Category:Letter
MONTHYEARML24151A3842024-10-31031 October 2024 – Issuance of Amendment Nos. 264 and 226 Support to Digital Modernization Project Installation (EPID L-2023-LLA-0025) and Exemption from the Requirements of 10 CFR 50.62 ML24303A0902024-10-29029 October 2024 Operator Licensing Examination Approval ML24303A2782024-10-29029 October 2024 10 CFR 50.46 Annual Report ML24299A2642024-10-25025 October 2024 Response to Request for Supplemental Information Needed for Acceptance of Requested Licensing Action Regarding Primary Containment Leakage Technical Specifications IR 05000352/20240122024-10-17017 October 2024 Commercial Grade Dedication Inspection Report 05000352/2024012 and 05000353/2024012 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24274A2372024-10-0707 October 2024 – Supplemental Information Needed for Acceptance of Requested Licensing Action Regarding Primary Containment Leakage Technical Specifications ML24278A3022024-10-0404 October 2024 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10 CFR 50.62 ATWS Rule to Support the Digital Modernization Project Installation - Rev Unit 2 Technical Spec ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24263A0032024-09-27027 September 2024 Generation Station, Units 1 and 2 – Regulatory Audit Plan Supporting Review of the Component Interface Module System of the Limerick Digital Instrumentation and Controls License Amendment Request (EPID L-2022-LLA-0140) (Redacted) ML24243A0482024-09-19019 September 2024 Generation Station, Unit Nos. 1 and 2 - Schedule Update for License Amendment Request to Replace Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System ML24215A4042024-09-18018 September 2024 Request for Withholding Information from Public Disclosure IR 05000352/20244202024-09-16016 September 2024 – Security Baseline Inspection Report 05000352/2024420 and 05000353/2024420 RS-24-090, Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-09-12012 September 2024 Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds IR 05000352/20250102024-09-10010 September 2024 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000352/2025010 and 05000353/2025010 ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification IR 05000352/20240052024-08-29029 August 2024 Updated Inspection Plan for Limerick Generating Station, Units 1 and 2 (Report 05000352/2024005 and 05000353/2024005) ML24241A1952024-08-28028 August 2024 License Amendment Request for Modification to Technical Specification 3.6.1.2 and Main Steam Isolation Valve Leakage Rate Requirements ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 ML24163A3902024-08-14014 August 2024 Request for Withholding Information from Public Disclosure ML24220A2392024-08-12012 August 2024 Correction to Technical Specification Page 3/4 3-11 in Amendment No. 225 IR 05000352/20240022024-08-12012 August 2024 Integrated Inspection Report 05000352/2024002 and 05000353/2024002 ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24204A0712024-07-29029 July 2024 Issuance of Amendment Nos. 263 and 225 Technical Specifications for Main Steam Line Tunnel Temperature ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification ML24208A1592024-07-25025 July 2024 Regulatory Audit Plan Supporting Review of the System Development Portion of Limerick Digital Instrumentation and Controls License Amendment Request (EPID L-2022-LLA-0140) - Non-Proprietary ML24201A1662024-07-19019 July 2024 Response to Request for Additional Information for License Amendment Request for Proposed Changes to the Technical Specification Isolation Actuation Instrumentation Tables and New Turbine Enclosure Main Steam L ML24199A1842024-07-15015 July 2024 RAI-LAR for Limerick EPID: L-2024-LLA-0079- Use This Version RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions ML24180A1572024-06-28028 June 2024 Request to Return and Replace WEC Documents (EQ-EV-386-GLIM, EQ-QR- 433-GLIM, and APP-GW-GLR-611), to Meet 10CFR2.390 Request to Withdraw from Public Disclosure Requirements ML24170A7702024-06-20020 June 2024 Individual Notice of Consideration of Issuance of Amendments to Renewed Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, Opportunity