MONTHYEARML24285A1682024-10-11011 October 2024 Email Response: LTR-24-0212 David Lochbaum Letter - Public Access to Advisory Committee on Reactor Safeguards Materials - Seabrook ASR ML24149A3532024-05-24024 May 2024 Change in Estimated Review Schedule for Nextera Common Emergency Plan Amendment ML24122C6922024-05-0101 May 2024 NextEra Fleet EP Amendment - Demonstration Drill ML24115A2362024-03-28028 March 2024 Acceptance Review: Alternative to the Requirements of the ASME Code for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld ML23173A1522023-06-22022 June 2023 Request for Additional Information NextEra Fleet Emergency Plan Amendment Request ML23156A3042023-05-31031 May 2023 Acceptance of Requested Licensing Action Amendment Request to Remove Period of Applicability from Pressure Temperature Limits and Low Temperature Over Pressure Protection Curves ML23109A1862023-04-19019 April 2023 and Turkey Point Acceptance of Requested Licensing Action Proposed Alternative to Asme Section XI Authorizing Implementation of Asme Code Case N-752-1 ML23066A1892023-03-0303 March 2023 OEDO-22-00419: Email Dated 3-3-2023 to Petitioner on Seabrook ASR Petition ML23066A0892023-02-24024 February 2023 OEDO-22-00419 - Email Dated 02/24/2023 to Petitioner on Seabrook Unit 1 ASR Petition ML23020A9392023-01-19019 January 2023 Acceptance of Requested Licensing Action Amendment Request to Revise Cooling Tower Service Water Loop or Cell Requirements (EPID L-2022-LLA-0183) (Email) ML23011A3082023-01-11011 January 2023 Request for Additional Information Regarding Relief Request 4RA-22-001 (L-2022-LLR-0074) ML22341A0012022-12-0606 December 2022 Acceptance of Requested Licensing Action Relief Request 4RA-22-001, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2) ML22333A7452022-11-22022 November 2022 OEDO-22-00419 - Email: C-10 Response on PRB Initial Assessment - C-10 Petition on Seabrook ASR Concrete Degradation ML22287A1472022-10-13013 October 2022 2.026 Petition Screen-in Email ML22228A0552022-08-15015 August 2022 Request for Additional Information Steam Generator Tube Inspection Report Review ML22200A1082022-07-19019 July 2022 Acceptance Review for TSTF-577 Amendment ML24285A2022022-07-0202 July 2022 Email Response - LTR-24-0212 - Patricia Skibbee - President C-10 Board of Directors - David Lochbaum ML22153A4152022-05-31031 May 2022 Request for Additional Information Re 120V Inverter LAR from TS Branch - Final ML22116A2442022-04-26026 April 2022 Acceptance of Requested Licensing Action Relief Request 3IR-18 and 3IR-19 for End of Third 10-Year ISI Interval for Examinations with Limited Coverage ML22048B5522022-02-17017 February 2022 LTR-22-0010 Reply to Geoff Gilbert Email Concern About Seabrook Station Concrete Degradation ML22062B6642022-02-0707 February 2022 Request for Additional Information 120V Inverter LAR from the Electrical Branch ML22063A0002022-01-25025 January 2022 Requests for Additional Information from Risk Branch Regarding 120V Inverter LAR ML22020A2542022-01-20020 January 2022 LTR-22-0010 Geoff Gilbert, E-mail Concern About Seabrook Station Concrete Degradation ML21097A2512021-04-0707 April 2021 Request for Additional Information Regarding Steam Generator Tube Inspection Report Review for RFO 20 (EPID L-2020-LRO-0066) (Email) ML21054A0482021-02-23023 February 2021 Request for Additional Information Regarding Heat Flux Hot Channel Requirement Amendment Request ML20343A0942020-12-0303 December 2020 Request for Additional Information Regarding Seabrook (COVID-19) Part 73 Force-on-Force Exemption Request (L-2020-LLE-0219) ML20273A2812020-09-22022 September 2020 Acceptance of Requested Licensing Action License Amendment Request to Resolve Non-Conservative Heat Flux Hot Channel Factor Requiments ML20258A1502020-09-14014 September 2020 Request for Additional Information Related to Seabrook License Amendment Request Regarding One-Time Change to the AC Sources Operating TS ML20260H4932020-09-11011 September 2020 NRR E-mail Capture - Comanche Peak - Acceptance of Requested Licensing Action - Request to Use Later Code Edition of ASME OM Code ML20230A2962020-08-14014 August 2020 Acceptance of Requested Licensing Action License Amendment Request to Allow a One-Time Change to the AC Sources Operating TS