Letter Sequence Request |
---|
|
|
MONTHYEAR1CAN071202, Requests for Relief from American Society of Mechanical Engineers (ASME) Section XI Volumetric Examination Requirements, Fourth 10-Year Interval, First Period2012-07-25025 July 2012 Requests for Relief from American Society of Mechanical Engineers (ASME) Section XI Volumetric Examination Requirements, Fourth 10-Year Interval, First Period Project stage: Request ML12236A3362012-08-23023 August 2012 Acceptance of Requested Licensing Action E-mail - Request for Relief, ANO1-ISI-021 from ASME Section XI Volumetric Examination Requirements Fourth 10-Year Interval, First Period Project stage: Acceptance Review ML12250A7612012-09-0606 September 2012 Acceptance Review E-mail, Request for Relief No. ANO1-ISI-021, from ASME Volumetric Requirements for Full Penetration Welded Nozzles in Vessels - Inspection Program B; Fourth 10-Year ISI Interval Project stage: Acceptance Review ML13100A2472013-04-10010 April 2013 Request for Additional Information Email, Request for Relief No. ANO1-ISI-022, Relief from ASME, Section XI Volumetric Examination Requirements for the Fourth 10-Year Interval Project stage: RAI 1CAN051301, Response to Request for Additional Information on Relief Request ANO1-ISI-0222013-05-16016 May 2013 Response to Request for Additional Information on Relief Request ANO1-ISI-022 Project stage: Response to RAI ML13179A1162013-07-24024 July 2013 Request for Relief ANO1-ISI-022 from ASME Code Examination Requirements for Pressure-Retaining Welds in Piping; Fourth 10-Year Inservice Inspection Interval Project stage: Other 2012-09-06
[Table View] |
|
---|
Category:Code Relief or Alternative
MONTHYEARML23142A1062023-05-24024 May 2023 Authorization and Safety Evaluation for Alternative Request No. ANO1-ISI-035 ML22073A0952022-04-0707 April 2022 Approval of Request for Alternative from Certain Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (EPID L-2021-LLR-0084) (NON-PROPRIETARY) ML21299A0032021-10-28028 October 2021 and Waterford Steam Electric Station, Unit 3 - Approval of Request for Alternative EN-20-RR-003 from Certain Requirements of the ASME Code ML21293A0962021-10-28028 October 2021 Relief ANO2-R&R-012 Concerning Proposed Alternative for Repair of Reactor Vessel Closure Head Penetration 46 ML21168A0562021-07-0909 July 2021 Approval of Request for Alternative from Certain Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code ML21118B0392021-05-19019 May 2021 Approval of Request for Alternative from Certain Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code CNRO-2020-00016, Entergy Nuclear Operations, Inc - Relief Request EN-RR-20-002: Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv)2020-08-12012 August 2020 Entergy Nuclear Operations, Inc - Relief Request EN-RR-20-002: Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv) ML20121A1932020-05-0606 May 2020 Alternative Requests for the Fifth 10 Year Interval Inservice Testing of Low Pressure Safety Injection Pumps and Service Water Valves ML20119A0732020-04-29029 April 2020 Withdrawal of Requested Alternatives for the Fifth 10-Year Interval Inservice Testing of Service Water Pumps and Visual Examination of Snubbers ML20083J9682020-03-26026 March 2020 Approval of Request for Alternative ANO 2-PT-002 End-of-Internal System Leakage Test for Extended Reactor Coolant Pressure Boundary Piping ML19254A6032019-09-19019 September 2019 Units 2 and 3; Palisades Nuclear Plant; River Bend; and Waterford Steam Electric Station, Unit 3 - Relief Request No. EN-19-RR-1, Use of ASME Code Case N-831-1 2CAN071902, Request for Alternative ANO 2-PT-002 End-of-Interval System Leakage Test for Extended Reactor Coolant Pressure Boundary Piping2019-07-25025 July 2019 Request for Alternative ANO 2-PT-002 End-of-Interval System Leakage Test for Extended Reactor Coolant Pressure Boundary Piping ML19184A5542019-07-15015 July 2019 Request for Relief ANO1-ISI-032 from the ASME Code Section XI Visual Examination Requirements for the Fourth 10-Year Inservice Inspection Interval ML19156A4002019-06-11011 June 2019 Request for Alternative ANO2-ISI-021 to Permit Continued Application of the 2007 Edition Through the 2008 Addenda of ASME Code CNRO-2019-00002, Relief Request Number EN-19-RR-1, Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 12019-01-31031 January 2019 Relief Request Number EN-19-RR-1, Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 1 ML18128A0672018-06-0808 June 2018 Arkansas, Units 1 and 2; Grand Gulf, Unit 