ML12181A199

From kanterella
Jump to navigation Jump to search
Submittal of NRC Form 536 Re Operator Licensing Examination Data
ML12181A199
Person / Time
Site: Callaway Ameren icon.png
Issue date: 06/20/2012
From: Cortez J
Ameren Missouri
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ULNRC 5878
Download: ML12181A199 (2)


Text

a Nh..I-Fý viAmeren MISSOURI Callaway Plant June 20, 2012 ULNRC 5878 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Ladies and Gentlemen:

OPERATOR LICENSING EXAMINATION DATA Enclosed is a NRC Form 536 for the Callaway Nuclear Plant, NRC Region IV.

If you need any additional information, please contact Mr. Juan J. Cortez 314 225-4642.

JJC/mrw Enclosure HDCý5 PO Box 620 Fulton, MO 65251 AmerenMissouri.com

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 09130/2014 (9-2011)

Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Information Services Branch OPERATOR LICENSING (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, orby intemet e-mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and EXAMIINATION DATA Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503.

If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Callaway Plant IV A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2014 CY 2016 CY 2017 CY ESTIMATED NUMBER OF LICENSEE-PREPARED 1

1 1

EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2014 CY 2016 CY 2017 CY NUMBER OF REACTOR 0

2 2

OPERATORS NUMBER OF SENIOR REACTOR 11 4

5 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR I

OPERATORS - UPGRADE 3

2 2

NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0

0 0

PROPOSED DATES PRIMARY DATE 09/01/2014 03/14/2016 09/04/2017 ALTERNATE DATE 09/08/2014 03/21/2016 09/11/2017 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2014 CY 2016 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 89 CANDIDATES NRC FORM 536 (9-2011)