July 6, 2012 414 Nicollet Mall - MP4 Minneapolis, MN 55401 L-XE-12-008 RIS 2012-07 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Prairie Island Nuclear Generating Plant, Monticello Nuclear Generating Plant Units 1 and 2 Docket 50-263 Dockets 50-282, 50-306 Renewed License No. DPR-22 Renewed License Nos. DPR-42 and DPR-60 Operator Examination Data As requested by NRC Regulatory Issue Summary 2012-07, "Preparation and Scheduling of Operator Licensing ExaminationsJJ, dated June 8, 2012, Northern States Power Company, a Minnesota corporation, hereby submits the operator licensing examination data for calendar years 2014 through 2017 for the Monticello Nuclear Generating Plant and Prairie lsland Nuclear Generating Plant. Enclosed are the corresponding NRC Form 536s for each site which provide the estimated number of applicants to be tested and the proposed primary and alternate dates for the examinations.

Regulatory Commitments Paula derson Director, Nuclear Licensing and Regulatory Affairs Northern States Power Company - Minnesota Enclosure cc: Administrator, Region Ill, USNRC Project Manager, Prairie lsland Nuclear Generating Plant, USNRC, NRR Resident Inspector, Prairie lsland Nuclear Generating Plant, USNRC Project Manager, Monticello Nuclear Generating Plant, USNRC, NRR Resident Inspector, Monticello Nuclear Generating Plant, USNRC

ENCLOSURE Operator Licensing Examination Data for Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant, Units I and 2 2 pages follow

Estimaled burden per response lo cwnpb vn'h Utls voluntary Intonation collection requesl OPERATOR LICENSING EXAMINATION DATA hour.

This lnfoniation i collection is 'used io plan budgels and resources for beri examinalions. Send comments regarding burden eslinlate to the Infonation Senices Brar (T-5 FS3), U.S. Nuclear Regulatory Commission, Washimglon, DC 20555.0001,or by inlerne mail lo Inlocallects.Resource@nrc.gov, and lo the Desk Oficer, Office of tntona$on ;

Re@ula(o~y Arab, NE0840202, (3160-OW), Olce of F,!anagement and Budgel, Washingt DC 20503.

if a means used to Coose an informalion coilecbn does nol disolav a cuner may not conductor sponsor, and a person iindt requirec Prairie Island Nuclear Generating Plant Unit I and 2 l3 ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS B, INITIAL OPERATOR LICENSE EXAMlNAYIONS PROPOSED NUMBER c y 2014 -

CY 2015 -

CY2016 -

CY 2017 -

NUMBER OF REACTOR OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 1

NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE ALTERNATE DATE

>. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE)

SCHEDULE CY 2015 C FORM 536 (9-2011)

NRC FORM 636 (9-2011)

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION (gaoti)

OPERATOR LICENSING EXAMINATION DATA APPROVED B Y OMB: NO* 3150-0131 EXPIRES: 0913012014 Estimated burden per response to comply with lhls volunlary informalion colleclion requesl: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

This Information collection is used to plan budgets and resources for operator examinalions. Send commenls regarding burden estimate lo h e Informalion Services Branch (T-5 F53), U.S. Nuclear Regulaloiy Commission, Washinglon, DC 20555-0001, or by inlernete-mall lo Infocoliecls.Resource@nrc.gov, and lo Ihe Desk Officer, Ofke of Information and Regulatory Affairs, NEOB-10202, (3/500131),

O l t e of Management and Budget, Washington, DC 20503.

If a means used lo Impose an informalion colleclion doss no1 display a cunenUy valid OM0 conlrol number, Ihe NRC may not conduct or sponsor, and a person Is not required lo respond to, lhe Information colleclion.

FACILITY Monticello Nuclear Generating Plant NRC REGION 3

A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 2016 -

1 CY 201 5 -

1 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS CY 2017 -

CY 20 14 -

B, INITIAL OPERATOR LICENSE EXAMINATIONS CY2017 -

0 0

0 0

PROPOSED NUMBER NUMBER OF REACTOR OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSEDDATES PRIMARY DATE ALTERNATE DATE CY 2015 -

6 5

1 0

2/16/2015 2/09/20 15 CY 20 14 -

0 0

0 0

C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY2016 -

5 5

2 0

11/07/2016 10/31/2016 PROPOSED NUMBER ESTIMATED NUMBER OF CANDIDATES CY 2015 -

CY 2014 7

DECEMBER MARCH 10 MARCH JUNE SEPTEMBER JUNE SEPTEMBER DECEMBER