1; Indian Point Unit Nos. 2 and 3; Palisades; Pilgrim; River Bend Station, Unit 1; and Waterford, Unit-3 Relief Request No. EN-17-RR-1, Alternative to Use ASME Code Case N-513-4 1CAN041801, Requests for Relief from American Society of Mechanical Engineers (ASME) Section XI Volumetric Examination Requirements Fourth 10-Year Interval, Second and Third Period2018-04-23023 April 2018 Requests for Relief from American Society of Mechanical Engineers (ASME) Section XI Volumetric Examination Requirements Fourth 10-Year Interval, Second and Third Period CNRO-2017-00022, Relief Request Number EN-17-RR-1 - Proposed Alternative to Use ASME Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate-Energy Class 2 or 3 Piping, Section XI, Division 12017-11-17017 November 2017 Relief Request Number EN-17-RR-1 - Proposed Alternative to Use ASME Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate-Energy Class 2 or 3 Piping, Section XI, Division 1 ML17174B1442017-07-12012 July 2017 Relief Request for EN-ISI-16-1 Regarding Use of Later Edition and Addenda of the ASME Code ML16130A4712016-12-0909 December 2016 Request for Alternative Test Plan to American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants (CAC Nos. MF7537 and MF7538) ML16237A0822016-08-29029 August 2016 Relief Request No. ANO1-ISI-025, Relief from American Society of Mechanical Engineers Section XI Table IWB-2500-1 Requirements ML16096A2692016-06-0606 June 2016 Arkansas; Grand Gulf; James A. Fitzpatrick; Indian Point; Palisades; Pilgrim; River Bend; and Waterford - Relief Request RR-EN-15-2, Proposed Alternative to Use ASME Boiler and Pressure Vessel Code Case N-786-1 CNRO-2015-00017, Entergy Submits Relief Request RR EN-15-1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Waster Service, Section XI, D2015-06-0505 June 2015 Entergy Submits Relief Request RR EN-15-1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Waster Service, Section XI, Division ML15070A4282015-03-16016 March 2015 Relief Request ANO2-ISI-017, Alternative to Utilize ASME Code Case N-513-4 for the Fourth 10-Year Inservice Inspection Interval ML15030A2392015-02-0909 February 2015 Correction to Relief Request ANO1-ISI-024 Issued December 23, 2014; Revises 10 CFR 50.55a Citations as a Result of Changes from Final Rule Effective December 5, 2014 ML14330A2072014-12-23023 December 2014 Relief Request ANO1-ISI-024, Alternative from Volumetric/Surface Examination Frequency Requirements of ASME Code Case N-729-1, Fourth 10-year Inservice Inspection Interval ML14282A4792014-10-29029 October 2014 Relief Request ANO1-ISI-023, Volumetric Examination Frequency Requirements, for the Fourth 10-Year Inservice Inspection Interval ML14150A1632014-06-0606 June 2014 Relief Request ANO2-ISI-004 - Alternative to Extend the Third 10-Year Inservice Inspection Interval for Reactor Vessel Weld Examinations ML14099A4522014-04-15015 April 2014 Relief Request ANO2-ISI-016, from ASME Code Case N-770-1 Successive Examination, for the Fourth 10-Year Inservice Inspection Interval ML13179A1162013-07-24024 July 2013 Request for Relief ANO1-ISI-022 from ASME Code Examination Requirements for Pressure-Retaining Welds in Piping; Fourth 10-Year Inservice Inspection Interval ML13179A1102013-07-16016 July 2013 Request for Relief No. ANO1-ISI-021, from ASME Volumetric Requirements for Full Penetration Welded Nozzles in Vessels - Inspection Program B; Fourth 10-Year ISI Interval ML13161A2412013-06-27027 June 2013 Relief Request ANO2-ISI-015, from Pressure Testing Requirements for Reactor Vessel Flange Seal Leak Detection Piping for the Fourth 10-Year Inservice Inspection Interval ML13071A6342013-03-22022 March 2013 Relief Request ANO2-ISI-014, from Volumetric and Surface Exam Requirements for Pressure Retaining Welds in Austenitic Stainless Steel, Third 10-Year Inservice Inspection Interval ML13071A6632013-03-21021 March 2013 Relief Request ANO2-ISI-010, from Volumetric and Surface Exam Requirements for Pressure Retaining Welds in Piping, Third 10-Year Inservice Inspection Interval ML13032A5732013-02-21021 February 2013 Relief Request Nos. ANO2-ISI-009, ANO2-ISI-011, and ANO2-ISI-012, ASME Code Volumetric and Surface Exam Requirements for Integral Attachment and Pressure-Retaining Welds, Third 10-Year Inservice Inspection Interval ML12319A3672012-11-27027 November 2012 Relief Request ANO2-ISI-007, Alternative to Use ASME Code Case N-770-1 Baseline Examination, Fourth 10-Year Inservice Inspection Interval 1CAN071202, Requests