for Hearing(Epid L-2024-LLA-0079) LTR 05000352/LER-2024-003, Core Operating Limits Report Thermal Limit Exceeded for Unit 1 Fuel Bundle GGK1232024-06-18018 June 2024 Core Operating Limits Report Thermal Limit Exceeded for Unit 1 Fuel Bundle GGK123 ML24166A1142024-06-14014 June 2024 Response to Requests for Additional Information (RAIs 15 Through 23) for License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24165A2642024-06-13013 June 2024 License Amendment Request for Proposed Changes to the Technical Specification Isolation Actuation Instrumentation Tables and New Turbine Enclosure Main Steam Line Tunnel Temperature TS 3/4.7.9 05000352/LER-2024-002, Invalid Actuation Due to a Trip of 1B Reactor Protection System Circuit Breaker2024-06-10010 June 2024 Invalid Actuation Due to a Trip of 1B Reactor Protection System Circuit Breaker ML24151A2882024-06-10010 June 2024 Request for Withholding Information from Public Disclosure ML24151A2012024-06-10010 June 2024 Request for Withholding Information from Public Disclosure 05000352/LER-2024-001, Leakage for the Unit 1 `B Outboard Main Steam Isolation Valve Exceeded Technical Specification Limit2024-06-10010 June 2024 Leakage for the Unit 1 `B Outboard Main Steam Isolation Valve Exceeded Technical Specification Limit ML24150A0242024-05-29029 May 2024 Notification of Commercial Grade Dedication Inspection (05000352/2024012 and 05000353/2024012) and Request for Information ML24149A2112024-05-28028 May 2024 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFR50.62 ATWS Rule to Support the Digital Modernization Project Installation ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 IR 05000352/20243022024-05-20020 May 2024 Revised Initial Operator Licensing Examination Report 05000352/2024302 and 05000353/2024302 RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report IR 05000352/20240012024-05-0707 May 2024 Integrated Inspection Report 05000352/2024001 and 05000353/2024001 ML24124A0432024-05-0303 May 2024 Response to Requests for Additional Information (RAIs 9 Through 14) for License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with RS-24-038, Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-05-0202 May 2024 Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24114A3222024-04-23023 April 2024 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System (PPS) - Pivot to Unit ML24109A0702024-04-18018 April 2024 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFRC50.52 ATWS Rule to Support the Digital Modernization Project Installation . 2024-09-06
[Table view] |
Text
Michael P. Gaflagher Teiephone 610.765.5958 Exalt n VlCe President Fax 610.765.5658 Nuclear License Renewa www.exeloncorp.com michaelp.gallagher@exeloncorp.com Exelon Nuclear 200 Exelon Way Kennett Square, PA '9348 10 CFR 50 10 CFR 51 10 CFR 54 June 8. 2012 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353
Subject:
Response to NRC Request for Additional Information, dated May 18, 2012, related to the Limerick Generating Station License Renewal Application
Reference:
- 1. Exelon Generation Company, LLC letter from Michael P. Gallagher to NRC Document Control Desk, MApplication for Renewed Operating Licenses", dated June 22, 2011
- 2. Letter from Robert F. Kuntz (NRC) to Michael P. Gallagher (Exelon).
MRequests for Additional Information for the review of the Limerick Generating Station, Units 1 and 2, License Renewal Application (TAC Nos. ME6555, ME6556)", dated May 18, 2012 In the Reference 1 letter, Exelon Generation Company, LLC (Exelon) submitted the License Renewal Application (LRA) for the Limerick Generating Station, Units 1 and 2 (LGS). In the Reference 2 letter, the NRC requested additional information to support the staffs' review of the LRA.
Enclosed is the response to this request for additional information.
This letter and its enclosure contain no new or revised regulatory commitments.
If you have any questions. please contact Mr. AI Fulvio, Manager, Exelon License Renewal, at 610-765-5936.
u.s. Nuclear Regulatory Commission June 8,2012 Page 2 I declare under penalty of perjury that the foregoing is true and correct.
