ML12143A147
| ML12143A147 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 05/17/2012 |
| From: | Clark J Entergy Operations |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| RBF1-12-0058, RGB-47242 LER 12-S01-00 | |
| Download: ML12143A147 (3) | |
Text
Enteqy0 Entergy Operations, Inc.
River Bend Station 5485 U.S. Highway 61 N St. Francisville, LA 70775 Tel 225-381-4177 Joseph A. Clark Manager-Licensing May 17, 2012 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
Subject:
Safeguards Event Report 50-458/12-S01-00 River Bend Station Docket No. 50-458 License No. NPF-47 RBG-47242 RBF1-12-0058 Ladies and Gentlemen:
In accordance with 10CFR50.73, enclosed is the subject Safeguards Event Report.
Commitments contained in this document are included on the Commitment Identification Form. Please contact me if you have any questions.
Sincerely, JAC/wjf enclosure The enclosure to this letter contains Security-Related Information and is Withheld from Public Disclosure per 10 CFR 2.390
Safeguards Event Report 50-458/12-S01-00 RBG-47242 Page 2 of 3 cc:
U.S. Nuclear Regulatory Commission Region IV 1600 E. Lamar Blvd.
Arlington, TX 76011-4511 NRC Resident Inspector PO Box 1050 St. Francisville, LA 70775 INPO Records Center E-mail (MS Word format)
Ms. Tracie Lowrey Public Utility Commission of Texas 1701 N. Congress Ave.
Austin, TX 78711-3326 Department of Environmental Quality Office of Environmental Compliance Radiological Emergency Planning and Response Section ATTN: JiYoung Wiley P.O. Box 4312 Baton Rouge, LA 70821-4312 Mr. Alan Wang, Project Manager U.S. Nuclear Regulatory Commission MS O-8B1 11555 Rockville Pike Rockville, MD 20852-2738
Safeguards Event Report 50-458/12-S01-00 RBG-47242 Page 3 of 3 COMMITMENT IDENTIFICATION FORM This table identifies actions discussed in this letter for which Entergy commits to perform.
Any other actions discussed in this submittal are described for the NRC's information and are not commitments.
TYPE SCHEDULED (check one)
COMPLETION ONE-TIME CONTINUING DATE COMMITMENT ACTION COMPLIANCE (If Required)
If additional significant information (i.e., personnel X
within 30 responsible for removal of the binder and/or days after disposition/location of the binder) is identified, a identification supplemental report will be submitted within 30 days after identification of the information.