for Relief from American Society of Mechanical Engineers (ASME) Section XI Volumetric Examination Requirements, Fourth 10-Year Interval, First Period2012-07-25025 July 2012 Requests for Relief from American Society of Mechanical Engineers (ASME) Section XI Volumetric Examination Requirements, Fourth 10-Year Interval, First Period 2CAN111101, Use of Alternate ASME Code Case N-770-1 Baseline Examination Request for Alternative ANO2-ISI-0072011-11-30030 November 2011 Use of Alternate ASME Code Case N-770-1 Baseline Examination Request for Alternative ANO2-ISI-007 ML1117107982011-08-10010 August 2011 Relief, ANO1-R&R-016, Request for Use of Non-ASME Code Repair to Service Water Piping in Accordance with Generic Letter 90-05, Fourth 10-Year Interval. ME6107 ML1034301562011-01-10010 January 2011 Relief Request ANO1-R&R-013, Proposed Alternative to Requirements Associated with Repair of Components, for Duration of ANO-1 Spring 2010 Refueling Outage 1R22 ML1035005322011-01-0505 January 2011 Request for Alternative ANO2-ISI-006, Implementation of a Risk-Informed Inservice Inspection Program Based on ASME Code Case N-716 for the Fourth 10-Year ISI Interval ML1025001282010-09-23023 September 2010 Relief Request ANO2-ISI-005 to Extend the Inservice Inspection Interval for the Visual Examination of Accessible Interior to Reactor Vessel Attachment Weld, for Fourth 10-Year Interval ML1024506542010-09-21021 September 2010 Relief Request ANO2-ISI-004 to Extend Third Inservice Inspection Interval from 10 to 20 Years for Reactor Vessel Weld Examinations ML1009103502010-08-19019 August 2010 Request for Relief PRR-ANO2-2010-1, Relief from the Requirements of Operation and Maintenance Code Section ISTB-5221 and ITSB-5223 for the Service Water Pumps ML1011701272010-06-0202 June 2010 Request for Alternative ANO1-ISI-014, to Implement a Risk-Informed Inservice Inspection Program Based on ASME Code Case N-716 ML1011701192010-05-0505 May 2010 Request for Relief Nos. ANO1-ISI-015, ANO1-ISI-016, ANO1-ISI-017, ANO1-ISI-018, ANO1-ISI-019, and ANO1-ISI-020, Relief from Requirements of the ASME Code, Section XI ML1009706592010-04-26026 April 2010 Request for Alternative ANO2-ISI-003 to Use 2001 Edition Through 2003 Addenda in Lieu of the 2004 Edition for Fourth 10-Year Inservice Inspection Interval 2CAN021002, Request for Relief PRR-ANO2-2010-1 from the Requirements of OM Code Section ISTB-5221 and ISTB-5223 for the Service Water Pumps2010-02-17017 February 2010 Request for Relief PRR-ANO2-2010-1 from the Requirements of OM Code Section ISTB-5221 and ISTB-5223 for the Service Water Pumps 2CAN011005, Supplement to Request for Alternative Implementation of a Risk-Informed Inservice Inspection Program Based on ASME Code Case N-7162010-01-28028 January 2010 Supplement to Request for Alternative Implementation of a Risk-Informed Inservice Inspection Program Based on ASME Code Case N-716 ML0923005512009-08-27027 August 2009 Request for Alternative ANO2-ISI-002 to 10 CFR 50.55a(g)(6)(ii)(D) Examination Requirements, for Remainder of Current 10-Year Inservice Inspection Interval and Fourth ISI Interval Until the Head Is Replaced 2023-05-24
[Table view] Category:Letter type:
MONTHYEAR0CAN102401, Response to Request for Additional Information - Arkansas Nuclear One – Units 1 and 2, Proposed Alternatives ANO1-ISI-24-01 and ANO2-ISI-24-01 for Examinations of Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzle2024-10-16016 October 2024 Response to Request for Additional Information - Arkansas Nuclear One – Units 1 and 2, Proposed Alternatives ANO1-ISI-24-01 and ANO2-ISI-24-01 for Examinations of Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles 2CAN102401, Cycle 31 Core Operating Limits Report (COLR)2024-10-14014 October 2024 Cycle 31 Core Operating Limits Report (COLR) 1CAN082401, Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 1 Thirty-First Refueling Outage (1R312024-08-13013 August 2024 Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 1 Thirty-First Refueling Outage (1R31 2CAN072401, Proposed Alternative for Implementation of Extended Reactor Vessel In-Service Inspection Interval (ANO2-ISI-24-02)2024-07-19019 July 2024 Proposed Alternative for Implementation of Extended Reactor Vessel In-Service Inspection Interval (ANO2-ISI-24-02) 0CAN072401, Annual 10 CFR 50.46 Report for Calendar Year 2023 Emergency Core Cooling System Evaluation Changes2024-07-0808 July 2024 Annual 10 CFR 50.46 Report for Calendar Year 2023 Emergency Core