ML12131A088

From kanterella
Jump to navigation Jump to search
April 25, 2012 Annual Assessment (Aam) Meeting Summary
ML12131A088
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 05/09/2012
From: Paul Krohn
Reactor Projects Region 1 Branch 4
To:
KROHN, PG
References
Download: ML12131A088 (2)


Text

May 9, 2012 MEETING

SUMMARY

LICENSEE: EXELON GENERATION CO., LLC.

FACILITY: PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3

SUBJECT:

SUMMARY

OF APRIL 25, 2012 ANNUAL ASSESSMENT MEETING AND OPEN HOUSE On April 25, from 6:00 pm to 8:00 pm, the NRC conducted a public meeting and open house at the Peach Bottom Inn in Delta, PA. The NRC conducted the Annual Assessment Meeting to discuss the NRCs assessment of the safety performance of the Peach Bottom Atomic Power Station for 2011.

A notice of the meeting and agenda was issued on April 25, and was posted on the NRCs external (public) web page (ADAMS Accession No. ML12116A081).

The NRC presented poster boards and handouts, met with members of the public, answered questions and listened to statements from members of the public, and were available to discuss its assessment of the safety performance of Peach Bottom Units 2 and 3 for the period of January 1 through December 31, 2011, as documented in our letter dated March 5, 2012 (ADAMS Accession No. ML12060A130). The NRC poster boards presented included background on the Reactor Oversight Process (ROP). Additional information relative to the NRC's Annual Assessment Process and the safety performance of Peach Bottom Units 2 and 3 can be found on the NRC's web site at: www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Members of the public, local officials, state officials, and members of the media attended the meeting and were offered the opportunity to question the NRC regarding Peach Bottoms performance and the role of the agency in ensuring safe plant operations.

/RA/

Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects

Enclosures:

Public Meeting Sign in Sheet

ML12116A081).

The NRC presented poster boards and handouts, met with members of the public, answered questions and listened to statements from members of the public, and were available to discuss its assessment of the safety performance of Peach Bottom Units 2 and 3 for the period of January 1 through December 31, 2011, as documented in our letter dated March 5, 2012 (ADAMS Accession No. ML12060A130). The NRC poster boards presented included background on the Reactor Oversight Process (ROP). Additional information relative to the NRC's Annual Assessment Process and the safety performance of Peach Bottom Units 2 and 3 can be found on the NRC's web site at: www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Members of the public, local officials, state officials, and members of the media attended the meeting and were offered the opportunity to question the NRC regarding Peach Bottoms performance and the role of the agency in ensuring safe plant operations.

/RA/

Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects

Enclosures:

Public Meeting Sign in Sheet Distribution:

W. Dean, RA J. Clifford, DRP S. Hansell, DRP, SRI D. Lew, DRA P. Krohn, DRP A. Ziedonis, DRP, RI D. Roberts, DRP A. Rosebrook, DRP S. Ibarrola, DRP E. Miller, DRP S. Schmitt, DRP, OA DOC NAME: G:\DRP\BRANCH4\ASSESSMENT (EOC, MC)\ROP 12\2011 EOC\PEACH BOTTOM\PB 2011 AAM MTG

SUMMARY

.DOCX ADAMS Accession No.: ML121231A088

Non-Sensitive  ; Publicly Available
SUNSI Review Sensitive Non-Publicly Available OFFICE mmt RI/DRP RI/DRP NAME ARosebrook/AAR PKrohn/PGK DATE 05/08 /12 05 /09 /12