ML12213A341

From kanterella
Jump to navigation Jump to search
E-mail from S. Cuadrado Dejesus to A. Sheikh, Et Al, FW: Davis-Besse Shield Building Crack
ML12213A341
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 10/11/2011
From: Cuadradodejesus S
Division of License Renewal
To: Bryce Lehman, Sheikh A
Division of License Renewal
References
FOIA/PA-2012-0121
Download: ML12213A341 (2)


Text

Davis-BesseHearingFile Resource From:

CuadradoDeJesus, Samuel Sent:

Tuesday, October 11,2011 5:32 PM To:

Sheikh, Abdul; Lehman, Bryce Cc:

Davis-BesseHearingFile Resource

Subject:

FW: Davis-Besse Shield Building Crack Attachments:

CR 2011-03346.pdf FYI From: Jose, Benny Sent: Tuesday, October 11, 2011 4:50 PM To: CuadradoDeJesus, Samuel

Subject:

FW: Davis-Besse Shield Building Crack FYI From: Stone, AnnMarie Sent: Tuesday, October 11, 2011 3:38 PM To: Jose, Benny

Subject:

FW: Davis-Besse Shield Building Crack From: Wilson, Adam Sent: Tuesday, October 11, 2011 10:37 AM To: Smagacz, Phillip; Kimble, Daniel Cc: Steffes, Jakob; Rutkowski, John; Cameron, Jamnes; Briley, Thomas; Stone, AnnMarie; Holmberg, Mel; Neurauter, James; Mitlyng, Viktoria; Chandrathil, Prema

Subject:

RE: Davis-Besse Shield Building Crack Here is the CR the licensee wrote, which gives some of the detail of the size of the crack.

From: Smagacz, Phillip Sent: Tuesday, October 11, 2011 10:03 AM To: Wilson, Adam; Kimble, Daniel Cc: Steffes, Jakob; Rutkowski, John; Cameron, Jamnes; Briley, Thomas

Subject:

Davis-Besse Shield Building Crack Gentlemen, I had a request from Ann-Marie Stone to include her in any email traffic/discussion regarding the shield' building crack since it may have implications for license renewal.

Thanks, Phillip Smagacz Reactor Engineer RIII/DRP-PB6 (630) 829-9832 phillip.smagacz@nrc.gov 1

During Hydro-demrolition operations of the concrete at the outer were Identified at the bottom of the opening near the left corner inward), and at the left side of the ooeninx [facine inward) a verti lent, rracturea concrete was roun.

-racture Iines op of the opening at the upper left comer (facing r laver of rebar was found.

1jA V

4 4.1"w~F~~

A Bechtel Condition Report (25539-000-GCA-GAMG-00182) was written to Identify this condition. FENOC SGR Project Manager and Design Englneerina Mananer were notified. FENOC Desl r Engineerint and project personnel with Bechtel inspected the condition.

  • ,**.'~

~

~