MONTHYEARML24290A0442024-10-15015 October 2024 NRR E-mail Capture - (External_Sender) Psl Monthly Turtle Report for September 2024 ML24281A1592024-10-0707 October 2024 Acceptance Review for FPL LAR - St. Lucie Unit 2 - Fuel Methodology Changes in Support of Transition to 24- Month Fuel Cycles ML24254A2562024-09-0606 September 2024 NRR E-mail Capture - (External_Sender) Psl Monthly Turtle Report for August 2024 ML24248A2422024-09-0404 September 2024 Acceptance Review for St. Lucie, Unit 2 - Relief Request (RR) 14: Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval ML24246A0152024-08-12012 August 2024 NRR E-mail Capture - (External_Sender) Psl Monthly Turtle Report for July 2024 ML24194A1222024-07-11011 July 2024 NRR E-mail Capture - (External_Sender) Psl Monthly Turtle Report for June 2024 ML24192A2302024-07-10010 July 2024 003 Radiation Safety Baseline Inspection Information Request ML24176A1612024-06-15015 June 2024 NRR E-mail Capture - (External_Sender) May 2024 FPL Marine Turtle Removal Monthly Report ML24150A2192024-05-29029 May 2024 (E-Mail) St. Lucie, Unit 2 - License Amendment Request, Updated Spent Fuel Pool Criticality Analysis - Acceptance Review ML24149A3532024-05-24024 May 2024 Change in Estimated Review Schedule for Nextera Common Emergency Plan Amendment ML24134A0142024-05-10010 May 2024 NRR E-mail Capture - (External_Sender) Pasl Monthly Turtle Report for April 2024 ML24122C6922024-05-0101 May 2024 NextEra Fleet EP Amendment - Demonstration Drill ML24113A0372024-04-22022 April 2024 NRR E-mail Capture - Acceptance Review - Turkey Point 3 and 4 and St. Lucie 2 - Request to Use Later Code of ASME (L-2024-LLR-0024) ML24101A2202024-04-0808 April 2024 NRR E-mail Capture - (External_Sender) Psl Monthly Turtle Report for March 2024 ML24074A4262024-03-12012 March 2024 NRR E-mail Capture - (External_Sender) Psl Monthly Turtle Report for February 2024 ML24177A2512024-02-12012 February 2024 Acceptance Review for RR 7-Proposed Alternative - Extension of Inspection Interval for St. Lucie Unit 1 Reactor Pressure Vessel Welds from 10 to 20 Years ML24036A2152024-02-0505 February 2024 NRR E-mail Capture - (External_Sender) Psl Monthly Turtle Report for January 2024 ML24031A5472024-01-13013 January 2024 NRR E-mail Capture - (External_Sender) December 2023 FPL Marine Turtle Removal Monthly Report ML24002A7272023-12-16016 December 2023 NRR E-mail Capture - (External_Sender) November 2023 FPL Marine Turtle Removal Monthly Report ML23332A0352023-11-27027 November 2023 – Conversion to Improved Technical Specifications Change in Estimated Review Schedule ML23326A0252023-11-20020 November 2023 NRR E-mail Capture - (External_Sender) October 2023 FPL Marine Turtle Removal Monthly Report ML24008A1582023-11-14014 November 2023 NRR E-mail Capture - (External_Sender) Psl Monthly Turtle Report for October 2023 ML23254A2852023-09-11011 September 2023 NRR E-mail Capture - (External_Sender) August 2023 FPL Marine Turtle Removal Monthly Report ML23243A9862023-08-31031 August 2023 NRR E-mail Capture - Draft RAIs for EP Staff Augmentation Times LAR (L-2022-LLA-0166) ML23243A9182023-08-31031 August 2023 NRR E-mail Capture - Re Audit Plan - St. Lucie ITS Conversion LAR - Setpoints ML23228A1482023-08-16016 August 2023 NRR E-mail Capture - Acceptance Review Results - St. Lucie Nuclear Plant, Unit 2 Alternative PSL2-I5-RR-01 (L-2023-LLR-0038) ML23226A0762023-08-14014 August 2023 NRR E-mail Capture - Request for Additional Information - St. Lucie Plant, Units 1 and 2 - Adopt 10 CFR 50.69 (L-2022-LLA-0182) ML23226A0692023-08-12012 August 2023 NRR E-mail Capture - (External_Sender) July 2023 FPL Marine Turtle Removal Monthly Report ML23223A0152023-08-11011 August 2023 NRR E-mail Capture - Acceptance Review Results - St. Lucie Nuclear Plant, Unit 2 Alternative PR-10 (L-2023-LLR-0039) ML23191A1952023-07-10010 July 2023 NRR E-mail Capture - (External_Sender) June 2023 FPL Marine Turtle Removal Monthly Report ML23216A1412023-06-30030 June 2023 August 2023 RP Inspection Document Request ML23248A1292023-06-29029 June 2023 NRR E-mail Capture - St Lucie 50.69 - Additional Audit Questions ML23173A1522023-06-22022 June 2023 Request for Additional Information NextEra Fleet Emergency Plan Amendment Request ML23198A0662023-06-22022 June 2023 NRR E-mail Capture - (External_Sender) Green Turtle Nest on Canal Bank, June 2023 ML23198A0642023-06-12012 June 2023 NRR E-mail Capture - (External_Sender) Loggerhead Nest on Canal Bank, May 2023 ML23163A1732023-06-10010 June 2023 NRR E-mail Capture - (External_Sender) May 2023 FPL Marine Turtle Removal Monthly Report ML23163A1222023-05-30030 May 2023 NRR E-mail Capture - (External_Sender) Nest on Intake Canal Bank ML23138A0212023-05-17017 May 2023 Telephone Record, Call with Florida Power and Light Regarding Decommissioning Funding Plan Update Dated March 30, 2021 ML23137A0942023-05-17017 May 2023 NRR E-mail Capture - Audit Plan - St Lucie Plant, Units 1 and 2 - 10 CFR 50.69 LAR ML23135A0292023-05-12012 May 2023 