Letter Sequence Other |
---|
|
|
MONTHYEARML11256A0512011-09-0909 September 2011 Application for Consent to Proposed License Transfers: Request for Threshold Determination Project stage: Request ML1201000752012-02-14014 February 2012 Partial Acceptance of Requested Licensing Action Application for Consent to Proposed License Transfers; Request for Threshold Determination Project stage: Acceptance Review ML1201005082012-02-15015 February 2012 Notice of Consideration of Approval of Application Regarding Proposed Acquisition and Opportunity for a Hearing Project stage: Request ML1201004982012-02-15015 February 2012 Notice of Consideration of Approval of Application Regarding Proposed Acquisition and Opportunity for a Hearing - Millstone Power Station, Unit No. 3 Project stage: Other ML1206602302012-03-30030 March 2012 Request for Additional Information Regarding Proposed License Transfers; Request for Threshold Determination Project stage: RAI ML12100A0172012-04-0606 April 2012 Connecticut Yankee, and Yankee Atomic, Response to Nrc'S Request for Additional Information Regarding Proposed License License Transfers Request for Threshold Determination Project stage: Request ML1213004722012-06-15015 June 2012 Order Approving Application Regarding Merger of Central Vermont Public Service Corporation and Gaz Metro Limited Partnership and Resultant Indirect Transfer of License Project stage: Other ML12165A5082012-06-15015 June 2012 MS3-Threshold Attachment Project stage: Other ML12205A0302012-07-19019 July 2012 Central Vermont Public Service Corporation, Supplemental Information Project stage: Supplement ML12207A1242012-07-23023 July 2012 Conforming License Amendment Request Project stage: Request 2012-03-30
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000336/20240032024-11-0707 November 2024 Integrated Inspection Report 05000336/2024003 and 05000423/2024003 and Apparent Violation and Independent Spent Fuel Storage Installation Inspection Report 07200008/2024001 ML24289A0152024-10-21021 October 2024 Review of the Fall 2023 Steam Generator Tube Inspection Report 05000423/LER-2024-001, Loss of Safety Function and Condition Prohibited by Technical Specifications for Loss of Secondary Containment Boundary2024-10-14014 October 2024 Loss of Safety Function and Condition Prohibited by Technical Specifications for Loss of Secondary Containment Boundary IR 05000336/20244022024-10-0808 October 2024 Security Baseline Inspection Report 05000336/2024402 and 05000423/2024402 (Cover Letter Only) ML24281A1102024-10-0707 October 2024 Requalification Program Inspection 05000423/LER-2023-006-02, Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications2024-09-26026 September 2024 Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24260A1952024-09-16016 September 2024 Response to Request for Additional Information Regarding Proposed Amendment to Support Implementation of Framatome Gaia Fuel ML24260A2192024-09-16016 September 2024 Decommissioning Trust Fund Disbursement - Revision to Previous Thirty-Day Written Notification ML24248A2272024-09-0404 September 2024 Operator Licensing Examination Approval ML24240A1532024-09-0303 September 2024 Summary of Regulatory Audit Supporting the Review of License Amendment Request for Implementation of Framatome Gaia Fuel IR 05000336/20240052024-08-29029 August 2024 Updated Inspection Plan for Millstone Power Station, Units 2 and 3 (Reports 05000336/2024005 and 05000423/2024005 IR 05000213/20240012024-08-27027 August 2024 Connecticut Yankee Atomic Power Company - Independent Spent Fuel Storage Installation NRC Inspection Report Nos. 07200039/2024001 and 05000213/2024001 IR 05000336/20240022024-08-13013 August 2024 Integrated Inspection Report 05000336/2024002 and 05000423/2024002 ML24221A2872024-08-0808 August 2024 Independent Spent Fuel Storage Installation (ISFSI) - Submittal of Cask Registration for Spent Fuel Storage IR 05000336/20244412024-08-0606 August 2024 Supplemental Inspection Report 05000336/2024441 and 05000423/2024441 and Follow-Up Assessment Letter (Cover Letter Only) ML24212A0742024-08-0505 August 2024 Request for Withholding Information from Public Disclosure - Millstone Power Station, Unit No. 3, Proposed Alternative Request IR-4-13 to Support