRC Response to Comment on FEMA Review of Proposed Changes to DBNPS Emergency Plan for Permanently Defueled Condition ML19106A2512019-04-16016 April 2019 NRR E-mail Capture - Davis-Besse - Proposed License Condition and Draft Safety Evaluation for the License Amendment Request to Adopt NFPA 805 ML19073A1112019-03-14014 March 2019 NRR E-mail Capture - Davis-Besse - Acceptance of License Amendment Request for Permanently Defueled License and Technical Specifications ML19043A6962019-02-0808 February 2019 NRR E-mail Capture - Davis-Besse License Amendment Request for the Post-Shutdown Emergency Plan ML18320A1272018-11-16016 November 2018 NRR E-mail Capture - Davis-Besse LAR to Change TS Definitions and Administrative Controls for Permanently Defueled Conditions ML18282A1482018-10-0909 October 2018 NRR E-mail Capture - Results of Acceptance Review - FENOC Fleet - Request for Exemption Related to the Suspension of Security Measures in an Emergency or During Severe Weather, EPID L-2018-LLL-0016 ML18282A2422018-10-0808 October 2018 OEDO-18-00160, FENOC Fleet, 2.206 Petition, Submission of Supplement Dated October 8, 2018, from the Petitioners - PRB and Petitioners (Elpc), Includes Email, Cover Letter from Elpc, and the Attachments to the Email 2023-05-08
[Table view] |
Text
Lupold, Timothy From: Hills, David Sent: Wednesday, October 12, 2011 8:22 AM To: Lupold, Timothy Cc: Rezai, Ali; Neurauter, James; Sanchez Santiago, Elba
Subject:
RE: Davis-Besse shield building crack (identified during RPV head replacement)
- Tim, O.K. Thanks. I'll let Jim Neurauter, our onsite inspector, know the resource is there if he needs to consult.
Dave From: Lupold, Timothy Sent: Wednesday, October 12, 2011 6:26 AM To: Hills, David Cc: Rezai, Ali
Subject:
RE: Davis-Besse shield building crack (identified during RPV head replacement)
Dave, this is out of my area of expertise and responsibility. However, I do have one guy who is very familiar with NDE applications related to concrete. If you need any expertise in that area, let me know.
From: Hills, David Sent: Tuesday, October 11, 2011 3:51 PM To: Lupold, Timothy; Mitchell, Matthew; Khanna, Meena; Murphy, Martin; Dennig, Robert
Subject:
FW: Davis-Besse shield building crack (identified during RPV head replacement)
FYI - See below. Jim Neurauter is on site meeting with licensee on this later today and then heading out to get some pictures. So hopefully, we should have more detailed info tomorrow. Expect quite a bit of public interest given this is Davis Besse and also the previous experience at cutting a containment access hole at Crystal River. If this is something you want to be involved in and/or kept in the loop on, let me know.
Dave From: Cameron, Jamnes I Sent: Tuesday, October 11,' 2011 1:03 PM To: Mitlyng, Viktoria; Satorius, Mark; Pederson, Cynthia; West, Steven; Shear, Gary; OBrien, Kenneth; Holmberg, Mel; Neurauter, James; Kimble, Daniel; Hills, David; Wilson, Adam; Steffes, Jakob Cc: Chandrathil, Prema; Stone, AnnMarie
Subject:
RE: Davis-Besse shield building crack
- Vika, We were notified regarding the shield building late yesterday afternoon/early evening. It was discovered while they were making the access point in the shield building, and only a small portion of the crack is visible from the outside surface.
We are currently awaiting the utility's evaluation regarding the age and nature of the crack. Due to its small size, it is difficult to see unless you are very close to the shield building. We will be evaluating the licensee's assessment, as well as conducting our own assessment. The crack is not an immediate safety concern, as the shield building does not provide protection from radiological releases in an event, it provides protection to the containment building from external hazards.
We are coordinating with DRS, Jim Neurauter will be onsite later today, and will include this issue in the scope of his inspection.
1 */*,
The issue is not similar to Crystal River, where in their case, the concrete structure forms the containment building along with the steel liner. At Davis Besse, the steel containment is a separate structure approximately 5 feet inside the shield building. There is actually an access area between the containment building and the shield building.
It is not currently known whether the crack would be a restart issue. One of the aspects the utility and we have to evaluate and assess is the potential extent of condition.. .what is the likelihood of additional cracks and what might their impact be.
I'm not sure we can give you any more specifics until our technical experts have a chance to evaluate the licensee's assessment. We may be able to give you an update later tomorrow. At this time, we are not proposing to conduct a special inspection; however, this option is always available to us if additional significant information becomes available.
We'll update you tomorrow.
Jamnes From: Mitlyng, Viktoria, Sent: Tuesday, October 11, 2011 10:51 AM To: Satorius, Mark; Pederson, Cynthia; West, Steven; Shear, Gary; OBrien, Kenneth; Cameron, Jamnes; Holmberg, Mel; Neurauter, James; Kimble, Daniel; Hills, David; Wilson, Adam; Steffes, Jakob Cc: Chandrathil, Prema
Subject:
Davis-Besse shield building crack All-We spoke to FENOC's Director of Communications and were told the company would be calling the media to talk about the crack to prevent the news from "leaking out" and forestall accusations of hiding this from the public. They won't be issuing a press release.
We need to be ready with key messages by this afternoon about what actions the NRC is taking and how the agency is on the job protecting public health and safety.
Below are the questions we will get asked. We understand we don't have answers to all of them and look to you to let us know what we can address today.
We already Spoke to Adam and he gave us the information he had and was very helpful.
-Is the NRC aware of the crack?
-What can you tell us about the crack?
-When was the NRC informed about the crack?
-How come the NRC hasn't communicated to the public on this issue?
-What actions is NRC taking?
-How come there is no event report on this issue? Is it reportable to the NRC?
-Are there regulatory requirements on the condition of the shield building?
-Does it have to be inspected?
-How come neither FE nor the NRC were aware of an 8-foot long crack?
-Was it visible from the outside? So, no one was looking?
-How vulnerable does it make the containment and the reactor?
-Was the reactor safe when it was operating with a crack in the shield building?
-And if the answer is yes, how can you say that? What if there was a terrorist attack by flying a plane into the reactor?
-Is the NRC concerned about this issue? If not, why not?
-Does having the crack undiscovered constitute a violation?
2
-What is the NRC doing about this problem?
-Are there extra inspections? Does NRC have inspectors; inspections specifically to look into this?
-Is there going to be a special inspection into this problem?
-Is the public and the environment safe with the hole in the containment vessel and the shield building plus a crack in the shield building?
-Is the plant going to delay its head replacement activities and inspect the rest of the shield building for cracks?
-Do they have to fix this before restarting?
-What does it say about their safety culture?
-Did they conceal this from the NRC and the public?
-How is this different from Crystal River?
-How many other plants have had this problem? How was this problem discovered and addressed at other plants?
Thank you.
-VIka Vi] orioa Mitlyng Office of Public Affairs US Nuclear Regulatory Commission Region III Lisle, IL 60532 Tel 630/829-9662 Fax 630/51.5-1.026 e-mail: viktoria .rriitlyrng@@irc.gov 3