ML12135A619

From kanterella
Jump to navigation Jump to search
Notice of Meeting with Tennessee Valley Authority to Discuss Current Licensing Basis for Hydrology at Watts Bar Nuclear Plant, Unit 1
ML12135A619
Person / Time
Site: Watts Bar, Sequoyah  Tennessee Valley Authority icon.png
Issue date: 05/17/2012
From: Lyon C
Watts Bar Special Projects Branch
To: Shawn Campbell
Watts Bar Special Projects Branch
Poole J
References
Download: ML12135A619 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 M:iy 17, 2012 MEMORANDUM TO: Stephen J. Campbell, Chief Watts Bar Special Projects Branch Division of Operating Reactor Licensing FROM: Carl F. Lyon, Project Manager (l~

Watts Bar Special Projects Branch ,-",- cr .

Division of Operating Reactor Licensing

SUBJECT:

FORTHCOMING MEETING WITH TENNESSEE VALLEY AUTHORITY (TVA)

DATE & TIME: Thursday, May 31, 2012 1:00 p.m. - 2:30 p.m.

PURPOSE: This is a public meeting between NRC and TVA senior management regarding the flooding/hydrology licensing basis at Watts Bar Nuclear Plant. Unit 1, and Sequoyah Nuclear Plant.

LOCATION: U.S. Nuclear Regulatory Commission (NRC)

One White Flint North Room 013-B04 11555 Rockville Pike, Rockville. Maryland CATEGORY 1:* This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.

PARTICIPANTS: Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR) and Region II (RII).

NRC TVA E. Leeds. NRR F. Lyon, NRR D. Jernigan M. Evans, NRR J. Poole. NRR R. Whalen A. Howe, NRR V. McCree, RII J.Shea S. Campbell. NRR et al. et al.

" Commission's Policy Statement on "Enhancing Public Participation in NRC Meetings' (67 FR 36920). May 28. 2002.

S. Campbell - 2 Interested members of the public can participate in this meeting via a toll-free audio teleconference. Please call one of the meeting contacts listed below before May 29,2012,2:30 p.m.

{Eastern Time} to get the telephone number and the pass code.

MEETING CONTACTS: Fred Lyon, NRR Justin Poole, NRR 301-415-2296 301-415-2048 Fred. Lyon@nrc.gov Justin.Poole@nrc.gov The NRC provides reasonable accommodation to individuals with disabilities where appropriate.

If you need a reasonable accommodation to participate in a meeting, or need a meeting notice or a transcript or other information from a meeting in another format (e.g., Braille, large print),

please notify one of the NRC meeting contacts. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.

To receive a summary of this meeting and begin receiving other plant-specific e-mail distributions, you must subscribe to the Operating Reactor Correspondence electronic distribution for this plant via http://www.nrc.gov/public-involve/listserver/plants-by-region.html.

Once subscribed, if you wish to discontinue receiving electronic distribution, you may unsubscribe at any time by visiting the same web address above.

Docket Nos. 50-390, 50-327, and 50-328

Enclosure:

Agenda cc w/encl: Distribution via Listserv

AGENDA u.s. NUCLEAR REGULATORY COMMISSION (NRC) MEETING WITH TENNESSEE VALLEY AUTHORITY (TVA)

REGARDING WATTS BAR NUCLEAR PLANT, UNIT 1, AND SEOUOYAH NUCLEAR PLANT HYDROLOGY/FLOODING LICENSING BASIS May 31,2012 1:00 p.m. -1:10 p.m. Introductions (NRC) 1:10 p.m. -2:20 p.m. NRC and TVA Senior Management discussion of issues regarding the licensing basis for hydrology/flooding at Watts Bar Nuclear Plant (WBN), Unit 1, and Sequoyah Nuclear Plant (SON),

including:

1. The current status of work completed to resolve hydrology issues at WBN and SON, including discussion of:

A. The bounding flooding levels at WBN and SON.

B. Compensatory measures.

C. Discussion of sand baskets in place at selected dams

2. TVA's plans and schedule for accomplishing remaining work to resolve hydrology issues at WBN and SON.

A. Plans and schedule to submit licensing action requests to update the licensing basis for WBN* and SON.

B. Plans to implement permanent modifications at SON and WBN.

3. Coordination with Fukushima SO.S4(f) letter response.

2:20 p.m. - 2:30 p.m. Public Comments

Enclosure

S. Campbell -2 Interested members of the public can participate in this meeting via a toll-free audio teleconference. Please call one of the meeting contacts listed below before May 29.2012.2:30 p.m.

(Eastern Time) to get the telephone number and the pass code.

MEETING CONTACTS: Fred Lyon, NRR Justin Poole, NRR 301-415-2296 301-415-2048 Fred.Lyon@nrc.gov Justin. Poole@nrc.gov The NRC provides reasonable accommodation to individuals with disabilities where appropriate.

If you need a reasonable accommodation to participate in a meeting, or need a meeting notice or a transcript or other information from a meeting in another format (e.g., Braille, large print),

please notify one of the NRC meeting contacts. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.

To receive a summary of this meeting and begin receiving other plant-specific e-mail distributions, you must subscribe to the Operating Reactor Correspondence electronic distribution for this plant via http://www.nrc.gov/public-involve/listserver/plants-by-region.html.

Once subscribed, if you wish to discontinue receiving electronic distribution, you may unsubscribe at any time by visiting the same web address above.

Docket Nos. 50-390, 50-327, and 50-328

Enclosure:

Agenda cc w/encl: Distribution via Listserv DISTRIBUTION:

PUBLIC RidsRgn2MailCenter Resource LPWB R/F PMNS Resources RidsNrrLABClayton (Hard copy) CSteger. NRR RidsNrrPMWattsBar1 Resource RidsAcrsAcnw_MailCTR Resource MKotzalas, EDO RidsNrrDorlLp_WB Resource RidsOgcMailCenter Resource RidsNrrOd Resource RidsNrrDorl Resource RidsOpaMail Resource RHanna, RII Receptionist (OWFN and TWFN) JLedford. RII RidsNrrDorlLpl2-2 RidsNrrPMSequoyah Resource ADAM SA ccesslon No. ML12135A619 **Prevlously concurre d OFFICE DORULPWB/PM DORULPWB/LA DORULPL2-2/BC DORULPWB/BC NAME FLyon BClayton** DBroaddus SCampbell DATE 5/16/12 5/16/12 5/17112 5/17112 OFFICIAL RECORD COPY