Steam Generator Channel Head Drain Modification ML24211A1712024-07-25025 July 2024 Associated Independent Spent Fuels Storage Installation, Revision to Emergency Plan - Report of Change IR 05000336/20244032024-07-22022 July 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000336/2024403 and 05000423/2024403 IR 05000336/20245012024-07-0101 July 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000336/2024501 and 05000423/2024501 ML24180A0932024-06-28028 June 2024 Readiness for Additional Inspection: EA-23-144 IR 05000336/20240102024-06-26026 June 2024 Biennial Problem Identification and Resolution Inspection Report 05000336/2024010 and 05000423/2024010 IR 05000309/20240012024-06-26026 June 2024 Company – Independent Spent Fuel Storage Installation NRC Inspection Reports 07200030/2024001 And05000309/2024001 ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 IR 05000336/20244402024-06-24024 June 2024 Final Significance Determination for Security-Related Greater than Green Finding(S) with Assessment Follow-up; IR 05000336/2024440 and 05000423/2024440 and Notice of Violation(S), NRC Investigation Rpt 1-2024-001 (Cvr Ltr Only) ML24176A1782024-06-20020 June 2024 Update to the Final Safety Analysis Report ML24176A2622024-06-20020 June 2024 Update to the Final Safety Analysis Report, Revision 37 ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24281A2072024-06-20020 June 2024 Update to the Final Safety Analysis Report, Revision 37 (Redacted Version) ML24280A0012024-06-20020 June 2024 Update to the Final Safety Analysis Report (Redacted Version) 05000336/LER-2024-001, Control Room Air Conditioning Unit Inoperable Due to Refrigerant Overcharge Resulting in a Condition Prohibited by Technical Specifications2024-06-10010 June 2024 Control Room Air Conditioning Unit Inoperable Due to Refrigerant Overcharge Resulting in a Condition Prohibited by Technical Specifications ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code ML24165A1292024-06-0505 June 2024 ISFSI, 10 CFR 50.59 Annual Change Report for 2023 Annual Regulatory Commitment Change Report for 2023 ML24128A2772024-06-0404 June 2024 Issuance of Amendment No. 290 to Revise TSs for Reactor Core Safety Limits, Fuel Assemblies, and Core Operating Limits Report for Use of Framatome Gaia Fuel (EPID L-2023-LLA-0074) (Non-Proprietary) ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24094A0742024-05-30030 May 2024 Issuance of Exemption for Connecticut Yankee Atomic Power Company Regarding Haddam Neck Plant Independent Spent Fuel Storage Installation ML24109A0032024-05-21021 May 2024 Issuance of Amendment No. 289 to Revise Technical Specifications to Use Framatome Loss of Coolant Accident Evaluation Methodologies for Establishing Core Operating Limit (EPID L-2023-LLA-0065) (Non-Proprietary) ML24110A0562024-05-21021 May 2024 Exemption from the Requirements of 10 CFR Part 50, Section 50.46, and Appendix K Regarding Use of M5 Cladding Material (EPID L-2023-LLE-0013) (Letter) 05000423/LER-2023-006-01, Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications2024-05-20020 May 2024 Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications ML24141A2432024-05-20020 May 2024 Response to Request for Additional Information Regarding Alloy 600 Aging Management Program Submittal Related to License Renewal Commitment No. 15 ML24142A0952024-05-20020 May 2024 End of Cycle 22 Steam Generator Tube Inspection Report IR 05000336/20240012024-05-14014 May 2024 Integrated Inspection Report 05000336/2024001 and 05000423/2024001 and Apparent Violation 05000423/LER-2023-006, Pressurizer Power Operated Relief Valve Failed to Stroke Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications2024-05-0202 May 2024 Pressurizer Power Operated Relief Valve Failed to Stroke Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications ML24123A2042024-05-0202 May 2024 Pre-Decisional Replay to EA-23-144 IR 05000336/20244012024-04-30030 April 2024 Security Baseline Inspection Report 05000336/2024401 and 05000423/2024401 (Cover Letter Only) ML24123A1222024-04-30030 April 2024 Inservice Inspection Program - Owners Activity Report, Refueling Outage 22 ML24124A1372024-04-30030 April 2024 Independent Spent Fuel Storage Installation - 2023 Individual Monitoring NRC Form 5 Report ML24116A0452024-04-25025 April 2024 Special Inspection Follow-Up Report 05000336/2024440 and 05000423/2024440 and Preliminary Finding(S) of Greater than Very Low Significance and NRC Investigation Report No. 1-2024-001 (Cover Letter Only) ML24114A2662024-04-24024 April 2024 Submittal of 2023 Annual Radioactive Effluent Release Report ML24116A1742024-04-24024 April 2024 Annual Radiological Environmental Operating Report 2024-09-04
