|
---|
Category:Letter
MONTHYEARML24298A0552024-10-30030 October 2024 Response to Alternative RR-10, Auxiliary Feedwater Valve Testing IR 05000282/20244032024-10-25025 October 2024 – Security Baseline Inspection Report 05000282/2024403 and 05000306/2024403 05000282/LER-2024-001-01, Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies2024-10-22022 October 2024 Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies L-PI-24-044, Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program2024-10-21021 October 2024 Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program ML24277A1012024-10-0303 October 2024 Closure of Interim Report of a Potential Deviation or Failure to Comply Associated with Bentley Systems Incorporated Autopipe Software ML24221A3622024-09-27027 September 2024 Issuance of Amendment Nos. 245 and 233 Revise Technical Specification 3.8.1, AC Sources-Operating, Surveillance Requirement 3.8.1.2, Note 3 ML24241A1682024-09-23023 September 2024 Transmittal Letter Amendment No. 13 to Materials License No. Special Nuclear Material-2506 for the Prairie Island Independent Spent Fuel Storage Installation 05000282/LER-2024-001, Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies2024-09-16016 September 2024 Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies IR 05000282/20243012024-09-13013 September 2024 NRC Initial License Examination Report 05000282/2024301 and 05000306/2024301 IR 05000282/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Prairie Island Nuclear Generating Plant, Units 1 and 2 (Report 05000282/2024005 and 05000306/2024005) L-PI-24-040, Post-Submittal Package Letter2024-08-23023 August 2024 Post-Submittal Package Letter IR 05000282/20245012024-08-0505 August 2024 Emergency Preparedness Inspection Report 05000282/2024501 and 05000306/2024501 ML24213A1592024-07-31031 July 2024 Operator Licensing Examination Approval - Prairie Island Nuclear Generating Plant IR 05000282/20240022024-07-30030 July 2024 Integrated Inspection Report 05000282/2024002 and 05000306/2024002 ML24208A1502024-07-26026 July 2024 Independent Spent Fuel Storage Installation - Submittal of Quality Assurance Topical Report (NSPM-1) ML24197A2012024-07-15015 July 2024 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000282/2024004 IR 05000282/20240102024-06-28028 June 2024 Comprehensive Engineering Team Inspection Report 05000282/2024010 and 05000306/2024010 L-PI-24-036, – Preparation and Scheduling of Operator Licensing Examinations2024-06-28028 June 2024 – Preparation and Scheduling of Operator Licensing Examinations ML24158A5912024-06-0606 June 2024 CFR 50.46 LOCA Annual Report L-PI-24-031, Independent Spent Fuel Storage Installation, Supplement to License Amendment Request to Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2)2024-06-0505 June 2024 Independent Spent Fuel Storage Installation, Supplement to License Amendment Request to Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2) L-PI-24-014, License Amendment Request to Revise the Technical Specification Definition of Reactor Trip System (RTS) Response Time and Apply Response Time Testing to RTS Trip Functions with Time Delay Assumption2024-06-0303 June 2024 License Amendment Request to Revise the Technical Specification Definition of Reactor Trip System (RTS) Response Time and Apply Response Time Testing to RTS Trip Functions with Time Delay Assumption 05000306/LER-2024-001-01, Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to Loss of Suction to the 22 Main Feedwater Pump2024-05-31031 May 2024 Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to Loss of Suction to the 22 Main Feedwater