LimerickNPEm Resource From: Kuntz, Robert Sent: Wednesday, February 01, 2012 11:33 AM To: 'Christopher.Wilson2@exeloncorp.com'

Subject:

DRAFT Request for Information RE: Limerick LRA Attachments: Limerick EMCB and EEEB Scoping RAIs.docx

Chris, Attached is a DRAFT Request for Information related to the Limerick Generating Station license renewal application. If Exelon would like clarification on the attached contact me and I will set up a teleconference.

Robert Kuntz Senior Project Manager NRR/DLR/RPB1 301-415-3733 1

Hearing Identifier: Limerick_LR_NonPublic Email Number: 1103 Mail Envelope Properties (94A2A4408AC65F42AC084527534CF41673F0E4054A)

Subject:

DRAFT Request for Information RE: Limerick LRA Sent Date: 2/1/2012 11:33:19 AM Received Date: 2/1/2012 11:33:00 AM From: Kuntz, Robert Created By: Robert.Kuntz@nrc.gov Recipients:

"'Christopher.Wilson2@exeloncorp.com'" <Christopher.Wilson2@exeloncorp.com>

Tracking Status: None Post Office: HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 320 2/1/2012 11:33:00 AM Limerick EMCB and EEEB Scoping RAIs.docx 37015 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

DRAI 2.4.4-1 Clarify if there are any trash racks, basket strainers, traveling screens or any other debris prevention/removing mechanisms that are part of the Circulating Water Pump House that would be required to be in scope of license renewal in accordance with 10 CFR 54.4. If so, also identify the applicable aging effects and the aging managing program (AMP) related to these components.

DRAI 2.4.6-1 Confirm the inclusion of the rubberized flat dumbbell-type water stops that are located at all construction joints below the maximum expected groundwater level for all safety-related enclosures as stated in Limerick Generating Station (LGS) Updated Final Safety Analysis Report (UFSAR) Section 3.4.1.2 are within the scope of license renewal.(LR) and subject to an Aging Management Review. Otherwise, justify the exclusion from the scope of the LR.

DRAI 2.4.6-2 LGS UFSAR states in Section 2.4.2.3.3 that measures are taken to limit the possible flow of flood water from the turbine enclosure into the control enclosure where the safety-related chilled water system is located at el 200. These measures include controlling openings in the lower portion of the turbine enclosure walls, relying on flood control features within the turbine building, and by limiting the flow of water through the turbine enclosure doors by providing additional curbs and barriers inside the turbine enclosure and by administratively controlling the opening of certain doors.

However, LGS license renewal application (LRA) states in Section 2.4.6 that not included in the boundary of the Control Enclosure is the adjacent tunnel located in the Turbine Enclosure which runs along the north, east and west sides of the Control Enclosure.

Provide additional information that clarifies the overall configuration and clearly states the boundary for LR between the Turbine Enclosure and the Control Enclosure. The additional information presented should have special emphasis on flood control and flood prevention measures/mechanisms between the two structures.

DRAI 2.4.8-1 Confirm if the duplex-type basket strainers that are provided in each transfer pump discharge line that prevent solid particles or debris from entering the day tanks in the diesel oil storage tank structure would be required to be in scope of license renewal in accordance with 10 CFR 54.4. If so, also identify the applicable aging effects and the AMP related to this component. Otherwise, justify the exclusion from the scope of license renewal.

ENCLOSURE 1

DRAI 2.4.8-2 Please provide additional information regarding the metal enclosure (butler building) that is located over the diesel oil storage tank structure. Specifically, the information should address and justify the exclusion of the metal enclosure from the scope of license renewal as well as a detailed description on how its failure would not prevent satisfactory accomplishment of a safety-related function per 10 CFR 54.4.

DRAI 2.4.16-1 LRA Section 2.4.16 states that blowout panels are provided at the turbine enclosure for pressure relief as well as internal flood relief purposes. However, Table 2.4-16 only credits the blowout panels with the Pressure Relief intended function and does not give credit for the flood barrier capabilities described in the LRA. Please clarify the aforementioned discrepancy between the information provided in LRA 2.4.16 and Table 2.4-16 or otherwise, justify the exclusion of the flood mitigating capabilities of the blowout panels described in the LRA from the scope of license renewal.

DRAI 2.5-1 In accordance with 10 CFR 54.4(a)(3) and SRP-LR Section 2.5.2.1.1, the control circuits and structures associated with the switchyard circuit breakers used to supply the station blackout recovery paths should be in scope of license renewal. Please, confirm whether these components are within the scope of license renewal.

Letter to M. Gallagher from R. Kuntz dated February 01, 2012

SUBJECT:

REQUESTS FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE LIMERICK GENERATING STATION, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION (TAC NOS. ME6555 AND ME6556)

DISTRIBUTION:

HARD COPY:

DLR RF E-MAIL:

PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRerb Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRapb Resource RidsNrrDlrRpob Resource RidsNrrPMLimerick Resource RidsOgcMailCenter Resource RKuntz DMorey LPerkins MSmith, OGC RConte, RI MModes, RI GDiPaolo, RI NSieller, RI