June 28, 2012

Mr. Adam C. Heflin, Senior Vice

President and Chief Nuclear Officer

Union Electric Company

P.O. Box 620

Fulton, MO 65251

SUBJECT:

CALLAWAY PLANT - NOTIFICATION OF NRC INITIAL OPERATOR

LICENSING EXAMINATION 05000483/2013301

Dear Mr. Heflin:

In a telephone conversation on June 20, 2012, between Mr. Larry Wilhelm, Operating

Supervisor, and Mr. Brian Larson, Chief Examiner, arrangements were made for the

administration of licensing examinations at Callaway Plant during the week of March 18, 2013.

As agreed during the telephone conversation, your staff will prepare the examination based on

the guidelines in Revision 9, Supplement 1, of NUREG-1021, Operator Licensing Examination

Standards for Power Reactors, and the use of Revision 2 of NUREG-1122, Knowledge and

Abilities Catalog for Nuclear Power Plant Operators. The NRCs regional office will discuss

with your staff any changes that might be necessary before the examinations are administered.

To meet the above schedule, it will be necessary for your staff to furnish the examination

outlines by December 31 2012. The examination and supporting reference materials identified

in Attachment 3 to ES-201 will be due by January 28, 2013. Pursuant to Title 10, Section

55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized

representative of the facility licensee shall approve the outline and examination before they are

submitted to the NRC for review and approval. All materials shall be complete and ready-to-

use. We request that any personal, proprietary, sensitive unclassified, or safeguards

information in your response be contained in a separate enclosure and appropriately marked.

Any delay in receiving the required examination and reference materials, or the submittal of

inadequate or incomplete materials, may cause the examinations to be rescheduled. In

addition, your support for on-site validation of the examination is required during the week of

February 11, 2013.

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.

UNITED STATES

NUCLEAR REGULATORY COMMISSION

RE GIO N I V

1600 EAST LAMAR BLVD

ARLINGTON, TEXAS 76011-4511

Mr. Heflin

- 2 -

Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examination is being administered.

To permit timely NRC review and evaluation, your staff should submit the preliminary senior

operator license applications (Office of Management and Budget (OMB) approval number 3150-

0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if

any)(OMB approval number 3150-0090) at least 30 days before the first examination date. If

the applications are not received at least 30 days before the examination date, a postponement

may be necessary. Signed applications certifying that all training has been completed should

be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under

approval number 3150-0018, which expires on February 28, 2013. The public reporting burden

for this collection of information is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the

time for reviewing instructions, gathering and maintaining the data needed, and completing and

reviewing the collection of information. Send comments regarding this burden estimate or any

other aspect of these information collections, including suggestions for reducing the burden, to

the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory

Commission, Washington, DC 20555-0001, or by Internet electronic mail to

INFOCOLLECTS@NRC.GOV.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an

information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be

available electronically for public inspection in the NRCs Public Document Room or from the

Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access

and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room

page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.

Thank you for your cooperation in this matter. Mr. Wilhelm has been advised of the policies and

guidelines referenced in this letter. If you have any questions regarding the NRCs examination

procedures and guidelines, please contact Mr. Larson at 817-200-1172, or myself at 817-200-

1159.

Sincerely,

/RA/

Mark S. Haire, Chief

Operations Branch

Division of Reactor Safety

Docket: 50-483

License: NPF-30

Electronic Distribution for Callaway Plant

ML12180A390

SUNSI Rev Compl.

Yes No

ADAMS

Yes No

Reviewer Initials

BTL

Publicly Avail

Yes No

Sensitive

Yes No

Sens. Type Initials

BTL

SOE:OB

C:OB

BLarson

MHaire

/RA/

/RA/

06/27/2012

06/27/2012