Pump ML24155A1922024-05-31031 May 2024 Refueling Outage Unit 2 R33 Owners Activity Report for Class 1, 2, 3 and Mc Inservice Inspections ML24262A1992024-05-29029 May 2024 L-PI-24-018 PINGP 75 Day Letter ML24149A3712024-05-29029 May 2024 (Ping) - Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection L-PI-24-030, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.8.12024-05-22022 May 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.8.1 ML24141A1292024-05-22022 May 2024 Northern States Power Company - Use of Encryption Software for Electronic Transmission of Safeguards Information ML24141A0452024-05-20020 May 2024 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML24128A2572024-05-16016 May 2024 ISFSI A13 Acceptance Letter IR 05000282/20240012024-05-15015 May 2024 Integrated Inspection Report 05000282/2024001 and 05000306/2024001 ML24130A2362024-05-0909 May 2024 Independent Spent Fuel Storage Installation - 2023 Annual Radiological Environmental Monitoring Program Report ML24130A2392024-05-0909 May 2024 2023 Annual Radioactive Effluent Report ML24071A1162024-05-0101 May 2024 Issuance of Amendment Nos. 244 and 232 Revise TS 3.7.8, Cooling Water (Cl) System ML24128A0882024-04-30030 April 2024 Submittal of Updated Safety Analysis Report (Usar), Revision 38 05000306/LER-2024-001, Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to Loss of Suction to the 22 Main Feedwater Pump2024-04-29029 April 2024 Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to Loss of Suction to the 22 Main Feedwater Pump ML24089A2382024-04-29029 April 2024 Summary of Nuclear Property Insurance IR 05000282/20244012024-04-25025 April 2024 – Security Baseline Inspection Report 05000282/2024401 and 05000306/2024401 ML24100A8042024-04-24024 April 2024 – Alternative Request RR-09 for Safety Injection and Volume Control System Category C Check Valve Inservice Testing ML24114A0882024-04-23023 April 2024 Annual Report of Individual Monitoring for the Prairie Island Nuclear Generating Plant (PINGP) ML24113A1182024-04-12012 April 2024 NRC Letter Re NRC Office of Investigations Report No. 3-2023-004 ML24100A1212024-04-0909 April 2024 Submittal of Revised Pressure and Temperature Limits Report ML24093A2832024-04-0202 April 2024 Nuclear Material Transaction Report L-PI-24-012, Independent Spent Fuel Storage Installation - License Amendment Request: Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2)2024-04-0202 April 2024 Independent Spent Fuel Storage Installation - License Amendment Request: Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2) ML24089A2402024-03-29029 March 2024 Guarantee of Payment of Deferred Premiums ML24060A1232024-03-27027 March 2024 To Request 1-RR-5-10 and 2-RR-5-10 Regarding Reactor Pressure Vessel Welds and Nozzle Welds 05000282/LER-2023-001-01, Reactor Trip, Auxiliary Feedwater and Emergency Service Water System Actuation Due to Electrical Transient in DC Control Power Cables2024-03-21021 March 2024 Reactor Trip, Auxiliary Feedwater and Emergency Service Water System Actuation Due to Electrical Transient in DC Control Power Cables ML24262A1512024-03-15015 March 2024 L-PI-24-011 150 Day Letter 2024 PINGP ILT NRC Exam ML24010A0582024-03-0505 March 2024 Amendment No. 12 to Materials License No. Special Nuclear Material-2506 for the Prairie Island Independent Spent Fuel Storage Installation L-PI-24-004, Independent Spent Fuel Storage Installation - Annual Effluent Report, January Through December 20232024-02-29029 February 2024 Independent Spent Fuel Storage Installation - Annual Effluent Report, January Through December 2023 IR 05000282/20230062024-02-28028 February 2024 Annual Assessment Letter for Prairie Island Nuclear Generating Plant, Units 1 and 2 (Report 05000282/2023006 and 05000306/2023006) 2024-09-27
