UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 30, 2012 Mr. Barry S. Allen Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station Mail Stop A-DB-3080 5501 North State Route 2 Oak Harbor, OH 43449-9760
SUBJECT:
DAVIS-BESSE NUCLEAR POWER STATION, UNIT NO.1 - WITHDRAWAL OF AN AMENDMENT REQUEST (TAC NO. ME8746)
Dear Mr. Allen:
By letter dated May 23,2012 (Agencywide Documents Access Management System (ADAMS)
Accession No. ML12144A383), you applied for an amendment to the Davis-Besse Nuclear Power Station, Unit No.1, Operating License No. NPF-3. The proposed change would have modified the facility technical specifications by changing the minimum voltage acceptance criterion for emergency diesel generator surveillance testing in surveillance requirements 3.8.1.8 and 3.8 1.14 from greater than or equal to 4031 volts to greater than or equal to 4070 volts.
Subsequently, by letter dated July 16, 2012 (ADAMS Accession No. ML12199A056), you withdrew the amendment request.
The purpose of this letter is to advise that the above-cited application is being treated as withdrawn. Notice of Consideration of Issuance of the proposed amendment had not been published in the Federal Register.
S2/~eIY, II
()/W ();
Michael Mahoney. Projectl anager Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-346 cc: Distribution via Listserv
9/12 Mr. Barry S. Allen Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station Mail Stop A-DB-3080 5501 North State Route 2 Oak Harbor, OH 43449-9760
SUBJECT:
DAVIS-BESSE NUCLEAR POWER STATION, UNIT NO.1 - WITHDRAWAL OF AN AMENDMENT REQUEST (TAC NO. ME8746)
Dear Mr. Allen:
By letter dated May 23,2012 (Agencywide Documents Access Management System (ADAMS)
Accession No. ML12144A383), you applied for an amendment to the Davis-Besse Nuclear Power Station, Unit No.1, Operating License No. NPF-3. The proposed change would have modified the facility technical specifications by changing the minimum voltage acceptance criterion for emergency diesel generator surveillance testing in surveillance requirements 3.8.1.8 and 3.8.1.14 from greater than or equal to 4031 volts to greater than or equal to 4070 volts.
Subsequently, by letter dated July 16, 2012 (ADAMS Accession No. ML12199A056), you withdrew the amendment request.
The purpose of this letter is to advise that the above-cited application is being treated as withdrawn. Notice of Consideration of Issuance of the proposed amendment had not been published in the Federal Register.
Sincerely, IRA /
Michael Mahoney, Project Manager Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-346 cc: Distribution via Listserv DISTRIBUTION:
PUBLIC RidsAcrsAcnw _MaiICTR Resource Branch Reading RidsNrrDorlDpr Resource RidsNrrLASRohrer Resource RidsNrrDorlLpl3-2 Resource RidsOgcRp Resource RidsNrrPMMMahoney Resource RidsRgn3MailCenter Resource RidsNrrDeEeeb Resource RidsDssStsb Resource ADAMS Accession No. ML12200A387 OFFICE NRR/LPL3-2/PM NRR/LPL3-2/LA NRR/LPL3-2/BC NRR/LPL3-2/PM NAIVI E IVIMahoney MDudek MMahoney TE 7/19/12 7/24/12 7/30/12 OFFICIAL AGENCY RECORD