ML12199A012

From kanterella
Jump to navigation Jump to search
Training and Qualification Plan, and Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program Revision 12
ML12199A012
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 07/13/2012
From: Armstrong J
Exelon Generation Co
To:
Document Control Desk, NRC/FSME
References
Download: ML12199A012 (3)


Text

4ff/IffJI SAFEGUARDS INFORMATION PNlll!J}f/

~ Exelon GenerationD July 13, 2012 U.S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, D.C. 20555-0001 Peach Bottom Atomic Power Station, Units 1, 2 and 3 Facility Operating License Nos. DPR-12, DPR-44 and DPR 56 NRC Docket Nos. 50-171,50-277,50-278 and 72-29

Subject:

Peach Bottom Atomic Power Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program Revision 12 In accordance with 10 CFR 50.54, "Conditions of licenses," paragraph (p)(2), Exelon Generation Company, LLC (EGC) is submitting Revision 12 to the Peach Bottom Atomic Power Station (PBAPS) Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program (Security Plan). The changes to the PBAPS Security Plan were implemented on July 13, 2012. In accordance with 10 CFR 50.54(p)(2), EGG is submitting this change within 60 days of implementation (I.e., no later than September 10,2012).

The PBAPS Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program have been revised to:

1. Incorporate template changes contained in NEI 03-12, revision 7, Template for the Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Indipendent Spent Fuel Storage Installation Security Program.
2. Remove text from Appendix B Task 23 based on NRC staff recommendations contained in Security Frequently Asked Question (SFAQ) 12-03.
3. Incorporate revised text regarding the definition of "Watchperson" in Appendix A and test into Section 3.1 in Appendix B based on NRC staff recommendations contained SFAQ 12-04.
4. Include revised language regarding Appendix C, Event 21 based on NRC staff recommendations contained in SFAQ 12-05.

SAFEGUARDS INFORMATION ATTACHMENT 1 CONTAINS SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED

+5~E2-D k\\ j\\.-\\.S S.;lb SDO{

SAFEGUARDS INFORMATION U.S. Nuclear Regulatory Commission July 13, 2012 Page 2

5. Revised second paragraph of section 14.4.4 regarding search requirements of armed security officers re-entry into PA based on NRC staff recommendations contained in SFAQ 12-06.
6. Appendix C, Section 4.3 revised to reflect the correct section referencing the Contingency Plan.

EGC has concluded that the changes do not decrease the safeguards effectiveness of the PBAPS Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, and Independent Spent Fuel Storage Insta"ation Security Program. contains Safeguards Information. Therefore, EGC requests that t~is information be withheld from public disclosure in accordance with 10 CFR 2.390, "Public inspections, exemptions, requests for withholding," paragraph (a)(1 )(i), and 10 CFR 73.21, "Requirements for the protection of safeguards information," paragraph (b)(1)(i).

If you have any questions or require additional information, please contact Shelly Griffith at 717-456-3025.

Respectfully,

~~

Manager, Site Regulatory Assurance Exelon Generation Company, LLC Attachments: 1. Peach Bottom Atomic Power Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 12 including Figures 1, 2, 3, and 4 (Contains Safeguards Information)

2. SY-AA-101-104-F-03, Table of Changes for Site Security Plan Change

. Submittals (Contains Safeguards Information) cc:

Regional Administrator - NRC Region Iw/attachments SAFEGUARDS INFORMATION ATTACHMENT 1 CONTAINS SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED

SAFEGUARDS INFORMATION U.S. Nuclear Regulatory Commission July 13, 2012 Page 3 CCN: 12-54 bcc:

Sr. Vice President, Mid-Atlantic Operations Sr. Vice President, Operations Support Vice President, Engineering Site Vice President, PBAPS Plant Manager, PBAPS Director, Operations, PBAPS Director, Security Manager, Site Security, PBAPS Director, Site Training, PBAPS Manager, Regulatory Assurance, PBAPS Manager, Licensing - KSA3-E D. Walker - KSA3-E Commitment Coordinator - KSA 3-E Records Management - KSA 1-N-1 SAFEGUARDS INFORMATION ATTACHMENT 1 CONTAINS SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED wlo attachments