[Table view] Category:License-Operator
MONTHYEARML24262A2142024-09-18018 September 2024 Form 5.1-1 Post Examination Check Sheet (PI 2024) IR 05000282/20243012024-09-13013 September 2024 NRC Initial License Examination Report 05000282/2024301 and 05000306/2024301 ML24262A2132024-09-0606 September 2024 Form 2.1-1 Examination Preparation Checklist (PI 2024) L-PI-24-040, Post-Submittal Package Letter2024-08-23023 August 2024 Post-Submittal Package Letter ML24262A2122024-08-23023 August 2024 Form 1.3-1 Exam Security Agreement ML24213A1592024-07-31031 July 2024 Operator Licensing Examination Approval - Prairie Island Nuclear Generating Plant ML24262A2012024-07-24024 July 2024 Form 2.3-4 Written Examination Quality Checklist ML24262A2002024-07-24024 July 2024 Form 2.3-2 Operating Test Quality Checklist ML24262A1522024-07-24024 July 2024 Form 2.3-1 Examination Outline Quality Checklist ML24262A1532024-07-24024 July 2024 Form 3.4-1 Scenario Events & Evolutions Checklist ML24262A1992024-05-29029 May 2024 L-PI-24-018 PINGP 75 Day Letter ML24262A1512024-03-15015 March 2024 L-PI-24-011 150 Day Letter 2024 PINGP ILT NRC Exam ML24017A0182024-01-19019 January 2024 Confirmation of Initial License Examination ML22270A2372022-09-26026 September 2022 Form 5.1-1 Post Exam Checklist IR 05000282/20223012022-08-31031 August 2022 NRC Initial License Examination Report 05000282/2022301; 05000306/2022301 ML22249A0062022-08-26026 August 2022 2.1-1 Examination Preparation Checklist for Prairie Island 08092022 ML22243A2142022-08-26026 August 2022 Form 2.3-3 Operating Test Review Worksheet for Prairie Island 2022 Post OV Resubmittal Comments Final Copy ML22243A2192022-08-26026 August 2022 2.3-5 - Written Examination Review Worksheet 08122022 ML22270A2252022-08-26026 August 2022 Ile Security Agreement - Final ML22243A2212022-08-26026 August 2022 NRC Comments and Resolution on PINGP Outline - Final ML22249A0072022-08-19019 August 2022 Ile 2022 Post Exam Comments Letter ML22237A1582022-08-19019 August 2022 Ile Administered Written Exam RO and SRO Final ML22236A6622022-08-19019 August 2022 Ile Administered Walkthrough Portion JPMs RO and SRO ML22236A5132022-08-19019 August 2022 Ile 3.2-2 ML22236A5082022-08-19019 August 2022 Ile 3.2-1 ML22236A6662022-08-19019 August 2022 Ile Administered Dynamic Simulator Scenarios ML22236A5152022-08-19019 August 2022 Ile 3.3-1 ML22236A5162022-08-19019 August 2022 Ile 4.1 PWR and Common ML22237A2932022-08-0808 August 2022 Ile Proposed RO SRO Written Exam ML22237A3022022-08-0808 August 2022 Ile 2.3-2 ML22237A2862022-08-0808 August 2022 Ile Proposed Operating Test - Dynamic Simulator Scenarios ML22213A1852022-08-0808 August 2022 Plan, Operator Licensing Examination Approval ML22237A2822022-08-0808 August 2022 Ile Proposed Operating Test - Walkthrough Portion JPMs RO and SRO ML22237A3032022-08-0808 August 2022 Ile 2.3-4 ML22166A3892022-07-28028 July 2022 Issuance of Amendments 239 and 227 24-Month Operating Cycle ML22174A3902022-06-27027 June 2022 Licensed Operator Positive Fitness-For-Duty Test ML22237A3012022-05-27027 May 2022 Ile Licensee Letter Transmitting Proposed Exam and Test ML22242A3072022-03-24024 March 2022 3.4-1 Scenario Events & Evolutions Checklist RO & SRO ML22242A3032022-03-24024 March 2022 2.3-1 Exam Outline Quality Checklist ML22027A8012022-01-27027 January 2022 Confirmation of Initial License Examination ML21121A0002021-04-27027 April 2021 Preparation and Scheduling of Operator Licensing Examinations