ML12184A054

From kanterella
Jump to navigation Jump to search
Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Plan, Revision 16
ML12184A054
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 07/02/2012
From: Hettel W
Energy Northwest
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML12184A054 (2)


Text

ENERGY NORTHWEST W. Grover Hettel Columbia Generating Station P.O. Box 968, PE23 Richland, WA 99352-0968 Ph. 509.377.8311 I F. 509.377.4150 whettel @ energy-northwest.com SAFEGUARDS INFORMATION 10 CFR 50.54(p)(2)

U. S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852

Subject:

COLUMBIA GENERATING STATION, DOCKET NO. 50-397 COLUMBIA GENERATING STATION PHYSICAL SECURITY PLAN, TRAINING AND QUALIFICATION PLAN, SAFEGUARDS CONTINGENCY PLAN, AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION PLAN, REVISION 16

Dear Sir or Madam:

Energy Northwest has revised the subject document, hereinafter referred to as the plan, and determined that the changes do not decrease the safeguards effectiveness of the plan. In accordance with 10 CFR 50.54(p)(2), a report containing a description of each change made in Revision 16 of the plan is provided in Enclosure 1. The revised plan is provided in Enclosure 2. contains security sensitive information as defined by 10 CFR 2.390(d) and should be withheld from public disclosure. Protect this information accordingly. contains safeguards information and should be protected in accordance with 10 CFR 73.21.

This letter contains no new regulatory commitments. If you have any questions or require additional information, please contact Mr. KR Gosney at (509) 377-1050.

NOTE:

ENCLOSURE 2 TO THIS LETTER CONTAINS "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF THE ENCLOSURE THIS TRANSMITTAL LETTER IS "DECONTROLLED."

SAFEGUARDS INFORMATION

(-S(:)Ic) I oOL

COLUMBIA GENERATING STATION PHYSICAL SECURITY PLAN, TRAINING AND QUALIFICATION PLAN, SAFEGUARDS CONTINGENCY PLAN, AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION PLAN, REVISION 16 Page 2 of 2 Respectfully, W. G. Hettel Vice President, Operations

Enclosures:

As stated cc:

NRC RIV NRC NRR Project Manager (w/o all)

NRC Senior Resident Inspector - 988C (w/o all)

AJ Rapacz - BPA - 1399 (w/o all)

WA Horin - Winston & Strawn (w/o all)