ML12191A038

From kanterella
Jump to navigation Jump to search
Response to RIS 2012-07, Preparation and Scheduling of Operator License Examinations
ML12191A038
Person / Time
Site: Ginna Constellation icon.png
Issue date: 07/03/2012
From: Geckle M
Constellation Energy Nuclear Group, Ginna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RIS-12-007
Download: ML12191A038 (4)


Text

Mark A. Geckle R.E. Ginna Nuclear Power Plant, LLC Manager, Nuclear Training Department 1503 Lake Road Ontario, New York 14519-9364 585.771.5214 Mark.Geckle@cengllc.com CENG a joint venture of A

O EnergyeD Constelatilon eD July 3, 2012 U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 ATTENTION: Document Control Desk

SUBJECT:

R.E. Ginna Nuclear Power Plant Docket No. 50-244 Response to RIS 2012-07, Preparation and Scheduling of Operator License Examinations Attached you will find NRC Form 536 providing R.E. Ginna's expected license examination schedule information.

Should you have any questions, please contact Mr. Kyle Garnish, General Supervisor, Operations Training, at 585-771-5321.

-* t Mark A. Geckle

Enclosure:

Operator Licensing Examination Data, Form 536 cc (w/enc): W. M. Dean, NRC M. C. Thadani, NRC Resident Inspector, NRC p(Dn-3X-(4&

Document Control Desk July 2, 2012 Page 2 bcc: C. W. Fleming E. P. Perkins T. L. Harding M. A. Geckle K. G. Garnish COMMITMENTS IDENTIFIED IN THIS CORRESPONDENCE:

0 None

ENCLOSURE Operator Licensing Examination Data, Form 536 R.E. Ginna Nuclear Power Plant, LLC July 3, 2012

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 09/30/2014 (9-2011) Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Information Services Branch OPERATOR LICENSING (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by intermet e-mail to tnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and EXALMINATION DATA Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION R. E. Ginna Nuclear Power Plant, LLC A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2014 CY2015 CY 2016 CY 2017 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2014 CY 2015 CY 2016 CY 2017 NUMBER OF REACTOR 10 0 10 8 OPERATORS NUMBER OF SENIOR REACTOR OPERATORS-INSTANT 5 0 5 7 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 3 0 3 3 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 07/14/2014 02/22/2016 07/31/2017 ALTERNATE DATE 07/21/2014 02/29/2016 08/07/2017 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2014 CY 2015 PROPOSED NUMBER MARCH AC JUNE UE SEPTEMBE SPEBRDECEMBE 1 ER MARCH MRH JUNE UN SEP SETEMBE 1 DECME ECEMBER ESTIMATED NUMBER OF 0 0 15 0 0 0 0 CANDIDATES NRC FORM 536 (9-2011)