ML21110A5922021-04-19019 April 2021 GFE Results, March 2021 ML21082A4892021-03-23023 March 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information IR 05000282/20203012020-09-22022 September 2020 NRC Initial License Examination Report 05000282/2020301 and 05000306/2020301 L-PI-20-048, Post Exam Comments2020-09-21021 September 2020 Post Exam Comments ML20265A1722020-09-21021 September 2020 ES-201-1 ML20265A1802020-09-21021 September 2020 ES-403-1 L-PI-20-053, ES-201-32020-09-18018 September 2020 ES-201-3 ML20245E5482020-08-27027 August 2020 ES-D-1, Scenario Outline ML20246G7322020-08-27027 August 2020 Ile As-Administered Simulator JPMs 2024-09-06
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24262A2142024-09-18018 September 2024 Form 5.1-1 Post Examination Check Sheet (PI 2024) IR 05000282/20243012024-09-13013 September 2024 NRC Initial License Examination Report 05000282/2024301 and 05000306/2024301 ML24262A2132024-09-0606 September 2024 Form 2.1-1 Examination Preparation Checklist (PI 2024) L-PI-24-040, Post-Submittal Package Letter2024-08-23023 August 2024 Post-Submittal Package Letter ML24262A2122024-08-23023 August 2024 Form 1.3-1 Exam Security Agreement ML24213A1592024-07-31031 July 2024 Operator Licensing Examination Approval - Prairie Island Nuclear Generating Plant ML24262A2012024-07-24024 July 2024 Form 2.3-4 Written Examination Quality Checklist ML24262A1522024-07-24024 July 2024 Form 2.3-1 Examination Outline Quality Checklist ML24262A1532024-07-24024 July 2024 Form 3.4-1 Scenario Events & Evolutions Checklist ML24262A2002024-07-24024 July 2024 Form 2.3-2 Operating Test Quality Checklist ML24262A1992024-05-29029 May 2024 L-PI-24-018 PINGP 75 Day Letter ML24262A1512024-03-15015 March 2024 L-PI-24-011 150 Day Letter 2024 PINGP ILT NRC Exam ML24017A0182024-01-19019 January 2024 Confirmation of Initial License Examination ML22270A2372022-09-26026 September 2022 Form 5.1-1 Post Exam Checklist IR 05000282/20223012022-08-31031 August 2022 NRC Initial License Examination Report 05000282/2022301; 05000306/2022301 ML22243A2192022-08-26026 August 2022 2.3-5 - Written Examination Review Worksheet 08122022 ML22249A0062022-08-26026 August 2022 2.1-1 Examination Preparation Checklist for Prairie Island 08092022 ML22270A2252022-08-26026 August 2022 Ile Security Agreement - Final ML22243A2212022-08-26026 August 2022 NRC Comments and Resolution on PINGP Outline - Final ML22243A2142022-08-26026 August 2022 Form 2.3-3 Operating Test Review Worksheet for Prairie Island 2022 Post OV Resubmittal Comments Final Copy ML22236A5082022-08-19019 August 2022 Ile 3.2-1 ML22236A5152022-08-19019 August 2022 Ile 3.3-1 ML22236A5132022-08-19019 August 2022 Ile 3.2-2 ML22236A6662022-08-19019 August 2022 Ile Administered Dynamic Simulator Scenarios ML22236A5162022-08-19019 August 2022 Ile 4.1 PWR and Common ML22249A0072022-08-19019 August 2022 Ile 2022 Post Exam Comments Letter ML22236A6622022-08-19019 August 2022 Ile Administered Walkthrough Portion JPMs RO and SRO ML22237A1582022-08-19019 August 2022 Ile Administered Written Exam RO and SRO Final ML22237A2862022-08-0808 August 2022 Ile Proposed Operating Test - Dynamic Simulator Scenarios ML22237A2822022-08-0808 August 2022 Ile Proposed Operating Test - Walkthrough Portion JPMs RO and SRO ML22237A2932022-08-0808 August 2022 Ile Proposed RO SRO Written Exam ML22237A3032022-08-0808 August 2022 Ile 2.3-4 ML22213A1852022-08-0808 August 2022 Plan, Operator Licensing Examination Approval ML22237A3022022-08-0808 August 2022 Ile 2.3-2 ML22237A3012022-05-27027 May 2022 Ile Licensee Letter Transmitting Proposed Exam and Test