ML20167A1842020-06-11011 June 2020 Request for Additional Information Related to Seabrook License Amendment Request Regarding TSTF-411 and TSTF-418 (L-2019-LLA-0237) ML20124A0012020-05-0101 May 2020 Cancellation of Call with Seabrook on Steam Generator Tube Inspections ML20114E1592020-04-23023 April 2020 Email and Request for Additional Information Related to Seabrook License Amendment Request to Degraded Voltage Time Delay Setpoint (L-2020-LLA-0012) ML20101L0402020-04-10010 April 2020 Acceptance of Requested Licensing Action Relief Request to Use Code Case OMN-13 with 2012 Edition of the OM Code ML20101N0932020-04-10010 April 2020 Acceptance of Requested Licensing Action Re Relief Request to Defer ASME Inspections Due COVID-19 (EPIDs L-2020-LLR-0055, -56, and -57) ML20101H3912020-04-0808 April 2020 Verbal Authorization for Seabrook Relief Request 3IIR-7 ML20087K8262020-03-27027 March 2020 Upcoming Steam Generator Tube Inservice Inspection ML20063J9792020-02-28028 February 2020 Acceptance of Requested Licensing Action Amendment Request to Revise Degraded Voltage Time Delay Setpoint ML19347C6732019-12-13013 December 2019 Acceptance of Requested Licensing Action Amendment Request to Adopt TSTF-418 ML19296D9122019-10-23023 October 2019 NRR E-mail Capture - Request for Additional Information Related to Seabrook Inverter Amendment (L-2019-LLA-0216) ML19295F5422019-10-15015 October 2019 NRR E-mail Capture - Seabrook Station, Unit No. 1 - Acceptance of Requested Licensing Action Amendment Request to Revise Onsite Power Distribution Requirements ML19275G7832019-10-0101 October 2019 Limited Appearance Statement from New Hampshire State Representative, Robert Harb Regarding the Seabrook Station Unit 1 License Amendment Application ML19270E6512019-09-27027 September 2019 Limited Appearance Statement from Joanna Hammond Regarding the Seabrook Station Unit 1 License Amendment Application ML19270E6542019-09-26026 September 2019 Limited Appearance Statement from Brian Campbell Regarding the Seabrook Station Unit 1 License Amendment Application ML19196A3592019-07-15015 July 2019 NRR E-mail Capture - Seabrook Station, Unit No. 1 - Acceptance of Requested Licensing Action Amendment Request to Revise the Emergency Core Cooling System Accumulator Technical Specifications ML19169A2412019-06-13013 June 2019 NRR E-mail Capture - Seabrook Station, Unit No. 1 - Acceptance of Requested Licensing Action Relief Requests for the Containment Building Spray Pump Flow and Vibration Testing (Epids L-2019-LLR-00 and L-2019-LLR-00) ML19162A0662019-06-0404 June 2019 Reply to Mr. Rick Jakious'S E-mail of 5-29-2019 to Stephen B. Comley Sr., We the People with Attachments ML19112A1782019-04-22022 April 2019 NRR E-mail Capture - Point Beach; Seabrook; Turkey Point - Acceptance of Requested Licensing Action Amendment Request to Revise Technical Specifications to Adopt TSTF-563 ML19101A4042019-04-11011 April 2019 NRR E-mail Capture - Point Beach; Seabrook; St. Lucie; Turkey Point - Acceptance of Licensing Action Relief Request to Use Encoded Phased Array Ultrasonic Examination Techniques for Ferritic and Austenitic Welds ML19070A2382019-03-10010 March 2019 LTR-19-0088 Maura Healey, Attorney General, the Commonwealth of Massachusetts, Ltr NextEras Requests for a License Amendment and Twenty-year Extension Prior to Issuance of a Final Decision in Adjudicatory Hearing on Concrete Degradation at 2024-05-24
[Table view] |
Text
Turilin, Andrey From: Thomas, George Sent: Friday, October 21, 2011 9:28 AM To: Raymond, William Cc: Burritt, Arthur, Conte, Richard; Modes, Michael
Subject:
RE: Followon Information Request for TIA Reg Seabrook ASR Attachments: Information Request ASR 10-14-11 .docx Bill, The attached has the information that I ne . The questions are straight forward and self-explanatory, and the much of it is request for documents. It will be great if you could help.
Thanks.
George
--- Original Message -----
From: Modes, Michael Sent: Thursday, October 20, 2011 7:38 PM To: Conte, Richard; Raymond, William Cc: Burritt, Arthur; Thomas, George
Subject:
RE: Followon Information Request for TIA Reg Seabrook ASR A status call with Seabrook would be beneficial, George can work through the questions with Seabrook ifVicki can pull together her experts.