Cooling System Evaluation Changes 1CAN072401, Request for Review and Approval of Changes to the Safety Analysis Report and to a Confirmatory Order Clarifying an Alternate Means of Compliance for Pressurizer Heaters Emergency Power Supply2024-07-0202 July 2024 Request for Review and Approval of Changes to the Safety Analysis Report and to a Confirmatory Order Clarifying an Alternate Means of Compliance for Pressurizer Heaters Emergency Power Supply 0CAN062403, Groundwater Protection Initiative - Voluntary Special Report for Tritium Levels2024-06-25025 June 2024 Groundwater Protection Initiative - Voluntary Special Report for Tritium Levels 0CAN062402, Proposed Alternatives ANO1-ISI-24-01 and ANO2-ISI-24-01 for Examinations of Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles2024-06-0606 June 2024 Proposed Alternatives ANO1-ISI-24-01 and ANO2-ISI-24-01 for Examinations of Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles 0CAN052401, – Units 1 and 2, Submittal of Annual Radiological Environmental Operating Report for 20232024-05-13013 May 2024 – Units 1 and 2, Submittal of Annual Radiological Environmental Operating Report for 2023 1CAN052401, Cycle 32 Core Operating Limits Report2024-05-0404 May 2024 Cycle 32 Core Operating Limits Report 2CAN042403, Response to the Request for Additional Information Regarding ANO-2 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended C2024-04-24024 April 2024 Response to the Request for Additional Information Regarding ANO-2 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended C 0CAN042402, Annual Occupational Radiation Exposure Report for 20232024-04-23023 April 2024 Annual Occupational Radiation Exposure Report for 2023 0CAN042401, Radioactive Effluent Release Report for the 2023 Calendar Year2024-04-15015 April 2024 Radioactive Effluent Release Report for the 2023 Calendar Year 2CAN042402, Special Report of Non-functional Main Steam Line Radiation Monitor2024-04-11011 April 2024 Special Report of Non-functional Main Steam Line Radiation Monitor 2CAN042401, Request to Revise Typographical Errors in Arkansas Nuclear One, Unit 2 Technical Specifications2024-04-0404 April 2024 Request to Revise Typographical Errors in Arkansas Nuclear One, Unit 2 Technical Specifications 2CAN012401, U.S. Additional Protocol2024-01-17017 January 2024 U.S. Additional Protocol 2CAN012403, Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42024-01-11011 January 2024 Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 0CAN012401, Registration of Cask Use2024-01-10010 January 2024 Registration of Cask Use 1CAN122301, Responses to Request for Additional Information for Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISl-037)2023-12-14014 December 2023 Responses to Request for Additional Information for Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISl-037) 2CAN112302, Submittal of Amendment 31 to Safety Analysis Report2023-11-16016 November 2023 Submittal of Amendment 31 to Safety Analysis Report 0CAN102303, Registration of Cask Use2023-10-24024 October 2023 Registration of Cask Use 0CAN102302, (ANO) Emergency Plan Revision 49 and Emergency Plan On-Shift Staffing Analysis Revision 32023-10-11011 October 2023 (ANO) Emergency Plan Revision 49 and Emergency Plan On-Shift Staffing Analysis Revision 3 0CAN102301, Evacuation Time Estimate (ETE) Study2023-10-0404 October 2023 Evacuation Time Estimate (ETE) Study 1CAN092301, Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42023-09-21021 September 2023 Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 0CAN092302, Supplement to Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002)2023-09-14014 September 2023 Supplement to Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002) 2CAN092301, Reply to a Notice of Violation2023-09-0808 September 2023 Reply to a Notice of Violation 0CAN092301, Emergency Plan Implementing Procedure Revision2023-09-0505 September 2023 Emergency Plan Implementing Procedure Revision 0CAN082301, Units 1 and 2 - Changes to the Quality Assurance Program Approval Form for Radioactive Material Package No. 03412023-08-17017 August 2023 Units 1 and 2 - Changes to the Quality Assurance Program Approval Form for Radioactive Material Package No. 0341 2CAN082301, Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 2, Twenty-Ninth Refueling Outage (2R29)2023-08-10010 August 2023 Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 2, Twenty-Ninth Refueling Outage (2R29) 0CAN072301, Registration of Cask