ML22242A3032022-03-24024 March 2022 2.3-1 Exam Outline Quality Checklist ML22242A3072022-03-24024 March 2022 3.4-1 Scenario Events & Evolutions Checklist RO & SRO ML22027A8012022-01-27027 January 2022 Confirmation of Initial License Examination ML21121A0002021-04-27027 April 2021 Preparation and Scheduling of Operator Licensing Examinations ML21082A4892021-03-23023 March 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information IR 05000282/20203012020-09-22022 September 2020 NRC Initial License Examination Report 05000282/2020301 and 05000306/2020301 L-PI-20-048, Post Exam Comments2020-09-21021 September 2020 Post Exam Comments ML20265A1802020-09-21021 September 2020 ES-403-1 ML20265A1722020-09-21021 September 2020 ES-201-1 L-PI-20-053, ES-201-32020-09-18018 September 2020 ES-201-3 ML20245E5802020-08-27027 August 2020 75 Day Letter ML20245E5792020-08-27027 August 2020 ES-301-6 ML20258A0162020-08-27027 August 2020 ES-401-6 ML20245E5812020-08-27027 August 2020 ES-301-5, Transient and Event Checklist ML20245E5662020-08-27027 August 2020 ES-401-6 2024-09-06
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 May 10, 2012 Mr. Mark A. Schimmel Site Vice President Prairie Island Nuclear Generating Plant Northern States Power Company, Minnesota 1717 Wakonade Drive East Welch, MN 55089
SUBJECT:
OPERATOR LICENSING EXAMINATION APPROVAL
Dear Mr. Schimmel:
The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at the Prairie Island Nuclear Generating Station.
The U. S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications in connection with this examination and separately provided a list of approved applicants to Mr. Andrew Pullam, Training Director. Note that any examination waivers and application denials have been addressed in separate correspondence.
The NRC will administer the written examinations and operating tests in accordance with Revision 9, Supplement 1, of NUREG-1021, Operator Licensing Examination Standards for Power Reactors, during the weeks of May 14 and 21, 2012. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. If you determine that this examination is not appropriate for licensing operators at your facility, please contact me at 630-829-9731.
Please contact your Chief Examiner, Dell McNeil, at 630-829-9737, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access
M. Schimmel and Management System (ADAMS), accessible from the Electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.
Sincerely,
/RA/
Charles Phillips, Acting Chief Operations Branch Division of Reactor Safety Docket Nos. 50-282 and 50-306 License Nos. DPR-42 and DPR-60 cc w/encl: Distribution via ListServ TM
M. Schimmel and Management System (ADAMS), accessible from the Electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.
Sincerely,
/RA/
Charles Phillips, Acting Chief Operations Branch Division of Reactor Safety Docket Nos. 50-282 and 50-306 License Nos. DPR-42 and DPR-60 cc w/encl: Distribution via ListServ TM DISTRIBUTION See next page DOCUMENT NAME: Ltr 05__12 Prairie Island Exam Approval.docx To receive a copy of this document, indicate in the box "C" = Copy w/o attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII:DRS Y RIII:DRS N RIII:DRS N NAME JKweiser: DMcNeil: CPhillips:
DATE 05/10/12 05/10/12 05/10/12 OFFICIAL RECORD COPY
Letter to Mr. Mark A. Schimmel from Mr. Charles Phillips dated May 10, 2012
SUBJECT:
OPERATOR LICENSING EXAMINATION APPROVAL DISTRIBUTION:
Shawn Williams RidsNrrPMPrairieIsland Resource RidsNrrDorlLpl3-1 Resource RidsNrrDirsIrib Resource Chuck Casto Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak John McHale, NRR Janet Kweiser, DRS