[Table view] Category:Safety Evaluation
MONTHYEARML24128A2772024-06-0404 June 2024 Issuance of Amendment No. 290 to Revise TSs for Reactor Core Safety Limits, Fuel Assemblies, and Core Operating Limits Report for Use of Framatome Gaia Fuel (EPID L-2023-LLA-0074) (Non-Proprietary) ML24109A0032024-05-21021 May 2024 Issuance of Amendment No. 289 to Revise Technical Specifications to Use Framatome Loss of Coolant Accident Evaluation Methodologies for Establishing Core Operating Limit (EPID L-2023-LLA-0065) (Non-Proprietary) ML23341A0172024-01-12012 January 2024 Issuance of Amendment No. 288 Revision to Applicability Term for Reactor Coolant System Heatup and Cooldown Pressure-Temperature Limitations Figures ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23230A0502023-10-0202 October 2023 5 of the Quality Assurance Topical Report - Review of Program Changes ML23226A0052023-09-26026 September 2023 Issuance of Amendment No. 287 Supplement to Spent Fuel Pool Criticality Safety Analysis ML23188A0432023-07-31031 July 2023 Authorization and Safety Evaluation for Alternative Request No. IR-04-11 ML23175A0052023-07-12012 July 2023 Alternative Request P-07 for Pump Periodic Verification Testing Program for Containment Recirculation Spray System Pumps ML23072A0892023-05-0101 May 2023 (Amendments 346 & 286), North Anna 1 & 2 (Amnds 294 & 277), Surry 1 & 2 (Amnds 311 & 311), and Summer 1 (Amd 225) - Issuance of Amendments to Revise TSs to Adopt TSTF-554 Revise Reactor Coolant Leakage Requirements ML23058A4542023-03-16016 March 2023 Issuance of Amendment Nos. 345 and 285 Regarding Adoption of Technical Specification Task Force-359, Increase Flexibility in Mode Restraints ML21320A0072022-09-0707 September 2022 Review of Appendix E to DOM-NAF-2, Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code (EPID L-2021-LLT-0000) (Non-Proprietary) ML22201A5082022-07-28028 July 2022 Authorization and Safety Evaluation for Alternative Request No. IR-04-09 ML22095A1072022-07-11011 July 2022 Issuance of Amendment Nos. 120, 344, & 284, 293 & 276, & 307 & 307 to Relocate Requirements to the QAPD ML22039A3392022-03-0303 March 2022 Request for Alternative Frequency to Supplemental Valve Position Verification Testing Requirements in the Fourth 10-year Valve Inservice Testing Program ML22041A0102022-03-0101 March 2022 V.C. Summer 1, Issuance of Amendment Nos. 283 (Millstone), 291 and 274 (North Anna), and 221 (Summer) to Revise TSs to Adopt TSTF-569 Revision of Response Time Testing Definition ML22007A1512022-02-16016 February 2022 Issuance of Amendment No. 282 Regarding Shutdown Bank Technical Specification Requirements and Alternate Control Rod Position Monitoring Requirements ML21326A0992022-01-0707 January 2022 Issuance of Amendment No. 281 Regarding Revised Reactor Core Safety Limit to Reflect Topical Report WCAP-177642-P-A, Revision 1 ML21262A0012021-11-0909 November 2021 Issuance of Amendment No. 280 Regarding Measurement Uncertainty Recapture Power Uprate ML21284A0062021-10-29029 October 2021 Authorization and Safety Evaluation for Alternative Request No. RR-05-04 and IR-4-02 ML21227A0002021-10-0505 October 2021 Issuance of Amendment No. 279 Regarding Addition of Analytical Methodology to the Core Operating Limits Report for a Large Break Loss-of-Coolant Accident ML21222A2302021-09-0909 September 2021 Issuance of Amendment No. 343 Revision to Technical Specifications for Steam Generator Inspection Frequency (L-2020-LLA-0227) ML21174A0202021-08-0202 August 2021 Relief Request for Limited Coverage Examinations Performed in the Fourth 10-Year Inservice Inspection Interval ML21167A3552021-07-16016 July 2021 Authorization and Safety Evaluation for Alternative Request No. RR-05-06 ML21167A2112021-06-30030 June 2021 Relief Request for Limited Coverage Examinations