NRC Staff'S Unopposed Motion for an Extension of Time to Respond to Jones River Watershed Association and Pilgrim Watch'S May 14, 2012, Request to Reopen, for a Hearing and to File New Contentions
ML12136A517
Person / Time
Site: Pilgrim
Issue date: 05/15/2012
From: Matthew Smith
NRC/OGC
To:
Atomic Safety and Licensing Board Panel
SECY RAS
References
RAS 22451, 50-293-LR, ASLBP 12-917-05-LR-BD01
Download: ML12136A517 (5)


Text

May 15, 2012 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

ENTERGY NUCLEAR GENERATION ) Docket No. 50-293-LR COMPANY AND ENTERGY NUCLEAR )

OPERATIONS, INC. )

)

(Pilgrim Nuclear Generating Station) )

NRC STAFFS UNOPPOSED MOTION FOR AN EXTENSION OF TIME TO RESPOND TO JONES RIVER WATERSHED ASSOCIATION AND PILGRIM WATCHS MAY 14, 2012, REQUEST TO REOPEN, FOR A HEARING AND TO FILE NEW CONTENTIONS Under 10 C.F.R. §§ 2.323(a) the NRC Staff (Staff) hereby requests an extension of time to respond to Jones River Watershed Association (JRWA) and Pilgrim Watch (PW)

Request to Reopen, for a Hearing, and to File New Contentions (Request).1 JRWA and PW (collectively Petitioners) filed the Request on May 14, 2012. This Atomic Safety and Licensing Boards (Board) Initial Scheduling Order provides for a fourteen day period to respond to any new or amended contentions in this proceeding.2 Thus, the deadline for a response to the Request would be May 29, 2012.3 For the following reasons, the Staff asks the Board to extend 1

Jones River Watershed Association (JRWA) and Pilgrim Watch (PW) Request to Reopen, for a Hearing, and to File New Contentions and JRWA Motion to Intervene On Issues Of: (1) Violations of State and Federal Clean Water Laws; (2) Lack of Valid State § 401 Water Quality Certification; (3) Violation of State Coastal Zone Management Policy; and (4) Violation o NEPA (May 14, 2012).

2 Order (Establishing Schedule for Proceeding and Addressing Related Matters), at 7 (Dec. 20, 2006) (Agencywide Documents Access and Management System (ADAMS) Accession No. ML063540494) (Initial Scheduling Order).

3 May 28, 2012, is a government holiday, Memorial Day.

the fourteen day period for filing responses to new or amended contentions to twenty-five days.

1. The Boards Initial Scheduling Order provides for a fourteen day period to respond to new or amended contentions.4 NRC regulations normally provide for a twenty-five day response period for answers to new or amended contentions.5 In other proceedings, Boards have adopted a twenty-five day response period.6
2. Two of the Staffs Attorneys assigned to this proceeding have vacations scheduled during the fourteen-day response period provided for by the Boards order.
3. In accordance with 10 C.F.R. § 2.323(b), Staff counsel contacted counsel for Entergy and JRWA and the representative of PW regarding this motion. Entergy did not oppose the extension. JRWA and PW provided the following reply:

JRWA and PW will not oppose the request, subject to the caveat that its assent shall not be construed in any way to mean that JRWA and PW support the NRC staff and EDO position that Pilgrim can be issued a new 20 operating license before all of the outstanding contentions and legal appeals are fully litigated to their conclusion. JRWA states this position due to the fact that the staff NRC supported the EDO request to the NRC Commission to relicense Pilgrim by May 8, 2012, despite outstanding contentions and legal appeals. By agreeing to the extension for replying to our May 14, 2012 petition, to a date that will extend the time for JRWA's & PWs reply brief to after the June 8, 2012 licensing deadline, we are not agreeing in any way that Pilgrim can be issued a new operating license on June 8, 2012 while contentions are pending.

Therefore, neither the applicant nor PW and JRWA oppose the extension request.

4 Initial Scheduling Order at 7.

5 10 C.F.R. § 2.309(h)(1).