NRR E-mail Capture - (External_Sender) April 2023 FPL Marine Turtle Removal Monthly Report ML23129A8312023-05-0808 May 2023 NRR E-mail Capture - Audit Plan - St. Lucie ITS Conversion LAR - Setpoints ML23109A1862023-04-19019 April 2023 And Turkey Point – Acceptance of Requested Licensing Action Proposed Alternative to Asme Section XI Authorizing Implementation of Asme Code Case N-752-1 ML23198A1592023-04-0707 April 2023 NRR E-mail Capture - (External_Sender) March 2023 FPL Marine Turtle Removal Monthly Report ML23074A2292023-03-15015 March 2023 NRR E-mail Capture - (External_Sender) February 2023 FPL Marine Turtle Removal Monthly Report ML23041A2262023-02-10010 February 2023 NRR E-mail Capture - (External_Sender) January 2023 FPL Marine Turtle Removal Monthly Report ML23065A1142023-02-0101 February 2023 NRR E-mail Capture - (External_Sender) FPL St. Lucie Plant Biological Opinion SERO-2019-03494 - Submittal ML23254A4022023-01-24024 January 2023 RP Inspection_2023-001_Document Request ML23019A0142023-01-18018 January 2023 NRR E-mail Capture - (External_Sender) Regarding St. Lucie Olive Ridley Capture 1/3/2023 ML23006A1822023-01-0606 January 2023 NRR E-mail Capture - (External_Sender) Psl Smalltooth Sawfish Capture 1/5/23 ML23006A1882023-01-0606 January 2023 NRR E-mail Capture - (External_Sender) December 2022 FPL Marine Turtle Removal Monthly Report 2024-09-06
[Table view] |
Text
From: Stephen Weege To: Meghan Koperski Cc: Dave Niebch; Dave Clark; RidsNrrDlr Resource; Ed Hollowell; Jodie Gless; Ken Frehafer; Mike Bresette; Shelley Norton; Vince Munne
Subject:
April 2012 FPL Marine Turtle Removal Monthly Report Date: Friday, May 04, 2012 5:43:03 PM Attachments: April 2012 Marine Turtle Captures.rtf Monthly Report Notes 2012.xls FPL St. Lucie Capture Summary 2012.xls Mrs. Meghan Koperski Tequesta Field Laboratory 19100 SE Federal Highway Tequesta, FL 33469
Subject:
Marine Turtle Removal Monthly Summary April 2012
Dear Meghan,
Attached, please find the monthly summary of marine turtle removals for April 2012. This month, we captured twenty nine (29) Caretta caretta, nine (9) Chelonia mydas, and one (1)
Dermochelys coriacea in the intake canal of the St. Lucie power plant on Hutchinson Island.
Three loggerhead sea turtles were sent for rehabilitation and there were no mortalities in the month of April.
On April 1st, a subadult loggerhead was proactively captured with a dip net and removed from the intake canal. The turtle was underweight and lethargic. Bone was exposed from scutes sloughing from the carapace in two places (not fresh scrapes) and 5% of the posterior carapace was missing from an old healed injury. The animal also had heavy epibiont coverage. After consultation with the Florida Fish & Wildlife Conservation Commission (FWC), the turtle was transported to the Loggerhead Marine Life Center (LMC) in Juno Beach for rehabilitation by LMC staff. This incident was not considered causal to FPL operations.
On April 9th , a second subadult loggerhead sea turtle was recovered from the surface of the temporary 5-inch barrier net in the morning. The turtle was severely emaciated and lethargic. The eyes were sunken in and heartbeat was easily visible externally. The animal appeared to be in a moribund state. The turtle was missing up to 15% from each front flipper from an apparent old healed injury and also had a heavy epibiont load. After consultation with FWC, Inwater Research Group (IRG) biologists transported the turtle to the Marinelife Center. This incident was not considered causal to FPL operations.
On April 11th , a third subadult loggerhead turtle was recovered floating at the waters surface near the temporary barrier net. The perimeter of the carapace was broken at the right anterior margin and necrotic tissue was exposed (14cm x 6cm wound). Broken bone was exposed by the opening into the body cavity and the animal was lethargic and underweight. The scutes were also sloughing off. The turtle was transported by the FWC sea turtle stranding coordinator to LMC in Juno Beach for rehabilitation. This incident was not considered causal to FPL operations.
Throughout the month, the 5 barrier net experienced light to moderate loads of algae that entered into the intake canal, whereas jellyfish entrainment was negligible. The temporary barrier net has performed as designed and no turtles have been observed beyond the 5-inch net. To date, Florida Power & Light and Morgan & Eklund, Inc. continue to work together on the installation of a permanent 5-inch barrier net.
The tag numbers and morphometric data for all turtles are attached. Also included is a spreadsheet for all captures, mortalities, injuries, and causal events delineated by species and by month for 2012. This spreadsheet also tracks fresh scrapes incurred on captured turtles for the current month, as well as the entire year.
Please feel free to contact me with any questions.
Sincerely, Steve Steve Weege Sr. Environmental Specialist Inwater Research Group, Inc.