Lr - Draft Request for Additional Information Limerick Generating Station LRA
ML12173A131
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 06/20/2012
From:
Office of Nuclear Reactor Regulation
To:
Division of License Renewal
References
Download: ML12173A131 (4)


Text

1 LimerickNPEm Resource From:

Kuntz, Robert Sent:

Wednesday, June 20, 2012 10:54 AM To:

'Christopher.Wilson2@exeloncorp.com' Cc:

Anthony Z. Roisman; gfettus@nrdc.org; Smith, Maxwell; LimerickHearingFile Resource

Subject:

RE: DRAFT Request for Additional Information RE: Limerick Generating Station LRA Attachments:

DRAFT RAI RE LGS LRA OCCW followup.docx

Chris, Attached is a DRAFT Request for Information related to the license renewal application for Limerick Generating Station. If Exelon would like clarification on the attached let me know and I will set up a teleconference.

Robert Kuntz Sr. Project Manager NRR/ADRO/DLR/RPB1 (301) 415-3733 robert.kuntz@nrc.gov

Hearing Identifier:

Limerick_LR_NonPublic Email Number:

1213 Mail Envelope Properties (94A2A4408AC65F42AC084527534CF41698E07F3A9E)

Subject:

RE: DRAFT Request for Additional Information RE: Limerick Generating Station LRA Sent Date:

6/20/2012 10:53:41 AM Received Date:

6/20/2012 10:53:57 AM From:

Kuntz, Robert Created By:

Robert.Kuntz@nrc.gov Recipients:

"Anthony Z. Roisman" <aroisman@nationallegalscholars.com>

Tracking Status: None "gfettus@nrdc.org" <gfettus@nrdc.org>

Tracking Status: None "Smith, Maxwell" <Maxwell.Smith@nrc.gov>

Tracking Status: None "LimerickHearingFile Resource" <LimerickHearingFile.Resource@nrc.gov>

Tracking Status: None

"'Christopher.Wilson2@exeloncorp.com'" <Christopher.Wilson2@exeloncorp.com>

Tracking Status: None Post Office:

HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 348 6/20/2012 10:53:57 AM DRAFT RAI RE LGS LRA OCCW followup.docx 29129 Options Priority:

Standard Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date:

Recipients Received:

LIMERICK GENERATING STATION LICENSE RENEWAL APPLICATION DRAFT REQUESTS FOR ADDITIONAL INFORMATION DRAI B.2.1.12-3

=

Background===

Commitment No. 12 and LRA Section A.2.1.12 were revised as a result of the responses to RAI B.2.1.12-1 and RAI B.2.1.12-2. The revision includes a commitment to, [p]erform periodic inspections for loss of material in the Nonsafety-Related Service Water System at a minimum of five locations on each unit once every refueling cycle. The response to RAI B.2.1.12-1 also provided the basis for why the opportunistic inspections of buried service water piping would be sufficient to provide adequate managing of the aging of the internal surfaces of the piping.

Issue The staff agrees that (a) the opportunistic inspection of the buried piping was clarified to at least occur during the replacement of the residual heat removal service water (RHRSW) piping in the pipe tunnel between 2012 and 2015, (b) the detailed inspections of the piping removed during the replacement will provide supplemental information to assess the condition of the buried piping, and (c) degradation of the piping in aboveground portions of the system will be consistent with the buried piping given similar operating conditions. However, given the timing of the only certain inspection of the buried service water piping, the staff does not agree that there is a sufficient basis to establish a reasonable assurance that the buried service water piping will perform its current licensing basis function(s) throughout the period of extended operation. Nevertheless, the staff believes that the five inspections per unit per refueling outage interval in the nonsafety-related portions of the service water system, given similar operating conditions, would provide sufficient timely data to understand the condition of the internal surfaces of the buried piping.

The Updated Final Safety Analysis Report (UFSAR) supplement, as amended, does not provide a link between the inspections of the nonsafety-related portions of the service water system and the conditions of the buried piping. Lacking this link, the staff does not believe that the UFSAR supplement provides a sufficient summary description of the activities for managing the aging of the buried service water piping as required by 10 CFR 54.21(d).

Request (a) Revise LRA Section A.2.1.12 to establish that the nonsafety-related piping inspections are necessary to provide a sufficient understanding of the buried service water piping conditions throughout the period of extended operation.

(b) State how inspection locations will be selected to ensure that conditions are similar between the nonsafety-related piping inspections and buried service water piping (e.g.,

flow, temperature) such as they impact MIC.

Alternatively,

(c) Revise Commitment No. 12 and LRA Section A.2.1.12 to conduct internal visual and/or volumetric inspections of other portions of the service water system that would be sufficient to provide timely data to understand the condition of the internal surfaces of the buried piping throughout the period of extended operation.