ML12201A096
| ML12201A096 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek |
| Issue date: | 07/10/2012 |
| From: | Matthew Sunseri Wolf Creek |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| RIS 2012-07 | |
| Download: ML12201A096 (2) | |
Text
WeLF CREEK
'FNUCLEAR OPERATING CORPORATION Matthew W. Sunseri President and CEO July 10, 2012 WM 12-0015 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
Docket No. 50-482: Response to NRC Regulatory Issue Summary (RIS) 2012-07, "Preparation and Scheduling of Operator Licensing Examinations" Gentlemen:
Regulatory Issue Summary (RIS) 2012-07, "Preparation and Scheduling of Operator Licensing Examinations," requests licensees to voluntarily submit information to aid in the preparation and scheduling of operator licensing examinations.
In response to RIS 2012-07, Wolf Creek Nuclear Operating Corporation is providing an estimate of the number of generic fundamentals examinations for years 2014 and 2015, as well as the number of license examinations for years 2014 through 2017. Enclosed with this letter is the completed NRC Form 536 containing Wolf Creek Generating Station's operator licensing examination and scheduling data.
This letter contains no commitments. If you have any questions concerning this matter, please contact me at (620) 364-4008, or Mr. Gautam Sen at (620) 364-4175.
Sincerely, Matthew W. Sunseri MWS/rlt Enclosure cc:
T. A. Beltz (NRC), w/e E. E. Collins (NRC), w/e M. S. Haire (NRC), w/e N. F. O'Keefe (NRC), w/e Senior Resident Inspector (NRC), w/e P.O. Box 411 / Burlington, KS 66839 / Phone: (620) 364-8831 An Equal Opportunity Employer M/F/HCNET
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 0913012014 (9-2011)
Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Information Services Branch OPERATOR LICENSING (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, orby internet e-EXAMINATION DATA mail to lnfocoliects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503.
If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION Wolf Creek Generating Station IV A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 14 CY 15 CY 16 CY 17 ESTIMATED NUMBER OF LICENSEE-PREPARED 0
1 0
1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0
0 0
0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 14 CY 15 CY 16 CY 17 NUMBER OF REACTOR 0
6 0
6 OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 0
3 0
3 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 0
3 0
3 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0
0 0
0 PROPOSED DATES PRIMARY DATE 08/17/2015 08/14/2017 ALTERNATE DATE 08/24/2015 08/21/2017 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 14 CY 15 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 9
CANDIDATES NRC FORM 536 (9-2011)