ML12208A068

From kanterella
Jump to navigation Jump to search
Ltr 07/25/12 Duane Arnold License Renewal Request for Information for an NRC Post-Approval Site Inspection for License Renewal
ML12208A068
Person / Time
Site: Duane Arnold  NextEra Energy icon.png
Issue date: 07/25/2012
From: Ann Marie Stone
NRC/RGN-III/DRS/EB2
To: Richard Anderson
NextEra Energy Duane Arnold
References
Download: ML12208A068 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 July 25, 2012 Mr. Richard L. Anderson Vice President NextEra Energy Duane Arnold, LLC 3277 DAEC Road Palo, IA 52324-9785

SUBJECT:

DUANE ARNOLD ENERGY CENTER REQUEST FOR INFORMATION FOR AN NRC POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL

Dear Mr. Anderson:

On October 9, 2012, the U.S. Nuclear Regulatory Commission (NRC) will begin a Post-Approval Site Inspection for License Renewal at your Duane Arnold Energy Center. This inspection will be performed in accordance with NRC Inspection Procedure (IP) 71003. This inspection will focus on outage related activities to verify that license conditions added as part of your renewed license and a sample of license renewal commitments have been implemented.

In order to minimize the inspection impact on the site and to ensure a productive inspection for both parties, we have enclosed a request for information needed for the inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the on-site portions of the inspection. Insofar as possible, this information should be provided electronically to the lead inspector. The information request has been divided into two groups:

  • The first group lists information necessary for our initial inspection scoping and in-office preparation activities. During the in-office preparation activities, the team will identify as much as possible the information and activities to be reviewed during the inspection. This information should be provided to the lead inspector by September 21, 2012.
  • The second group includes the additional information required for the team to review the selected activities. This information should be available to the team onsite October 9, 2012.

It is also requested that corrective action documents and/or questions developed during the inspection be provided to the lead inspector as the documents are generated.

The lead inspector for this inspection is Dr. Stuart Sheldon. We understand that our primary contact for this inspection is Mr. Ken Putnam of your organization. If there are any questions about the inspection or the material requested in the enclosure, please contact the lead inspector at (630) 829-9727 or via e-mail at Stuart.Sheldon@nrc.gov.

R. Anderson This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Ann Marie Stone, Chief Engineering Branch 2 Division of Reactor Safety Docket Nos. 50-331;72-032 License No. DPR-49

Enclosure:

Document Request for Post-Approval Site Inspection for License Renewal cc w/encl: Distribution via ListServ'

DOCUMENT REQUEST FOR POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL Inspection Report: 05000331/2012008(DRS)

Inspection Dates: October 9, 2012 - October 19, 2012 Inspection Procedure: IP 71003 Post-Approval Site Inspection for License Renewal Lead Inspector: Dr. Stuart Sheldon (630) 829-9727 Stuart.Sheldon@nrc.gov I. Information Requested Prior to the On-Site Inspection Week The following information is requested by September 21, 2012, or sooner, to facilitate inspection preparation. If you have any questions regarding this information, please call the team leader as soon as possible. (Please provide the information electronically in pdf files, Excel, or other searchable formats, preferably on some portable electronic media (e.g., CDROM, DVD, etc.). The portable electronic media should contain descriptive names, and be indexed and hyperlinked to facilitate ease of use. Information in lists should contain enough information to be easily understood by someone who has knowledge of light water reactor technology).

1. Provide a list of your license renewal commitments with an approximate completion status of each.
2. Provide a list of your Aging Management Programs (AMPs), copies of the program basis documents for each, and a listing of the action tracking items for each.
3. For AMPS that are one-time inspection programs, provide a list of completed work order numbers for inspections that have been completed. This may be incorporated with the previous item and should include identification of the inspected component.
4. Provide a list of the one-time inspections credited for license renewal that will be completed during your outage. This list should include at least the system, component, work order number, and type of inspection.
5. Provide a listing of planned inspections which will be conducted during the outage, that are credited for license renewal. Of particular interest are those that provide observations of areas that are generally inaccessible at power, e.g.,

drywell liner and containment coating inspections. Include work order numbers where applicable.

6. Provide an outage schedule, sufficiently detailed as to list the work orders noted in Items 4 and 5.

1 Enclosure

DOCUMENT REQUEST FOR POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL

7. Provide current management and license renewal organizational charts.
8. Provide electronic copies of Updated Final Safety Analysis Report, Technical Specifications, Technical Specifications Bases, and Technical Requirements Manual.
9. Provide copies of any internal/external self-assessments and associated corrective action documents generated in preparation for the inspection.

II. Information Requested to be Available When the Inspectors Arrive On-Site on October 9, 2012

1. Copies of the work orders requested during the preparation week. This will include work orders of inspections to be observed and completed work orders to be reviewed by the team.
2. Contact information for the Outage Control Center to facilitate inspector observation of the selected work orders.
3. Documentation demonstrating completion of license renewal commitments which are complete as of the inspection date. For example, this may be in the form of a binder for each commitment which includes the implementing documentation and references.

III. Information Requested to be Provided Throughout the Inspection

1. Copies of any corrective action documents generated as a result of the teams questions or queries during this inspection.
2. Copies of the list of questions submitted by the team members and the status/resolution of the information requested (provide daily during the inspection to each team member).

If you have questions regarding the information requested, please contact the lead inspector.

2 Enclosure

R. Anderson This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Ann Marie Stone, Chief Engineering Branch 2 Division of Reactor Safety Docket Nos. 50-331;72-032 License No. DPR-49

Enclosure:

Document Request for Post-Approval Site Inspection for License Renewal cc w/encl: Distribution via ListServ' DISTRIBUTION:

Silas Kennedy RidsNrrDorlLpl3-1 Resource RidsNrrPMDuaneArnold Resource RidsNrrDirsIrib Resource Chuck Casto Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak DOCUMENT NAME: G:\DRSIII\DRS\Work in Progress\Ltr 072512 Duane Arnold License Renewal RFI SNS.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME SSheldon:ls AMStone DATE 07/18/12 07/25/12 OFFICIAL RECORD COPY