ML12163A687
| ML12163A687 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 09/16/2011 |
| From: | - No Known Affiliation |
| To: | Division of License Renewal |
| References | |
| Download: ML12163A687 (3) | |
Text
1 LimerickNPEm Resource From:
Christopher.Wilson2@exeloncorp.com Sent:
Friday, September 16, 2011 3:03 PM To:
Kuntz, Robert
Subject:
Requests for the Limerick NPP Audit..feedback Rob Our civil guy did a preliminary assessment of this request and his feedback was that the scope of the document request is unrealistically large. I suspect Ata doesnt understand the depth/breath of what hes asking for. Suggest we try to limit it to things like last two cycles of inspection reports or prominent findings from inspections, or program procedures. We have Results Books which should have most of what he needs. Anything else we can obtain on a request basis.
Chris From: Kuntz, Robert [1]
Sent: Friday, September 16, 2011 10:12 AM To: Wilson, Christopher D:(GenCo-Nuc)
Subject:
FW: Requests for the Limerick NPP Audit
- Chris, The following is a request from the structural reviewer who will be on site the week of August 11th. Let me know if you need any clarification on this request.
Could you please request the following information available during the Limerick Audit:
- 1. Provide copies of all detailed structural/construction drawings of the containment building, and other relevant drawings to the Aging Management Programs (AMPs) listed in item 2 below.
- 2. Provide copies of all Inspections Reports issued for the following AMPs: IWE (XI.S1), IWL (XI.S2), IWF (XI.S3),
10 CFR Appendix J (XI.S4), Masonry wall (XI.S5), Structural Monitoring (XI.S6), Water-Control Structures (XI.S7),
Tendon Pre-stress (X.S1). If there were action-items resulted from the inspections, provide copies of the reports of repairs/replacements, analytical evaluations/analyses, follow-up inspections, etc.
- 3. Provide copies of all relevant plant (1) Directive, (2) Procedure, (3) Guidance documents.
- 4. Provide copies of all relevant consultants and/or contractors (1) Directive, (2) Procedure, (3) Guidance documents, who performed/perform work on the AMPs listed in item 2 above.
Robert Kuntz Sr. Project Manager NRR/ADRO/DLR/RPB1 (301) 415-3733 robert.kuntz@nrc.gov
2
- This e-mail and any of its attachments may contain Exelon Corporation proprietary information, which is privileged, confidential, or subject to copyright belonging to the Exelon Corporation family of Companies. This e-mail is intended solely for the use of the individual or entity to which it is addressed. If you are not the intended recipient of this e-mail, you are hereby notified that any dissemination, distribution, copying, or action taken in relation to the contents of and attachments to this e-mail is strictly prohibited and may be unlawful. If you have received this e-mail in error, please notify the sender immediately and permanently delete the original and any copy of this e-mail and any printout. Thank You. **************************************************
Hearing Identifier:
Limerick_LR_NonPublic Email Number:
404 Mail Envelope Properties (9A15F707EB47A04D882D9FEB352EDDF80353A3B6)
Subject:
Requests for the Limerick NPP Audit..feedback Sent Date:
9/16/2011 3:03:09 PM Received Date:
9/16/2011 3:03:17 PM From:
Christopher.Wilson2@exeloncorp.com Created By:
Christopher.Wilson2@exeloncorp.com Recipients:
"Kuntz, Robert" <Robert.Kuntz@nrc.gov>
Tracking Status: None Post Office:
cccmsxch12.energy.power.corp Files Size Date & Time MESSAGE 2869 9/16/2011 3:03:17 PM Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received: