MONTHYEARML23128A1612023-05-0808 May 2023 NRR E-mail Capture - Comanche Peak Nuclear Power Plant, Units 1 and 2, Beaver Valley Power Station, Unit Nos. 1 and 2, Davis-Besse Nuclear Power Station, Unit 1, and Perry Nuclear Power Plant, Unit No. 1 - Acceptance of Requested Licensing ML23086B9862023-03-27027 March 2023 NRR E-mail Capture - Davis-Besse, Unit No. 1 - Acceptance Review Results for Davis-Besse, Unit No. 1 - Proposed Alternative Request RP-5 ML23033A0322023-02-0101 February 2023 NRR E-mail Capture - Request for Additional Information for Davis-Besse's 2022 Steam Generator Inspection Report (L-2022-LRO-0115) ML22266A1102022-09-23023 September 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding July 21, 2022, Request for Withholding Information from Public Disclosure ML22164A8572022-06-13013 June 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Revise the Emergency Plan ML22118A6862022-04-28028 April 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Alternative to Extend the Steam Generator Weld Inspection Interval ML22112A1092022-04-22022 April 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Revise the Design Basis for the Shield Building ML22090A1692022-03-30030 March 2022 Re_ Action Tracking Item 2022 SST - 335 - Tom Gurdziel, E-mail Re_ Event Number 55734 at Davis Besse, a Matter of Interpretation ML22080A2512022-03-18018 March 2022 NRR E-mail Capture - (External_Sender) ASME OM Code Case OMN-27, Alternative Requirements for Testing Category a Valves (Non- Piv/Civ) ML22055B0382022-02-24024 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Upcoming Steam Generator Tube Inservice Inspection ML22055A0872022-02-23023 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Relief Request RP-3 ML22045A4962022-02-14014 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of License Amendment Request to Revise the Emergency Plan ML22040A1832022-02-0707 February 2022 LTR-22-0033 Tom Gurdziel, E-mail Event Number 55734 at Davis Besse, a Matter of Interpretation ML22034A9472022-02-0303 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Revised Review Estimates for Proposed Alternative to Extend the Steam Generator Weld Inspection Interval ML22033A0632022-02-0101 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of License Amendment Request to Revise the Design Basis for the Shield Building Containment Structure ML21321A3782021-11-16016 November 2021 NRR E-mail Capture - Energy Harbor Fleet, Beaver Valley Units 1 and 2 and DAVIS-BESSEL Unit 1 - Acceptance of License Amendment Request Adoption of TSTF-554 EPID-L-2021-LLA-0193 ML21321A3792021-11-16016 November 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Alternative to Extend the Steam Generator Weld Inspection Interval ML21287A0382021-10-14014 October 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of Requests for Relief from Certain Inservice Testing Requirements ML21271A1332021-09-28028 September 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of Proposed Alternative RR-A2 for Certain Steam Generator Weld Inspections ML21119A2152021-04-28028 April 2021 NRR E-mail Capture - Energy Harbor Fleet, Beaver Valley Units 1 and 2 and DAVIS-BESSE Unit 1 - Acceptance of Relief Request Proposed Alternative to Use ASME OM Code Case OMN-27 ML21041A5452021-02-10010 February 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Steam Generator Tube Inspection Reports ML21007A3732021-01-0707 January 2021 NRR E-mail Capture - (External_Sender) (External) Request for Additional Information Regarding License Amendment Request to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff, ML21004A1442020-12-30030 December 2020 NRR E-mail Capture - Request for Additional Information Regarding License Amendment Request to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff ML20329A3832020-11-24024 November 2020 NRR E-mail Capture - Davis Besse Nuclear Power Station, Unit No. 1 - Request for an Exemption from the 2020 Force-on-Force Exercises ML20304A2842020-10-29029 October 2020 50.59 Inspection 2nd Request for Information ML20289A0992020-10-0505 October 2020 NRR E-mail Capture - Energy Harbor Fleet, Results of Acceptance Review Request to Use Provision in Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, EPID-l-2020-LLR-0132 ML20281A3692020-10-0505 October 2020 Energy Harbor Fleet, Results of Acceptance Review Request to Use Provision in Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, EPID-l-2020-LLR-0132 ML20239A7942020-08-25025 August 2020 NRR E-mail Capture - Energy Harbor Fleet, Beaver Valley Units 1 and 2 and DAVIS-BESSEL Unit 1 - Acceptance of License Amendment Request Incorporation of Applicable Standard in TS 5.2.2.e ML20203M3712020-07-21021 July 2020 Ultimate Heat Sink Request for Information Part 1 ML20203M3722020-07-21021 July 2020 Ultimate Heat Sink Request for Information Part 1 and Part 2 L-20-183, Response to Request for Additional Information Regarding License Amendment Request for Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force2020-06-23023 June 2020 Response to Request for Additional Information Regarding License Amendment Request for Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force ML20154K7642020-06-0202 June 2020 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Adopt TSTF-425 ML20127H8672020-05-0606 May 2020 NRR E-mail Capture - Beaver Valley, Davis-Besse, and Perry - Request for Additional Information Regarding Request for Exemptions from Part 73 Security Requalification Requirements ML20058D3152020-02-27027 February 2020 Completion of License Transfer for the Beaver Valley, Davis-Besse and Perry Nuclear Units ML20024E0092020-01-23023 January 2020 NRR E-mail Capture - FENOC License Transfer - January 23, 2020 Call Summary ML20021A3162020-01-21021 January 2020 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Request for Additional Information Regarding License Amendment Request to Revise Containment Leakage Rate Testing ML19346B3972019-12-11011 December 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of License Amendment Request to Adopt TSTF-425 ML19273A1132019-09-27027 September 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Acceptance of License Amendment Request to Extend Containment Leakage Rate Test Interval ML19179A1382019-06-28028 June 2019 NRR E-mail Capture - Davis-Besse - Request for Additional Information Regarding the Decommissioning Quality Assurance Program ML19164A1532019-06-13013 June 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Request for Additional Information Regarding License Amendment Request for Post-Shutdown Emergency Plan ML19162A3922019-06-11011 June 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Request for Additional Information Regarding License Amendment Request for Permanently Defueled Technical Specifications ML19161A2132019-06-0606 June 2019 NRR E-mail Capture - Results of Acceptance Review - FENOC Fleet - Request for Approval of Request for Approval of Lrradiated Fuel Management Plans, EPID L-2019-LRO-0016 ML19149A6202019-05-29029 May 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Approval of the Decommissioning Quality Assurance Program ML19130A2082019-05-0808 May 2019 Email - NRC Email to FEMA Dated May 8, 2019: NRC Response to Comment on FEMA Review of Proposed Changes to DBNPS Emergency Plan for Permanently Defueled Condition ML19106A2512019-04-16016 April 2019 NRR E-mail Capture - Davis-Besse - Proposed License Condition and Draft Safety Evaluation for the License Amendment Request to Adopt NFPA 805 ML19073A1112019-03-14014 March 2019 NRR E-mail Capture - Davis-Besse - Acceptance of License Amendment Request for Permanently Defueled License and Technical Specifications ML19043A6962019-02-0808 February 2019 NRR E-mail Capture - Davis-Besse License Amendment Request for the Post-Shutdown Emergency Plan ML18320A1272018-11-16016 November 2018 NRR E-mail Capture - Davis-Besse LAR to Change TS Definitions and Administrative Controls for Permanently Defueled Conditions ML18282A1482018-10-0909 October 2018 NRR E-mail Capture - Results of Acceptance Review - FENOC Fleet - Request for Exemption Related to the Suspension of Security Measures in an Emergency or During Severe Weather, EPID L-2018-LLL-0016 ML18282A2422018-10-0808 October 2018 OEDO-18-00160, FENOC Fleet, 2.206 Petition, Submission of Supplement Dated October 8, 2018, from the Petitioners - PRB and Petitioners (Elpc), Includes Email, Cover Letter from Elpc, and the Attachments to the Email 2023-05-08
[Table view] Category:Photograph
MONTHYEARML12144A1882012-05-21021 May 2012 Email -- Davis-Besse Non-Proprietary Photos Msh ML11348A0132010-12-11011 December 2010 Public Comments on the NRC Re-Licensing of the Davis Besse Nuclear Plant, Columbus Ohio, December 11, 2010 ML12038A2032010-03-13013 March 2010 Picture of Damaged Davis-Besse Reactor Vessel Head 2010 ML0708602802007-03-15015 March 2007 Review and Analysis of the Davis-Besse March 2002 Reactor Pressure Vessel Head Wastage Event, Section 10. the Unique Nature of the Davis-Besse Nozzle 3 Crack and the RPV Head Wastage Cavity ML0708602712007-03-15015 March 2007 Review and Analysis of the Davis-Besse March 2002 Reactor Pressure Vessel Head Wastage Event, Section 8. Stress Analysis and Crack Growth Rates for Davis-Besse CRDM Nozzles 2 and 3 ML0708602682007-03-15015 March 2007 Review and Analysis of the Davis-Besse March 2002 Reactor Pressure Vessel Head Wastage Event, Section 7. FENOC/Davis-Besse Response to CRDM Cracking and Boric Acid Corrosion Issues ML0708602642007-03-15015 March 2007 Review and Analysis of the Davis-Besse March 2002 Reactor Pressure Vessel Head Wastage Event, Section 6. Boric Acid Wastage of Carbon Steel Components in Us PWR Plants ML0708602562007-03-15015 March 2007 Review and Analysis of the Davis-Besse March 2002 Reactor Pressure Vessel Head Wastage Event, Section 4. the Davis-Besse March 2002 Event ML0708602532007-03-15015 March 2007 Review and Analysis of the Davis-Besse March 2002 Reactor Pressure Vessel Head Wastage Event, Section 3. Background ML0329011162003-10-17017 October 2003 Attachment to Event Inquiry Regarding Nrc'S Oversight-of Davis-Besse Boric Acid Leakage and Corrosion During the April 2000 Refueling Outage (Case No. 03-02S) ML0308507392002-05-20020 May 2002 Various Picture Files Named DCP 2464, 2466, 2482, 2483, 2485, 2488, 2493, Jpg for S. Long'S Computer ML0308505992002-05-14014 May 2002 Picture File Named Cavity Locking Toward Nozzle Eleven. Jpg from S. Long'S (NRR) Computer ML0308505132002-04-24024 April 2002 Picture File Named Nozzle 46. Ppt from S. Long'S (NRR) Computer Provided by Fenco ML0308502362002-03-28028 March 2002 Picture File Named Safety Significance Determination Files Shaded Finite Element Model. Pdf from S. Long'S (NRR) Computer Provided by Fenco ML0216205422002-03-16016 March 2002 Y020020137 - Paul Blanch to John Zwolinski and Anthony Mendiola E-mail (Photo) Re NRC AIT Report and the DB RCA ML0308502062002-03-16016 March 2002 Powerpoint File Named pictures-NRC 032902 Ppt from S. Longs Computer ML0308501992002-03-10010 March 2002 Fenco Various Pictures of Nozzles 1, 2, and 3 from S. Long'S Computer ML0530705122001-12-31031 December 2001 Results of Visual Examination of CRDM Nozzle Penetrations ML0530705002000-04-26026 April 2000 12 RFO Color Photos of Reactor Head; CR-2000-0782; Condition Report 2000-1037 2012-05-21
[Table view] |
Text
Pictures for potential use in NRC Report-Request to Verify No Proprietary Information From: gmwolf@firstenergycorp.com [1]
Sent: Thursday, April 12, 2012 4:32 PM To: Holmberg, Mel; Shaikh, Atif; Kimble, Daniel; Hills, David; Sanchez Santiago, Elba; Neurauter, James Cc: jghook@firstenergycorp.com; thenry@firstenergycorp.com; klbrowning@firstenergycorp.com; pjmccloskey@firstenergycorp.com; sdhall@firstenergycorp.com; jyoung@firstenergycorp.com
Subject:
Re: Pictures for potential use in NRC Report-Request to Verify No Proprietary Information Mel - Davis-Besse personnel have reviewed the pictures and determined that none contain Proprietary Information.
However, we note that Picture No. 1 appears to be the identical picture posted to the Toledo Blade Newspaper's webpage at http://www.toledoblade.com/image/2012/02/28/800x600_b1_cCM/FirstEnergy-says-that-winddriven-rain-soaked-deep-into-the-concrete.jpg (this was already brought to the attention of Jim Neurauter who is on site today).
As we discussed on the telephone, Picture No. 3 shows the crack that was discovered as a result of the hydro-demolition process. It should be explained with this picture that the hydro-demolition process amplified the crack opening.
Picture No. 7 contained an incorrect date stamp (shows 10/26/2012 instead of 10/26/2011). The picture immediately below (S11-663.75-30-10.jpg) has a corrected date.
Gerry Wolf Supervisor, Nuclear Compliance Davis-Besse Regulatory Compliance desk: 419-321-8001 e-mail:GMWolf@FirstEnergyCorp.com From: "Holmberg, Mel" <Mel.Holmberg@nrc.gov>
To: "gmwolf@firstenergycorp.com" <gmwolf@firstenergycorp.com>
Cc: "Hills, David" <David.Hills@nrc.gov>, "Neurauter, James" <James.Neurauter@nrc.gov>, "Sanchez Santiago, Elba" <Elba.SanchezSantiago@nrc.gov>, "Shaikh, Atif" <Atif.Shaikh@nrc.gov>, "Kimble, Daniel"
<Daniel.Kimble@nrc.gov>
Date: 03/30/2012 11:23 AM
Subject:
Pictures for potential use in NRC Report-Request to Verify No Proprietary Information
Pictures for potential use in NRC Report-Re equest to Verify No Proprietary Information
- Gerry, Below are 12 pictures/figures described in your site records or vendor reports related to your investiga ation of the Davis-Besse shield building cracking. Ple ease confirm that none of these pictures or figures conntain proprietary materials. If any are considered prop prietary, please identify these so we do not incorporate e
them into our report. I will be out of the office ne ext week, but please provide your E-mail response to each NRC member on my distribution for this E--mail.
Thank you Mel Holmberg Picture No. 1 - Davis-Besse Shield Building Picture No. 2 - Davis-Besse Shield Building Flute & Shoulder Details
Davis-Bess Photos for Potential Use in NRC Report-Request to Verify No Proprietary Information Picture No. 3 - Davis-Besse Shield Building Laminar Subsurface Cracking
Davis-Bess Photos for Potential Use in NRC Report-Request to Verify No Proprietary Information Picture No. 4- Davis-Besse Shield Building Impulse Response Testing Mobility Plot
Davis-Bess Photos for Potential Use in NRC Report-Request to Verify No Proprietary Information Picture No. 5- Davis-Besse Shield Building Impulse Response Testing Mobility Plot (Shoulder 9)
Davis-Bess Photos for Potential Use in NRC Report-Request to Verify No Proprietary Information Picture No. 6- Davis-Besse Shield Building Core Bore Location S7-667-25-2 Picture No. 7 -Davis-Besse Shield Building Core Bore Location S11-663.75-30-10
Davis-Bess Photos for Potential Use in NRC Report-Request to Verify No Proprietary Information Picture No. 8 -Davis-Besse Shield Building - Core Bore Sample
Davis-Bess Photos for Potential Use in NRC Report-Request to Verify No Proprietary Information Picture No. 9- Davis-Besse Shield Building Root Cause Analysis Report - Fault Tree
Davis-Bess Photos for Potential Use in NRC Report-Request to Verify No Proprietary Information Picture No. 10 - Davis-Besse Shield Building - Water Migration
Davis-Bess Photos for Potential Use in NRC Report-Request to Verify No Proprietary Information Picture No. 11 - Davis-Besse Shield Building -Location/Progression of Ice Formation
Davis-Bess Photos for Potential Use in NRC Report-Request to Verify No Proprietary Information Picture No. 12 - Davis-Besse Shield Building - Subsurface Radial Tensile Stress The information contained in this message is intended only for the personal and confidential use of the recipient(s) named above. If the reader of this message is not the intended recipient or an agent responsible for delivering it to the intended recipient, you are hereby notified that you have received this document in error and that any review, dissemination, distribution, or copying of this message is strictly prohibited. If you have received this communication in error, please notify us immediately, and delete the original message.