Use2023-07-18018 July 2023 Registration of Cask Use 1CAN062304, Supplement Related to License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation2023-06-29029 June 2023 Supplement Related to License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation 0CAN062301, Status of Actions to Return to Compliance2023-06-26026 June 2023 Status of Actions to Return to Compliance 0CAN062302, Submittal of Revision 22 of the ANO Fire Hazards Analysis2023-06-20020 June 2023 Submittal of Revision 22 of the ANO Fire Hazards Analysis 1CAN062301, Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISI-037)2023-06-0808 June 2023 Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISI-037) 0CAN052303, Annual 10 CFR 50.46 Report for Calendar Year 20222023-05-24024 May 2023 Annual 10 CFR 50.46 Report for Calendar Year 2022 0CAN052302, Emergency Plan Rev. 482023-05-11011 May 2023 Emergency Plan Rev. 48 0CAN052301, Units 1 and 2 - Annual Radiological Environmental Operating Report for 20222023-05-0909 May 2023 Units 1 and 2 - Annual Radiological Environmental Operating Report for 2022 2CAN052301, Cycle 30 Core Operating Limits Report (COLR)2023-05-0303 May 2023 Cycle 30 Core Operating Limits Report (COLR) 0CAN042302, Annual Occupational Radiation Exposure Report for 20222023-04-27027 April 2023 Annual Occupational Radiation Exposure Report for 2022 0CAN042301, Radioactive Effluent Release Report for 20222023-04-14014 April 2023 Radioactive Effluent Release Report for 2022 2CAN042301, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42023-04-0505 April 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 1CAN032301, License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure2023-03-30030 March 2023 License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure 2CAN032304, Supplement to the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 462023-03-29029 March 2023 Supplement to the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 2CAN032303, Responses to Request for Additional Information Concerning the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 462023-03-29029 March 2023 Responses to Request for Additional Information Concerning the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 2CAN032305, 03 Post Examination Analysis2023-03-23023 March 2023 03 Post Examination Analysis 1CAN032302, Inspection Summary Report for the Thirtieth Refueling Outage (1R30)2023-03-20020 March 2023 Inspection Summary Report for the Thirtieth Refueling Outage (1R30) 1CAN012301, Responses to Request for Additional Information for Request for Relief ANO1-ISI-0352023-01-30030 January 2023 Responses to Request for Additional Information for Request for Relief ANO1-ISI-035 2CAN012303, U.S. Additional Protocol2023-01-23023 January 2023 U.S. Additional Protocol 2CAN012302, Relief Request ANO2-RR-23-001, Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 462023-01-20020 January 2023 Relief Request ANO2-RR-23-001, Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 1CAN122201, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42022-12-22022 December 2022 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 2024-08-13
[Table view] |
Text
Entergy Operations, Inc.
1448 S.R. 333 Russellville, AR 72802 Tel 479-858-4704 Stephenie L. Pyle Manager, Licensing Arkansas Nuclear One 1CAN071202 July 25, 2012 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
SUBJECT:
Requests for Relief from American Society of Mechanical Engineers (ASME)
Section XI Volumetric Examination Requirements Fourth 10-Year Interval, First Period Arkansas Nuclear One, Unit 1 Docket No. 50-313 License No. DPR-51
Dear Sir or Madam:
Pursuant to 10 CFR 50.55a(g)(6)(i), Entergy Operations, Inc. (Entergy) requests relief from the requirements of the ASME, Boiler and Pressure Vessel Code,Section XI pertaining to volumetric examinations at Arkansas Nuclear One, Unit 1 (ANO-1). In several locations it was determined that the examinations were impractical due to interference or geometry. Individual relief requests are provided in the attachments, divided by examination category.
10 CFR 50.55a(g)(5)(iv) requires that the basis for the determination of impracticality be submitted to the NRC for review and approval within 12 months after the expiration of the 120-month inspection interval. These reliefs are for the fourth ANO-1 10-year Inservice Inspection interval, first period. The interval and first period started on May 31, 2008. The first period ended May 30, 2011.