6 Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Units 2 and 3),

Memorandum and Order (Summarizing Pre-hearing Conference), at 5 (Feb. 4, 2009) (ADAMS Accession No. ML090350569); Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc.

(Vermont Yankee Nuclear Power Station), Initial Scheduling Order, at 6 (Nov. 17, 2006) (ADAMS Accession No. ML063210212).

Wherefore, the Staff respectfully requests that the Board extend the period of time for responding to the Request from fourteen to twenty-five days.

Respectfully submitted,

/Signed (electronically) by/

Maxwell C. Smith Counsel for NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O-15D21 Washington, DC 20555-0001 (301) 415-1246 Maxwell.Smith@nrc.gov Dated at Rockville, Maryland this 15th day of May 2012

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

ENTERGY NUCLEAR GENERATION )

COMPANY AND ENTERGY NUCLEAR ) Docket No. 50-293-LR OPERATIONS, INC. )

)

(Pilgrim Nuclear Generating Station) )

CERTIFICATE OF SERVICE I hereby certify that copies of the NRC STAFFS UNOPPOSED MOTION FOR AN EXTENSION OF TIME TO RESPOND TO JONES RIVER WATERSHED ASSOCIATION AND PILGRIM WATCHS MAY 14, 2012 REQUEST TO REOPEN, FOR A HEARING AND TO FILE NEW CONTENTIONS have been served upon the following by the Electronic Information Exchange this 15th day of May, 2012:

Administrative Judge Administrative Judge Richard F. Cole Paul B. Abramson Atomic Safety and Licensing Board Atomic Safety and Licensing Board Mail Stop: T-3F23 Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 E-mail: Richard.Cole@nrc.gov E-mail: Paul.Abramson@nrc.gov Administrative Judge Office of Commission Appellate Ann Marshall Young, Chair Adjudication Atomic Safety and Licensing Board Mail Stop: O-16G4 Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 E-mail:

E-mail: Ann.Young@nrc.gov Atomic Safety and Licensing Board Office of the Secretary Mail Stop: T-3F23 Attn: Rulemakings and Adjudications Staff U.S. Nuclear Regulatory Commission Mail Stop: O-16G4 Washington, DC 20555-0001 U.S. Nuclear Regulatory Commission (VIA INTERNAL MAIL ONLY) Washington, DC 20555-0001 E-mail: Hearing.Docket@nrc.gov Sheila Slocum Hollis Terence A. Burke, Esq.

Duane Morris LLP Entergy Nuclear 505 9th St., NW, Suite 1000 1340 Echelon Parkway Washington, DC 20004 Mail Stop: M-ECH-62 E-mail: sshollis@duanemorris.com Jackson, MS 39213 E-mail: tburke@entergy.com

Mary Lampert David R. Lewis, Esq.

148 Washington Street Paul A. Gaukler, Esq.

Duxbury, MA 02332 Pillsbury, Winthrop, Shaw, Pittman, LLP E- mail: mary.lampert@comcast.net 2300 N Street, NW Washington, DC 20037-1137 E-mail: david.lewis@pillsburylaw.com paul.gaukler@pillsburylaw.com Chief Kevin M. Nord Town Manager Fire Chief & Director Duxbury Emergency Town of Plymouth Management Agency 11 Lincoln St.

668 Tremont Street Plymouth, MA 02360 Duxbury, MA 02332 E-mail: marrighi@townhall.plymouth.ma.us E-mail: nord@town.duxbury.ma.us Richard R. MacDonald Matthew Brock Town Manager Assistant Attorney General 878 Tremont Street Commonwealth of Massachusetts Duxbury, MA 02332 One Ashburton Place E-mail: macdonald@town.duxbury.ma.us Boston, MA 02108 Martha.Coakley@state.ma.us Margaret Sheehan Matthew.Brock@state.ma.us 61 Grozier Road Cambridge, MA 02138 Anne Bingham E-mail : meg@ecolaw.biz 78A Cedar St.

Sharon, MA 02067 Email:annebinghamlaw@comcast.net

/Signed (electronically) by/

Maxwell C. Smith Counsel for NRC Staff Dated at Rockville, Maryland this 15th Day of May 2012