From: Conte, Richard Sent: Thursday, October 20, 2011 5:16 PM To: Raymond, William; Modes, Michael Cc: Burritt, Arthur; Thomas, George
Subject:
RE: Followon Information Request for TIA Reg Seabrook ASR If we are going to give these questions verbally then George Thomas should do it. The last time we went through this they had questions on his questions.
Sounds like another status call that we seemed to thing we would never need again.
From: Raymond, William Sent: Thursday, October 20, 2011 3:37 PM To: Modes, Michael Cc: Conte, Richard
Subject:
RE: Followon Information Request for TIA Reg Seabrook ASR Mike, What does George need?
Can I help?
Bill From: Modes, Michael Sent: Thursday, October 20, 2011 3:36 PM To: Conte, Richard Cc: Thomas, George; Chaudhary, Suresh; Burritt, Arthur; Raymond, William
Subject:
RE: Followon Information Request for TIA Reg Seabrook ASR Information in this record was deleted in accordance with the Freedom of Information 1 Act, exemptions 5- '
fow
Although MD 620 says: "Inspectors and SRAs should be aware that written notes or e-mails provided to a member of the licensee's, vendor's, or applicant's staff or received by NRC staff in the transaction of Government business may need to be preserved as records in the working file to either be ultimately retained in ADAMS or disposed of in accordance with Section 04.04a, "Record Retention and Disposition."
It also says: "Some licensees, vendors, or applicants supply forms for inspectors to use during inspections, for written questions or to request information and documents that are needed to continue the inspection.
Inspectors shall only use licensee, vendor, or applicant-generated forms to request records and documents. All other information (e.g., questions) should be requested verbally. Some licensees, vendors, or applicants may document and track an inspector's questions and then generate written interim and final answers to these questions. These written licensee, vendor, or applicant generated responses can be reviewed by the inspector during the on-site inspection."
(b)(5)
(b)(5)
Ify-busimply read the questions to the licensee, and have them respond to George verbally or by posting documents to Certrec you keelp well within the guidelines and make the report far less complicated.
From: Conte, Richard Sent: Thursday, October 20, 2011 3:11 PM To: Modes, Michael; Raymond, William Cc: Thomas, George; Chaudhary, Suresh; Burritt, Arthur
Subject:
RE: Followon Information Request for TIA Reg Seabrook ASR Let me check our approach on this. If I send the requested information directly to NextEra we will need to document it in ADAMS or the current open report (we- can do it by put the report and the attachment in an ADAMs package.
Any misunderstandings in this regard.
From: Modes, Michael Sent: Friday, October 14, 2011 4:05 PM To: Raymond, William Cc: Conte, Richard; Thomas, George; Chaudhary, Suresh; Burritt, Arthur
Subject:
FW: Followon Information Request for TIA Reg Seabrook ASR Because the inspection is open pending our review of their revised operability determination and in keeping with Manual Chapter 0620, "Inspection Documents and Records", someone has to contact the licensee and request the information verbally. Vicki Brown would seem to be the appropriate point-of-contact.
I am at VY (IP71003) next week, OC (IP71152A) the following week, and Salem (IP71 11 108P) for two weeks following that. Is this something you can take a few minutes to read to Vicki?
Thanks Michael.
2
From: Thomas, George Sent: Friday, October 14, 2011 1:58 PM To: Modes, Michael Cc: Murphy, Martin; Conte, Richard
Subject:
Followon Information Request for TIA Reg Seabrook ASR
- Michael, As a follow-on from the inspection during the week of 9/26, please have the Seabrook licensee provide the information requested in the attached.
George Thomas NRRIDE/EMCB 301-415-6181 3
- l *,t.° Information Request for TIA related to Seabrook ASR Degradation of Control Building "B" Electrical Tunnel Concrete
- 1. Please provide the following documents referenced in EDS 36180, Revision 01, "Structural Monitoring Program":
a) EC 145305 b) AR 574120574120c) AR 581434581434d) EC 250348 e) AR 587429587429f) AR 587432587432: 2. Please provide values of cracking index (in mmim) from the crack measurements made thus far on the ASR affected Electrical B-Tunnel. Also provide values of damage rating index determined from petrographic examination of core samples from the tunnel thus far.
- 3. The NRC staff understands that the licensee has been taking and testing core samples from the interior of the ASR-affected structures. Please explain how Seabrook plans to assess the degradation effects on the exterior of the affected structures in contact with the soil and ground water, which may likely be more severe ifthe source of moisture is water infiltration from the outside?
- 4. Is Seabrook planning to also measure values of Poisson's ratio of ASR-affected concrete from core samples to enable characterization of the affected concrete using a complete set of measured mechanical properties (namely, elastic modulus, poisson ratio, compressive strength and tensile strength) typically used in analysis and design of concrete structures. Please explain if not.