Performed in the Third 10-Year Inservice Inspection Interval (EPID L-2020-LLR-0081 Through L-2020-LLR-0088) ML21075A0452021-03-26026 March 2021 Request to Utilize Code Case N-885 ML21043A1622021-03-25025 March 2021 Issuance of Amendment No. 278 Regarding Revision to Battery Surveillance Requirements ML21026A1422021-02-23023 February 2021 Issuance of Amendment No. 342 Revision to Technical Specification Table 3.3-11, Accident Monitoring Instrumentation ML20312A0022020-12-10010 December 2020 Relief Request for Limited Coverage Examinations Performed in the Third 10-Year Inservice Inspection Interval (EPID L-2020-LLR-0027 Through L-2020-LLR-0032) ML20312A0012020-12-10010 December 2020 Relief Requests for Limited Coverage Examinations Performed in the Fourth 10-Year Inservice Inspection Interval ML20287A4712020-10-20020 October 2020 Proposed Alternative RR-05-05 to the Requirements of the ASME Code Containment Unbonded Post-Tensioning System Inservice Inspection Requirements ML20275A0002020-10-14014 October 2020 Issuance of Amendment No. 277 to Revise Technical Specification 6.8.4.g to Allow a One-Time Deferral of the Steam Generator Inspections ML20237H9952020-09-29029 September 2020 Issuance of Amendment No. 341 Revision to Technical Specification 6.25, Pre-Stressed Concrete Containment Tendon Surveillance Program ML20252A0072020-09-15015 September 2020 Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI ML20191A0042020-08-0707 August 2020 Issuance of Amendment No. 340 Revised Technical Specification Limits for Primary and Secondary Coolant Activity ML20189A2062020-07-16016 July 2020 Relief Request IR-4-03 Concerning Non-Code Methodology to Demonstrate Structural Integrity of Class 3 Moderate-Energy Piping ML20161A0002020-07-15015 July 2020 Issuance of Amendment No. 276 Regarding Revision to the Integrated Leak Rate Type a and Type C Test Intervals ML20140A3692020-06-24024 June 2020 Issuance of Amendment No. 339 Extension of Technical Specification 3.8.1.1, A.C. Sources - Operating, Allowed Outage Time ML20080K5082020-03-24024 March 2020 Alternative Request RR-05-03 for the Fifth 10-Year Inservice Inspection Interval ML19340A0252020-01-30030 January 2020 Issuance of Amendment No. 337 Regarding Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structure, Systems, and Components of Nuclear Power Reactors ML19305D2482019-12-31031 December 2019 Issuance of Amendments Adoption of Emergency Action Level Schemes Per NEI 99-01, Rev. 6 ML19340A0012019-12-18018 December 2019 Proposed Alternative Request IR-4-01 Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography ML19338G3722019-12-18018 December 2019 Alternative Requests RR-05-01 and RR-05-02 for the Fifth 10-Year Inservice Inspection Interval ML19340A0002019-12-13013 December 2019 Relief Request IR-3-39, Proposed Alternative to ASME Code Weld Preheat Requirements ML19126A0002019-05-28028 May 2019 Issuance of Amendment No. 273 Regarding Technical Specification Changes for Spent Fuel Storage and New Fuel Storage ML19098A0342019-04-30030 April 2019 Units 1 and 2; Limerick, Units 1 and 2; Peach Bottom, Units 2 and 3, and Quad Cities, Units 1 and 2 - Revision to Approved Alternative to Use BWR Vessel and Internal Proj Guidelins ML19042A2772019-03-21021 March 2019 Issuance of Amendment No. 272 Regarding Revision to Technical Specification Action Statement for Loss of Control Building Inlet Ventilation Radiation Monitor Instrumentation Channels ML18290A6022018-11-13013 November 2018 Alternative Requests Related to the Fifth and Fourth 10-Year Interval Pump, Valve, and Snubber Inservice Testing Programs, Respectively (EPID L-2018-LLR- 0012 Through EPID L-2018-LLR-0022) ML18275A0122018-10-0404 October 2018 Alternative Request P-06 for the 'C' Charging Pump Test Frequency ML18246A0072018-09-25025 September 2018 Issuance of Amendment No. 335 Regarding Revision to the Integrated Leak Rate Type a and Type C Test Intervals ML18252A0032018-09-17017 September 2018 Alternative Requests RR-04-27 and IR-3-38 for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography 2024-06-04
[Table view] |
Text
June 15, 2012 Mr. Dale A. Rocheleau Senior Vice President, General Counsel
& Corporate Secretary Central Vermont Public Service Corporation 77 Grove St.