Executed on Respectfully,
~j)$f=
Vice President - License Renewal Projects Exelon Generation Company, LLC
Enclosure:
Response to Request for Additional Information cc: Regional Administrator - NRC Region I NRC Project Manager (Safety Review), NRR-DLR NRC Project Manager (Environmental Review), NRR-DLR NRC Project Manager, NRR- DORL Limerick Generating Station NRC Senior Resident Inspector, Limerick Generating Station R. R. Janati, Commonwealth of Pennsylvania
Enclosure Page 1 of 3 Enclosure Response to Request for Additional Information related to scoping boundaries associated with the LGS License Renewal Application (LRA)
RAI2.3.3-2
Enclosure Page 2 of 3 RAl2.3.3-2
Background
By letter, dated March 9, 2012, the staff issued several requests for additional information (RAI) regarding clarificat10n of scoping boundaries as found in the license renewal boundary drawings. The response to the RAls, provided by letter dated March 20, 2012, described in each instance which of the existing scoping boundaries were either correct or that the scoping boundaries were going to be revised on the license renewal boundary drawings. The following RAls in the March 20, 2012, letter were identified in the RAI response that the license renewal boundary drawings were going to be revised:
- RAI2.3.3-01 (LR-M-78 Sheet 1; LR-M-20 Sheets 4,5,7,10,11, and 13; LR-M-44 Sheet 1; and LR-M-51 Sheet 4)
- RAI2.3.3.12-01 (LR-M-10 Sheet 3 and 8)
- RAI2.3.3.14-01 (LR-M-59 Sheet 1)
- RAI 2.3.3.14-02 (LR-M-59 Sheet 3)
- RAI 2.3.3.22-01 (LR-M-23 Sheet 7)
- RAI2.3.3.22-02 (LR-M-23 Sheet 4)
- RAI 2.3.4-01 (LR-M-41 Sheet 2; LR-M-49 Sheet 1; LR-M-50 Sheet 2; and LR-M-55 Sheet 1)
- RAI 2.3.4.3-01 (LR-M-07 Sheets 1 and 3)
- RAI 2.3.4.6-01 (LR-M-05 Sheets 3 and 6) .
- RAI2.3.4.7-01 (LR-M-05 Sheet 2 and LR-M-07 Sheet 2)
RAI2.3.4.7-02 (LR-M-06 Sheets 2 and 5)
Although the response has described the revisions to be made to the license renewal boundary drawings the staff needs to confirm that the revisions were made in each instance above to complete its review. The staff's confirmatory review will consist of identifying that the system components were appropriately included within the revised scoping boundaries on the license renewal boundary drawings.
Request Provide the revised license renewal boundary drawings for each of the RAls listed above.
Exelon Response The following License Renewal drawings have been revised in accordance with the descriptions of the changes provided in RAI Responses referenced in the RAI Background discussion:
- LR-M-05 Sheets 1, 2, and 3 (Note 1)
- LR-M-07 Sheets 1, 2 and 3
- LR-M-20 Sheets 4, 5, 7, 10, 11, and 13
Enclosure Page 3 of 3
- LR-M-78 Sheet 1 Note 1 - The response to RAI 2.3.4.6-1, provided within the letter dated March 20, 2012, described changes to drawings LR-M-05 Sheets 1 and 3, but mistakenly referenced Sheet 6 in the last sentence. The last sentence in the response should have read, "LR-M-05 Sheet 1 and Sheet 3 will be revised to show the transition from in scope piping to piping not in scope for the three oily waste drain pipes, and a Note 3 will be added at each location to describe the basis for the change from red to black." Therefore, it is clarified that LR-M-05 Sheets 1 and 3 were revised and not Sheet 6. LR-M-05 Sheet 2 was revised as described in the response to RAI 2.3.4.7-1.
These drawing revisions were reviewed by the NRC regional inspectors during the first week of the NRC IP 71002 regional inspection conducted June 4 through June 8, 2012. It was agreed with the NRC License Renewal Project Manager that Exelon need not submit the revised license renewal boundary drawings for each of the RAls referenced in the above Background discussion.