There are no new regulatory commitments made in this submittal.
If you have any questions or require additional information, please contact me.
Sincerely, Original signed by David B. Bice for S. L. Pyle SLP/rwc Attachments:
- 1. Request for Relief - ANO1-ISI-021
- 2. Request for Relief - ANO1-ISI-022
1CAN071202 Page 2 of 2 cc: Mr. Elmo E. Collins Regional Administrator U. S. Nuclear Regulatory Commission, Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 NRC Senior Resident Inspector Arkansas Nuclear One P. O. Box 310 London, AR 72847 U. S. Nuclear Regulatory Commission Attn: Mr. Kaly Kalyanam MS O-8 B1 One White Flint North 11555 Rockville Pike Rockville, MD 20852 Mr. Bernard R. Bevill Arkansas Department of Health Radiation Control Section 4815 West Markham Street Slot #30 Little Rock, AR 72205
Attachment 1 to 1CAN071202 Request for Relief ANO1-ISI-021 to 1CAN071202 Page 1 of 5 REQUEST FOR RELIEF ANO1-ISI-021 Components / Pressurizer Nozzle Welds 012 and 05-013 Numbers:
Code Classes: American Society of Mechanical Engineers (ASME) Code Class 1
References:
ASME Section XI 2001 Edition w/ 2003 Addenda, Table IWB-2500-1 Code Case N-460 Examination Category: B-D Item Number(s) B3.110
==
Description:==
Full Penetration Welded Nozzles in Vessels - Inspection Program B Unit / Inspection Arkansas Nuclear One, Unit 1 (ANO-1) / Fourth (4th) 10-Year Interval Applicability: Interval, First (1st) Inspection Period I. CODE REQUIREMENTS ASME Section XI, Table IWB-2500-1, Examination Category B-D, Full Penetration Welded Nozzles in Vessels - Inspection Program B:
Item B3.110 requires a volumetric examination of Pressurizer Nozzle-to-Vessel Weld volume, as depicted in Figures IWB-2500-7(a) through (d), as applicable.
II. RELIEF REQUEST Pursuant to 10 CFR 50.55a(g)(6)(i), Entergy Operations, Inc. (Entergy) requests relief from achieving the Code-required coverage when performing volumetric examinations of the components identified in Table 1.
III. BASIS FOR RELIEF During ultrasonic examination of the non-Appendix VIII Pressurizer Nozzle-to-Vessel welds listed in Table 1, greater than 90% coverage of the required examination volume could not be obtained. Examinations were performed utilizing Entergy approved procedures specific to ferritic vessels greater than 2 inches in thickness.
Due to the geometric configuration of the components, effective volumetric examination could only be performed from the shell side of the welds. The use of 0, 45 and 60 beam angles in the axial and circumferential direction were not able to achieve greater than 90% code required volume as required by Code Case N-460. See Table 1 for additional information.
to 1CAN071202 Page 2 of 5 Radiography is not practical on these types of nozzle-to-vessel weld configurations, which prevent placement of the film and exposure source. To effectively perform any significant additional Code allowable ultrasonic examinations, modification and/or replacement of the component would be required. The examinations performed on the subject items in addition to the examination of other vessel welds contained in the Inservice Inspection program would detect generic degradation, if it existed, therefore demonstrating an acceptable level of integrity.
IV. PROPOSED ALTERNATIVE EXAMINATIONS No alternative testing is proposed at this time. Entergy has examined these welds to the extent practical and will continue to perform pressure testing on the subject components as required by the Code.
V. CONCLUSION 10 CFR 50.55a(g)(6)(i) states:
The Commission will evaluate determinations under paragraph (g)(5) of this section that Code requirements are impractical. The Commission may grant such relief and may impose such alternative requirements as it determines is authorized by law and will not endanger life or property or the common defense and security and is otherwise in the public interest giving due consideration to the burden upon the licensee that could result if the requirements were imposed on the facility.
Entergy believes that it is impractical to obtain greater examination coverage on these welds. To effectively obtain significant additional coverage would necessitate modification and/or replacement of the component. The examinations performed on the subject welds, in addition to the examination of similar welds contained in the program, would detect generic degradation, if it existed, demonstrating an acceptable level of integrity. Entergy requests the proposed relief be authorized pursuant to 10 CFR 50.55a(g)(6)(i).
to 1CAN071202 Page 3 of 5 Table 1 Limited B-D Examinations Component Description Additional Information Estimated %
Item Comp. Item Coverage of Exam Method Surface Exam Examination Summary Scan Plan Search Units Number ID Description Code Required and Limitations Examination Results Volume B3.110 05-012 Pressurizer 36.6 This is essentially a single sided exam See the attached Manual UT Wave modalities None Intermittent (PZR) Spray from the vessel surface due to the sketch (Figure 1) Effective are longitudinal and required. geometric Nozzle-to-Head component configuration. Both the derived from volumetric shear. indications at Circumferential nozzle and head are carbon steel with ultrasonic testing examination Insonification the nozzle Weld stainless steel cladding on the inside (UT) examination could only be angles included 0°, bore were surface. report 1-ISI-UT obtained from 45°, and 60°. observed 021 on file at ANO. the PZR head and surface. recorded.
B3.110 05-013 PZR Safety 42.0 This is essentially a single sided exam See the attached Manual UT Wave modalities None Intermittent Valve Nozzle-to- from the vessel surface due to the sketch (Figure 2) Effective are longitudinal and required. geometric Head component configuration. Both the derived from UT volumetric shear. indications at Circumferential nozzle and head are carbon steel with examination report examination Insonification the nozzle Weld stainless steel cladding on the inside 1-ISI-UT-10-022 on could only be angles included 0°, bore were surface. file at ANO. obtained from 45°, and 60°. observed the PZR head and surface. recorded.
to 1CAN071202 Page 4 of 5 Figure 1 Scan Plan and Coverage for Component 05-012 (Shaded area depicts code-required volume)
Not to Scale 0° 60° 45° Not Examined Weld to 1CAN071202 Page 5 of 5 Figure 2 Scan Plan and Coverage for Component 05-013 (Shaded area depicts code-required volume)
Not to Scale 0° 60° 45° Not Examined Weld
Attachment 2 to 1CAN071202 Request for Relief ANO1-ISI-022 to 1CAN071202 Page 1 of 7 REQUEST FOR RELIEF ANO1-ISI-022 Components / See Table 1 Numbers:
Code Classes: American Society of Mechanical Engineers (ASME) Code Class 1
References:
ASME Section XI 2001 Edition w/2003 Addenda, Table IWB-2500-1 Code Case N-716 Code Case N-460 Examination Category: B-J (R-A)
Item Number(s) B9.11 (R1.11; R1.11 / 16)
==
Description:==
Pressure Retaining Welds in Piping Unit / Inspection Arkansas Nuclear One, Unit 1 (ANO-1) / Fourth (4th) 10-Year Interval Applicability: Interval, First (1st) Inspection Period I. CODE REQUIREMENTS ASME Section XI, Table IWB-2500-1, Examination Category B-J, Pressure Retaining Welds in Piping - Inspection Program B:
Item B9.11, as allowed by the Risk Informed process, requires a volumetric examination of circumferential piping welds nominal pipe size 4 inches or larger, as depicted in Figures IWB-2500-8 and Risk Informed Inservice Inspection Evaluation Procedure, Electric Power Research Institute (EPRI) Report No. TR-106706.
ASME Code Case N-460 allows a reduction in Class 1 examination coverage due to interference or geometry, provided the reduction is less than 10%.
The examinations listed in Table 1 are Performance Demonstrated Initiative (PDI) examinations. With the implementation of Appendix VIII, only 1/2 Vee path examinations have been allowed to be used in austenitic materials and angle beams are no longer credited to extend beyond the centerline of austenitic welds for consideration of Code coverage, in accordance with qualified PDI procedures. Additional discussion, as to the examination coverage determination process when using Appendix VIII techniques on single-sided austenitic welds, is provided in Section III of this relief request.
II. RELIEF REQUEST Pursuant to 10CFR50.55a(g)(6)(i), Entergy Operations, Inc. (Entergy) requests relief from achieving greater than 90% coverage when performing volumetric examinations of the components identified in Table 1.
to 1CAN071202 Page 2 of 7 III. BASIS FOR RELIEF During ultrasonic examination of the piping welds listed in Table 1, greater than 90%
coverage of the required examination volume could not be obtained as required by Code Case N-460.
Access for axial scanning was limited on the upstream side of weld 22-064 at top dead center due to interference of a weld-o-let and on the downstream side of weld 22-064 at bottom dead center due to interference of an adjacent pipe run.
Access was limited to single side on weld 22-060 due to pipe-to-valve configuration for both axial and circumferential scans. See Table 1 for additional information.