Rutland, VT 05701
SUBJECT:
REQUEST FOR THRESHOLD DETERMINATION UNDER 10 CFR 50.80 -
THE PROPOSED MERGER BETWEEN CVPS AND GAZ MÉTRO INVOLVING MINORITY COMMON STOCK OWNERSHIP IN MAINE YANKEE ATOMIC COMPANY, CONNECTICUT YANKEE ATOMIC COMPANY, AND YANKEE ATOMIC ELECTRIC COMPANY (TAC NO. ME7127)
Dear Mr. Rocheleau:
By application dated September 9, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML11256A051), Central Vermont Public Service Corporation (CVPS) and Gaz Métro Limited Partnership (Gaz Métro) notified the U.S. Nuclear Regulatory Commission (NRC) of a proposed merger between the two companies that would result in a transfer of interests involving NRC licensed facilities. The Application requested that the NRC staff make a threshold determination that the proposed transfer of CVPS interests in Maine Yankee Atomic Power Company (Maine Yankee), Connecticut Yankee Atomic Power Company (Connecticut Yankee), and Yankee Atomic Electric Company (Yankee Atomic) (collectively, the Yankee Companies) to Gaz Métro would not constitute a direct or indirect transfer of the licenses that would require NRC approval pursuant to Title 10 of the Code of Federal Regulations (10 CFR) CFR 50.80, Transfer of licenses.
The NRC staff completed its review of the facts and information as set forth in the application, and concludes that the proposed merger between CVPS and Gaz Métro will not constitute a direct or indirect transfer of control of the Maine Yankee, Connecticut Yankee or Yankee Atomic licenses. Therefore, neither Maine Yankee, Connecticut Yankee, nor Yankee Atomic require the NRCs approval under Section 184 of the Atomic Energy Act of 1954, as amended, and 10 CFR 50.80, with respect to the licenses currently held by them in connection with the proposed merger between CVPS and Gaz Metro.
Enclosure 3
D. Rocheleau Please contact James Kim at 310-415-4125 if you have any questions.
Sincerely,
/RA/
Louise Lund, Acting Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-423
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION REQUEST FOR THRESHOLD DETERMINATION OF THE PROPOSED MERGER BETWEEN CVPS AND GAZ MÉTRO INVOLVING MINORITY COMMON STOCK OWNERSHIP IN MAINE YANKEE ATOMIC COMPANY, CONNECTICUT YANKEE ATOMIC COMPANY, AND YANKEE ATOMIC ELECTRIC COMPANY DOCKET NOS. 50-309, 72-30; 50-213, 72-39;50-029; 72-31
1.0 INTRODUCTION
By application dated September 9, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML11256A051), Central Vermont Public Service Corporation (CVPS) and Gaz Métro Limited Partnership (Gaz Métro) notified the U.S. Nuclear Regulatory Commission (NRC) of a proposed merger between the two companies that would result in a transfer of interests involving NRC licensed facilities. The application requested that the NRC make a threshold determination whether a proposed transfer of CVPS interests in Maine Yankee Atomic Power Company (Maine Yankee), Connecticut Yankee Atomic Power Company (Connecticut Yankee), and Yankee Atomic Electric Company (Yankee Atomic) (collectively, the Yankee Companies) to Gaz Métro would constitute a direct or indirect transfer of the licenses that would require NRC approval pursuant to Title 10 of the Code of Federal Regulations (10 CFR) CFR 50.80, Transfer of licenses.
2.0 BACKGROUND
By application dated September 9, 2011 (ML11256A051), as supplemented by letters dated November 4, 2011 (ML11311A148), April 6, 2012 (ML12100A017), and May 4, 2012 (ML12128A433), (collectively, the application), Central Vermont Public Service Corporation (CVPS) and Gaz Métro Limited Partnership (Gaz Métro) requested that the U.S. Nuclear Regulatory Commission (NRC) consent, pursuant to 10 CFR 50.80, to the indirect transfer of control of CVPS 1.7303% interest in the license for Millstone Power Station, Unit 3 (MPS 3),
resulting from the acquisition of CVPS by Gaz Métro.
According to the application, CVPS also owns, through equity investment, 2% of the outstanding common stock of Maine Yankee Atomic Power Company, 2% of the outstanding common stock of Connecticut Yankee Atomic Power Company, and 3.5% of the outstanding common stock of Yankee Atomic Electric Company (collectively, the Yankee Companies). CVPS and Gaz Métro requested that the NRC staff make a threshold determination that the above requested license transfer transaction does not involve the direct or indirect transfer of control of the NRC licenses held by the Yankee Companies pursuant to 10 CFR 50.80.
CVPS is a Vermont corporation and the largest electric utility in Vermont. CVPS engages in the purchase, production, transmission, distribution and sale of electricity.
Gaz Métro is a Canadian energy company.
3.0 EVALUATION The NRC staff reviewed the application submitted by CVPS and Gaz Métro in order to make a threshold determination on whether the proposed merger between CVPS and Gaz Métro would involve a direct or indirect control of the NRC licenses held by the Yankee Companies that would require approval pursuant to 10 CFR 50.80. The regulation at 10 CFR 50.80 states:
No license for a production or utilization facility (including, but not limited to, permits under this part and part 52 of this chapter, and licenses under parts 50 and 52 of this chapter), or any right thereunder, shall be transferred, assigned, or in any manner disposed of, either voluntarily or involuntarily, directly or indirectly, through transfer or control of the license to any person, unless the Commission gives its consent in writing.
According to the application, CVPS interest in the Yankee Companies is as a shareholder only.
Each Yankee Company holds a Part 50 license and a general Part 72 license for an Independent Spent Fuel Storage Installation (ISFSI) and is the sole licensee for its facility.
CVPS has no operational authority for the Yankee Companies licensed ISFSIs. In addition, CVPS is not a party to any voting agreement or arrangement with any of the owners or licensees of the Yankee Companies that could give it voting rights that are greater than those associated with its minority shareholder interests in the companies. It does not have other financial interests that would allow it to participate in the management and operation of the licensee. Accordingly, the result of the proposed merger between CVPS and Gaz Métro, and the associated interests in the Yankee Companies, does not result in a transfer of control with respect to the Yankee Companies and the Yankee Company licenses.
Regarding foreign ownership, control, or domination, Section 103d of the Atomic Energy Act of 1954, as amended provides in part:
No license may be issued to an alien or any corporation or other entity if the Commission know or has reason to believe it is owned, controlled, or dominated by an alien, a foreign corporation or a foreign government. In any event, no license may be issued to any person within the United States if, in the opinion of the Commission, the issuance of a license to such a person would be inimical to the common defense and security or to the health and safety of the public.
The NRCs regulation 10 CFR 50.38 contains language to implement this statutory prohibition.
As stated, the result of the proposed merger between CVPS and Gaz Métro, and the associated interests in the Yankee Companies, does not result in a transfer of control with respect to the Yankee Companies and the Yankee Company licenses, and does not provide CVPS or Gaz Metro with any responsibility over spent fuel, access to restricted data, or right of participation, whether or not exercised, in the management and operation of the licensees. Additionally, as a result of the afore-mentioned indirect license transfer for Millstone 3 (ML121300466), CVPS is implementing a Negation Action Plan (NAP) to ensure that any foreign ownership, control, or domination of Millstone 3 and the Yankee Companies is negated. NRC staff reviewed and
approved this NAP as part of the safety evaluation for the indirect license transfer. Furthermore, in an unrelated licensing action, a NAP has been implemented for each of the Yankee Companies via confirmatory orders issued by the NRC (ML12124A372, ML12124A373, ML12124A374), which negate foreign ownership, control, or domination of the Yankee Companies.
4.0 CONCLUSION
The NRC staff conducted a threshold review of the facts and information as set forth in the application, and has considered how the proposed merger between CVPS and Gaz Métro will be implemented as described in the application. The NRC staff concludes that the proposed merger will not result in a transfer of control with respect to the Yankee Companies, and, thus, CVPS and Gaz Métro do not require the NRCs approval under Section 184 of the Atomic Energy Act of 1954, as amended, and 10 CFR 50.80 with respect to the afore-mentioned licenses. In addition, based on the application, the NRC concludes that the foreign ownership, control, or domination of the Yankee Company licensees has been negated by existing Negation Action Plans.
Principal Contributor: Shawn Harwell Date: June 15, 2012