Class 1 piping and components are often designed with welded joints such as nozzle-to-pipe, pipe-to-valve and pipe-to-pump which can physically obstruct a large portion of the required examination volume. For the weld 22-060, the examination was performed after the 10 CFR 50.55a mandatory implementation date for Appendix VIII of Section XI, and Code coverage percentages, provided, reflect what is currently allowed by qualified Appendix VIII techniques. Appendix VIII qualified PDI procedures have demonstrated that sound beams may potentially be attenuated and distorted when required to pass through austenitic weld metal. Still, the PDI qualified methods employ the best available technology for maximizing examination coverage of these types of welds. Examination was extended to the far side of the weld to the extent permitted by geometry, but this portion of the examination is not included in the reported coverage for welds examined under PDI and Appendix VIII rules.
Entergy has used the best available and EPRI approved techniques to examine the subject piping welds. To improve upon these examination coverage percentages, modification and/or replacement of the component would be required. Consistent with the ASME Section XI sampling approach, examination of the subject welds, when combined with examinations that have been performed on other welds within the same Examination Category, is adequate to detect generic degradation, if it existed, therefore demonstrating an acceptable level of integrity.
IV. PROPOSED ALTERNATIVE EXAMINATIONS No alternative testing is proposed at this time. Entergy has examined the subject welds to the extent practical and will continue to perform pressure testing and VT-2 visual examination in accordance with ASME Section XI requirements to compliment the limited examination coverage after each refueling outage.
to 1CAN071202 Page 3 of 7 V. CONCLUSION 10 CFR 50.55a(g)(6)(i) states:
The Commission will evaluate determinations under paragraph (g)(5) of this section that Code requirements are impractical. The Commission may grant such relief and may impose such alternative requirements as it determines is authorized by law and will not endanger life or property or the common defense and security and is otherwise in the public interest giving due consideration to the burden upon the licensee that could result if the requirements were imposed on the facility.
Entergy believes that it is impractical to obtain greater examination coverage on these areas. To obtain additional coverage would necessitate modification and/or replacement of the component. The examinations performed on the subject areas, in addition to the examination of similar welds contained in the program would detect generic degradation, if it existed, demonstrating an acceptable level of integrity. Therefore, Entergy requests the proposed relief be authorized pursuant to 10 CFR 50.55a(g)(6)(i).
to 1CAN071202 Page 4 of 7 Table 1 Limited B-J (R-A) Examinations Component Description Additional Information Estimated %
Item Comp. Item Exam Method Surface Exam Coverage of Code Examination Summary Scan Plan Search Units Number ID Description and Limitations Examination Results Required Volume B9.11 22-064 Pipe-to-Elbow Axial - 83.8 Component was scanned from See the attached Manual UT Wave modality was None Intermittent (R1.11) Circumferential Circumferential - both sides; however scanning of sketch (Figure 1) See the detailed shear. required. root Weld 91.9 the required code volume was derived from sketch (Figure 2) Insonification geometry limited in the axial direction from ultrasonic testing of the limitations angles included observed Cumulative - the upstream side due to a weld-o- (UT) examination and recorded 87.8 and their 45°, 60°, and 70°.
let and in both the axial and report 1-ISI-UT proximity to the 360° on the circumferential direction on the 019 on file at ANO. component. down-stream downstream side by an adjacent side.
run of piping B9.11 22-060 Pipe-to-Valve Axial - 50 This is essentially a single sided See the attached Manual UT Wave modality was None Intermittent (R1.11 / Circumferential Circumferential - examination from the stainless sketch (Figure 3) A detailed sketch shear. required. root
- 16) Weld 50 steel piping side due to the derived from UT (Figure 3) of the Insonification geometry component configuration. Axial examination report limitation is angles included observed Cumulative - 50 and circumferential scanning was 1-ISI-UT-10-018 on and recorded included with the 45°, 60°, and 70°.
performed from the valve side to file at ANO. scan plan. 360° on the the extent possible. No code down-stream credit is being claimed for these side.
scans.
to 1CAN071202 Page 5 of 7 Figure 1 Scan Plan and Coverage for Component 22-064 Not to Scale CL 60° 60° 60° PIPE 60° ELBOW B C D E F G H I A
FLOW to 1CAN071202 Page 6 of 7 Figure 2 Limitation for Component 22-064 Not to Scale
.7 22-064 1.5 TOP VIEW 22-064 SIDE VIEW 22-065 1.5 LENGTH OF WELD OBSTRUCTED ON ELBOW SIDE to 1CAN071202 Page 7 of 7 Figure 3 Scan Plan and Coverage for Component 22-060 Not to Scale VALVE PIPE CL 2.25 MHz 60° 60° 70° A B C D E F FLOW